Building Committee April 20th, 2016.

Slides:



Advertisements
Similar presentations
RICHVIEW LIBRARY- Ground Floor Interior Renovation TABLE OF CONTENTS Submission for OLA Library Building Award 2012 Richview Library – Ground Floor Interior.
Advertisements

Crescent Academy International
St Andrews School A Tour Of The School By Daniella.
Want to see the inside of my House? Follow me, for a guided tour You MUST have PowerPoint viewer to see this presentation Click your mouse to advance the.
Occupancy Classifications and Loads
Cathedral of the Immaculate Conception Project Information Session.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Heritage Hall/Rare Book Collection Renovations, 2012.
This is our school A new part was built in 2004 to cover the need of space. A new part was built in 2004 to cover the need of space. We have got a beautiful.
Current Project Update October 25th 2012 Good Evening!!!
Congregation Survey Summary & Program Statement KATY first united methodist church August 30, 2009.
Building Expansion Project Update ECCC 4.9 Growth Strategy We will continue to grow as a “one site multi congregations & services” church.
IRC 2009 Habitable Attics.
Building Plan Presentation The Evangelical Lutheran Church of The Holy Trinity.
Building Project Update January Contents Recap Options Order of Cost Where do we go from here?
Logo. PRELIMINARY SITE PLAN PROGRAM GOALS Embrace & live out our Mission Grow in commitment to Christian living through: Education, Worship, Stewardship,
ECCC Growth Strategy. Average Sunday Attendance ,006 1,120.
FAMILY ROOM & STAIRS Entertainment center & projection TV With pullout drawers Maximize under stairs space Half-wall, railing & spindles NOTES: Open room.
Kitchen: fridge resting on debris blocking entrance to utility room.
ADDITION & REMODEL Eugene Field Elementary School.
Grace Bible Church Ministry Goals & Master Plan Presentation.
1. 1 3/14/11 Church Conference 14-Mar-11 Welcome and Introduction Opening Prayer Presentation of Building Project Motion to Approve Project Vote on Proceeding.
AF SHCR Smoky Lake, Alberta PROPOSED SITE PLAN Office Entrance Formal Entrance Primary Entrance Youth & Wheelchair Entrance.
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
March 12, 2015 Ss. John & Paul Catholic Church Feasibility Study.
Lori Levine Interiors, Inc. Custom Designed Environments
POV Renovations November 14,2014. Repairing the East Wall.
Deerfield Elementary School Deerfield Elementary Overview of Deerfield Renovation October 8, 2015.
AT – 201 Introduction to Architecture Dan Trent August 28,
Planning For Oakbrook House!. Ground Floor In Oakbrook.
THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.
Family Life Center / Youth Center 201 Music Office 216 – 217 Children’s Classroom 202 – 203 future use 218 Kid’s Klub 204 old sanctuary 219 – 220 Storage.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
School Media Center Facility Designs Angela Bates SLIS 5130 – Spring 2010 April 9, 2010.
Library Renovation Projects Capital Improvement Plan 2009 – 2014.
Lincoln Public Schools Lincoln, Nebraska Lincoln Public Schools Work Session 10-Year Facility and Infrastructure Plan Update October 22, 2013.
Presents 33 C O L C H E S T E R RO A D W e s t o n, M a s s a c h u s e t t s 13 Room Colonial with 5 Bedrooms, 4 Baths, 2 ½ Baths,
Sauriol Bohde Wagner architects and associates, inc Garfield Road Macomb, Michigan ph fx.
Welcome to the Stafford Elementary Town Hall Meeting! January 12, :30-7:30 pm Mary W. Foreman, Stafford Elementary Principal Alexis White, Stafford.
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
Frothingham Hall Renovation Easton, MA June 21, 2010 architecture interior design urban design cbtarchitects.com.
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
Town House located at the suburb Taftalidze II , Skopje
CHAPTER 2 Basic House Designs
Cornwall Central School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Bell Work- Review What are the three types of floor plans?
Penn Medicine Chester County Hospital
Capital Improvements Presentation
Occupancy Classifications and Loads
Interior Design Designing Functional Interiors & Floor Plans
Architectural Design Styles of Houses.
Plant & Facilities Department
Facilities Update November 17, 2017
Clydebank Town Centre Office.
Occupancy Classifications and Loads
Athletic Alternate Opportunity
East Rosedale Street Improvements and Master Plan Priority Projects
The Framers Gallery FRONT CENTER KITCHEN ENTRANCE BACK WC
Loudenslager Elementary School Pointing and Brick Repair.
Cafeteria Entrance to media center
Cafeteria exit exit Entrance to media lobby 12
KUSA NATIONALS FINALS AND AWARDS HALL PLAN – SAX ARENA, Irene
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Master Facilities Committee Evaluation and Identification
Factors in residential design/Traffic patterns
Floor Plans and Symbols
Phase II Committee Forrest Barber Johnny Davis Mike Hannon Brandon Harwood Kelly McKay Jim McCoy Becky Roberts.
My house.
Presentation transcript:

Building Committee April 20th, 2016

Family Life Center (FLC) Renovations Finding and Proposals Family Life Center (FLC) Renovations

Bath Rooms With Showers General Events Volley Ball Basket Ball Family Life Center – First Floor Bath Rooms With Showers General Events Volley Ball Basket Ball Entrance Class Rooms Tables & Seating Kitchen Area Bleachers

apartments or additional class rooms Additional class rooms Family Life Center – Second Floor Space is large enough for missionary apartments or additional class rooms Additional class rooms Open Below to Gym Floor Connection Attic Unfinished Spaces

Roof & Outer Shell Second Floor (Unfinished) First Floor Volley Ball FLC 3D Floor Overviews Roof & Outer Shell Second Floor (Unfinished) First Floor Volley Ball Tables

Site Overview with FLC attached Family Life Center Site View Site Overview with FLC attached Family Life Center FLC attached behind existing offices Youth building sort of.. Current HVAC Location Front of Church

Conference room relocated Library relocated Changes to the interior to make the connection Conference room relocated Library relocated Offices will be changed Shorter distance and no stairs Seniors have a long distance & stairs to travel

Hall way traffic Drainage Roof maintenance FLC connection The sum of issues lead to another concept. Hall way traffic Drainage Roof maintenance FLC connection

New Roof Planes New Welcome Center

Questions or Comments?