Advanced hybrid detectors in Oxford: Facilities, experience, and interests Arndt, Bortoletto, Placket, Shipsey.

Slides:



Advertisements
Similar presentations
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Advertisements

Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
ATLAS Module building at Glasgow
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
Abraham Gallas (USC-IGFAE) Strips and Pixels for the VELO upgrade.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
WP6: Quality Assurance and Reliability Testing A. Honma, CERN PH/DT 30 April 2010DT Steering Board Meeting, A. Honma1  Mandate  Manpower and Resources.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
P3MD Labs Introduction to the facilities of the Purdue Experimental Particle Physics research groups.
Institute of Physics ASCR, Prague Strip Sensors R&D for SCT and ITk Marcela Mikeštíková.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
ILC Vertex Tracker Ladder Studies At LBNL M Battaglia, D Contarato, L Greiner, D Shuman LBNL, Berkeley.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Highlights of space sensor developments in Spain 1st SPACERAD meeting Brussels, 12 November 2002.
BNL Role In ITK 1.Current R&D Roles 2.Proposed Production Role 3.Activities now until TDR (early 2017) 4.Resources and Infrastructure 5.Personnel 1 D.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
13 Nov Dimitris LOUKAS Name of the Institution : NCSR Demokritos Contact person: Dimitris LOUKAS
ATLAS UK Tracker Upgrade AIDA-2020 Transnational Access Facility
Test of Single Crystal Diamond Pixel Detector at Fermilab MTEST Simon Kwan Fermilab April 28, 2010.
Phase 2 Production Discussion We would like to review the conclusions reached at Caltech on US involvement in the phase 2 outer tracker This will be presented.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
Dec
Timepix test-beam results and Sensor Production Status Mathieu Benoit, PH-LCD.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
Oct. 16, 2014 G.-F. Dalla Betta Preparazione ITk Kick-Off Meeting Nome e CognomeRuoloFTE Gian-Franco Dalla BettaPA, UniTN40% (resp. loc.) Roberto MendicinoDott.,
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
The SuperB Silicon Vertex Tracker Abstract : The SuperB project aims to build an asymmetric e+ - e- collider capable of reaching.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Dima Maneuski, Advances in rad-hard MAPS 2016, Birmingham
10-12 April 2013, INFN-LNF, Frascati, Italy
Santiago in DEPFET for SUPERBELLE
HV/HR CMOS in Oxford: Facilities, experience, and interests Arndt, Bortoletto, Huffman, Jaya John, Nickerson, Placket, Shipsey, Vigani.
T. Bowcock University of Liverpool
Jaak Lippmaa HIP, Helsinki University
Preliminary results from 3D CMS Pixel Detectors
BaBar Silicon Tracker Perspective
+ Steve Worm (since Monday)
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
ICHEP02 Chris Parkes ALICE m2 Pixels+Drift+Strips LHCb m2
Micro-channel Cooling
June 22, 2017 Burkhard Schmidt for the DT coordination team
Hybrid Pixel R&D and Interconnect Technologies
Status Caltech meeting – discussions of assembly centers, US responsibilities We will try to organize a PS module assembly workshop at Brown April 30 –
HR-HV CMOS activities and plans at Glasgow
Vertex Detector Mechanical R&D Design Questions and Issues
BOND/QART Lab and Pixel R&D
EENP2 Silicon Detectors.
The SuperB Silicon Vertex Tracker
UK RFD Pre-Series cryomodule
(with R. Arcidiacono, A. Solano)
Silicon Strip Detector on ATLAS
2017 AFP Beam Tests AFP has 1 week as main user and will also measure together with ATLAS ITk Pixel in H6B -> 2 periods of ~3 weeks
Pixel DAQ and Trigger for HL-LHC
Summary of 3D SINTEF CMS pixel sensors R&D at Purdue
HVCMOS Detectors – Overview
Sidet Facilities A snap shot of space and equipment at Sidet and their current use Projected future uses and upgrades Hogan Nguyen, Fermilab May 22nd 2007.
ERDIT – cost proposal.
L H C A T L A S International Collaboration on the LHC Project
アトラスシリコン半導体飛跡検出器:ATLAS Silicon-strip Tracking Detector
Budget Zhijun Liang IHEP Sept. 27, 2017.
HL-LHC upgrade at IPHC news
Setup for testing LHCb Inner Tracker Modules
Sensor Technology group
Possible Cygnus Sites: Kamioka, Japan
Presentation transcript:

Advanced hybrid detectors in Oxford: Facilities, experience, and interests Arndt, Bortoletto, Placket, Shipsey

Oxford Particle Physics Microstructure Detector Laboratory - OPMD Currently Under construction – expected completion in Oct 2015 Focused on generic R&D and ITK Strip/Pixel Module production Clean Rooms 160 m2 of class 10,000 clean room 35 m2 of class 100 clean room Vacuum, Dry Compressed Air, Nitrogen & DI water as piped services Equipment Semiprobe 300mm probe station with thermal chuck (delivery this month) Hesse Bondjet 820 automatic wire bonder (delivery expected Oct/Nov) Dage 4000Plus pull tester (Oct/Nov) OGP CNC500 Smartscope optical metrology system (Oct/Nov) Keyance VHX500 digital inspection microscope (Oct/Nov) Weiss Thermal chamber WTL100 (+50oC –> -50oC) (Oct/Nov) Henniker Bench top Plasma Cleaner (Oct/Nov) Aerotech pick and place assembly gantry (Sept/Oct) Nordson EFD Glue Robot (Delivered this week) HV-CMOS Infrastructure 09 May 2018

Oxford Particle Physics Microstructure Detector Laboratory - OPMD Currently Under construction – expected completion in Oct 2015 Focused on generic R&D and ITK Strip/Pixel Module production Clean Rooms 160 m2 of class 10,000 clean room 35 m2 of class 100 clean room Vacuum, Dry Compressed Air, Nitrogen & DI water as piped services Equipment Semiprobe 300mm probe station with thermal chuck (delivery this month) Hesse Bondjet 820 automatic wire bonder (delivery expected Oct/Nov) Dage 4000Plus pull tester (Oct/Nov) OGP CNC500 Smartscope optical metrology system (Oct/Nov) Keyance VHX500 digital inspection microscope (Oct/Nov) Weiss Thermal chamber WTL100 (+50oC –> -50oC) (Oct/Nov) Henniker Bench top Plasma Cleaner (Oct/Nov) Aerotech pick and place assembly gantry (Sept/Oct) Nordson EFD Glue Robot (Delivered this week) HV-CMOS Infrastructure 09 May 2018

Planar sensors Beam tests Lab I-V measurements Participated in the evaluation of thin n-on-p sensor fabricated on a variety of substrates for the CMS Hamamatsu campaign Beam tests Lab I-V measurements HV-CMOS Infrastructure 09 May 2018

3D sensors Beam test results after 7 E14 neq/cm2) Normal incidence SINTEF, FBK, CNM Beam test results after 7 E14 neq/cm2) Normal incidence 200 incidence

Interests and Possible Contributions We are especially interested in: Task 7.4 Detector validation for tracking devices Characterisation of 3D and planar hybrid pixel sensors with laboratory measurements and beam-tests to demonstrate sufficient tracking capabilities in the high radiation and occupancy environment of the ATLAS and CMS pixel systems at HL-LHC Validation of thin hybrid pixel detectors for application at the Vertex pixel detector at CLIC with laboratory measurements and test-beam campaigns, after hybridisation to the CLICpix readout chips HV-CMOS Infrastructure 09 May 2018