AD consolidation activities in LS2

Slides:



Advertisements
Similar presentations
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Advertisements

Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Status of handling studies for PSB-LIU Caterina Bertone EN-HE LIU-PSB 17/09/2015 Courtesy: A. Newborough EDMS
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
AD status in 2012, foreseen consolidations at AD ADUC 20/11/2012T. Eriksson CERN BE/OP.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Status of the AD ADUC 13/6/2012T. Eriksson CERN BE/OP.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Status and Prospects for the AD and ELENA
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Antiproton Decelerator (AD) Consolidation ADUC 13/1/2015T. Eriksson CERN BE/OP1.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
How to keep the SPS running for another 25 years V. Chohan ( based on Input from N. Gilbert & many Equip. Groups) IEFC Workshop 12 th Feb 2010.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
TE-CRG Activities D. Delikaris, TE-CRG.
LSC May 2013 Outcome of the magnets tests from the PS, Leir and transfer lines Dominique Bodart.
ELENA KICKERS AND SEPTA ELENA Meeting, Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Linac4-PSB 160 MeV connection readiness review
CONS and HL-LHC day Analysis of needs from TE-EPC
TE-MSC activities in SPS during LS2
Francois and Lau EATM 17 July 2012
ELENA installation and commissioning status
LIU – EVM status and next steps
SPS - EYETS 2016/17 Vacuum systems planning
on behalf of the RF group
Planning and Installation
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek
TE-ABT Activities for LS2
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
Renovation of the 45-year old PS magnets
SPS activities during LS2 TE-EPC (Power Converter Group)
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
Proposal for the modification of building 151 in view of the LS2 PS main magnet and TT2 consolidaiton projects Dominique Bodart TE-MSC-MNC 29/09/2017.
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
Experimental Areas – LS2 planning
ATS Consolidation Day 22nd May 2019 Beam Instrumentation
East Hall under construction
Presentation transcript:

AD consolidation activities in LS2 T.Eriksson BE/OP/AD

Introduction Most of AD dates from ~1985 => Main components are > 30 years old…. A small consolidation program (~2.3 MCHF), separated from the LHC program, started in 2009 in view of running AD until 2016 or so After approval of the ELENA project, the scope of the consolidation increased and is aimed at continued operation of AD for at least 10-15 years after ELENA physics has started which means 2030 - 2035 Concerned items are: Target area, magnets, power converters, beam cooling, control system, Instrumentation, beam transfer equipment, RF, vacuum, Infrastructure etc. A major consolidation program with a budget plan of 23.8 MCHF was started in 2014. LS2 activities => majority of items will be completed

Target Area – LS2 EDMS# 1548086, 1537538, 1548296 Consolidation under EN/STI responsibility, main items only briefly mentioned here: B196 (T.A. ventilation, target/horn cooling, RAMSES), new building to replace temporary shielding block structure. New target design; air cooled instead of water cooled Manufacturing of new Magnetic Horns Re-design of target/Horn trolleys New ventilation system Magnet re-design and spares Instrumentation, services, safety systems, infrastructure,… etc.

Target Area work packages 1) https://edms.cern.ch/panoramas#id=36410861&lon=0.00&lat=0.00&fov=90.00 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) Courtesy C.Torregrossa EN/STI 16)

Magnets AD ring AD ring: 16 BHN, 8 BHW, 28 QW, 27 QN, 2 QS. BHN re-shimming campaign ongoing with 1-2 units/year BHN 06, 23, 24, 33, 34 renovated, BHS 52 planned for YETS 17/18 Remaining 10 units to be done in LS2 BHW less urgent – needs and schedule to be defined QW/QN/QS in-situ repair campaign completed ~ 10 years ago QN/QS: New campaign prompted by QDS01 problem QDS01 repaired in-situ due to difficult access. QDN33 repaired in workshop since adjacent BHN33 was anyway removed (EYETS 16/17) Complete EYETS 16/17 measurement campaign showed only a few units with small (0.3mm) coil movement Units adjacent to BHN:s removed for renovation will be done at the same time (QN 55 and 56 in YETS 17/18). QW less urgent – more robust clamping system, no action to be taken

51 5 Under consideration by TE/MSC: BHN renovation to be completed in LS2 – 10 units remaining Adjacent QN:s to be treated at the same time, total number depends on space and tooling availability 46 45 11 12 40 39 17 18

Power converters Magnetic Horn pulser (TE-ABT) EDMS#1556057 Complete renewal of old system employing mercury switches B195 Pulsed power converters for injection line magnets (TE-EPC) EDMS#1549323 New capacitor discharge design, MegaDisCap/MarxDisCap 12 units to be replaced, 4 already operating Assuming successful construction of new permanent magnets in target area: Q9050 & Q9052 converters will no longer be needed B370/B193

RF & Stochastic cooling C02: New Finemet cavity to be installed in sector 01, including new DSP-based low-level system. EDMS# 1552197 C10: no activity planned inside AD ring enclosure C10 Final stage: Not yet defined; waiting to test refurbished TH116 Triode vacuum tubes in 2018. C10 Electronics upgrade. Stochastic cooling: Under discussion, (fellow has been requested) Amplifier upgrade. (on top of shielding sector 03/04). 50% of amplifiers to be dismantled. TBC. EDMS# 1689140 Stochastic cooling: pickup tanks renovation, Under discussion, no conclusion yet. TBC. Sector 03/04

Vacuum Completion of the consolidation program EDMS#1555723 Ion pumps, bake-out equipment, vacuum chambers; will be completed in LS2 ELENA transfer lines Installation Ion pump and instrumentation reconfiguration DEM line ? Vaccum activities related to actions on AD equipment: Ring magnet renovation New electron cooler Stochastic cooling kicker tanks Target area window displacement in FTA line

Infrastructure New Cryo distribution to experiments. TBC. Draft5. EDMS#1562701 Demineralised water cooling station renovation. EDMS#1548299 12 months duration during LS2

Instrumentation & electron cooler Installation of new electron cooler in sector 29 during second half of LS2. TBC. Document to be published. BCCCA & cryostat: No intervention planned needing access through shielding (sector 15)

RF C02 Stochastic cooling Electron cooler