Accelerator Controls Renovation Project “ACCOR”

Slides:



Advertisements
Similar presentations
FESA 3 Implementation Status Stephane Deghaye BE/CO On behalf of the FESA team and many users.
Advertisements

WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
Dr. José Miguel JIMENEZ LS2 Coordinator LHC Performance Workshop (Chamonix 2014) Session 8 - Long Shutdown 2 Strategy and Preparation Chair: José Miguel.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Barriere O, Le Roux P
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Roles Committees Meetings
TS, Length of YETS EYETS LIU & CONS Project
Stephane Deghaye (AB/CO) ATC/ABOC days.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Application Development for Operations in the Coming Years Mike Lamont.
1 1. Some recent views ( ) 2 Linac tunnel
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
CERN Control Standards Front-End Computer Layer Stéphane Deghaye BE/CO/FE
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
26 Jan 06Marine Pace - AB/CO1 LEIR Controls : Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
AT Control Forum First Meeting. Introduction  The AT Controls FORUM :  Is responsible for coordination of the overall strategy for controls activities.
LS1 Review P.Charrue. Audio/Video infrastructure LS1 saw the replacement of BI and RF analog to digital video transport Was organised in close collaboration.
Jan 23rd, 2008M.Vanden Eynden on behalf of the AB-CO Group1 AB-CO MTTR & Spare Part Policy for the LHC Injectors, Experimental Areas & other Facilities.
BE-CO Presentation FESA and O/S Support Post-ACCOR renovations until LS2 Front-End Platforms BE-BI TB, May 21 st, 2015 M.Vanden Eynden on behalf of BE-CO.
Feedbacks from EN/STI A. Masi On behalf of EN-STI Mathieu Donze` Odd Oyvind Andreassen Adriaan Rijllart Paul Peronnard Salvatore Danzeca Mario Di Castro.
Booster identification/disconnections Follow-up Enlarged project meeting, E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project.
The ACCOR Project Status Report and Outlook for 2010 and beyond M.Vanden Eynden on behalf of the ACCOR Project Team 1M.Vanden Eynden (BE/CO) - IEFC Workshop,
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Standby Services or Reliance on Experts for Accelerator control? Claude-Henri Sicard AB/CO ATC/ABOC Days 2007.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
CLIC Interlock System study: from Principle to Prototyping Patrice Nouvel TE-MPE-EP TE-MPE Technical Meeting : 22/03/2012.
Stephane Deghaye (AB/CO) The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Motivations & Objectives.
– Machine Controls Coordinators (MCC): team and role – Overview of renovations during LS1 – Proposal for after-LS1 Commissioning organization ACCOR PROJECT.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
Proposal: Use of ECRs for “Controls” Changes and Renovations Rende Steerenberg, Samy Chemli, Marine Gourber-Pace, Klaus Hanke, Verena Kain, Bettina Mikulec,
The OP Viewpoint on the Accelerator Complex Controls Renovation R. Steerenberg on behalf of the OP group Accelerator Complex Controls Renovation Workshop.
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
LS1 Review BE-CO-SRC Section Contributions from: A.Radeva, J.C Bau, J.Betz, S.Deghaye, A.Dworak, F.Hoguin, S.Jensen, I.Koszar, J.Lauener, F.Locci, W.Sliwinski,
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
CERN/BE/CO – Claude Dehavay - Sept.2016 (with input from Z.Zaharieva and M.Vanden Eynden) 1.
V4.
AFC 2017 (and 2018) AFC timeline:
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
Status and Plans for InCA
LIU – EVM status and next steps
EC Activities Status for the LIU
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
M.Jonker CTC MPO-WG status
Installations, modifications, consolidation in 2005:
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
HIE-ISOLDE Project: Planning & Resources
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
Experimental Areas – LS2 planning
East Hall under construction
Presentation transcript:

Accelerator Controls Renovation Project “ACCOR” ATOP Days, March 4-6 2009 Project description with an emphasis on operational aspects for 2009 3/4/09 M.Vanden Eynden - BE/CO

AGENDA Workshop Dec,2008 ACCOR Project organization Roadmap for 2009 Motivations for controls renovation Scope of work Main outcome ACCOR Project organization Work breakdown structure Context and interfaces Roadmap for 2009 Technology design and validation Operational objectives Conclusions 3/4/09 M.Vanden Eynden - BE/CO

AGENDA Workshop Dec,2008 ACCOR Project organization Roadmap for 2009 Motivations for controls renovation Scope of work Main outcome ACCOR Project organization Work breakdown structure Context and interfaces Roadmap for 2009 Technology design and validation Operational objectives Conclusions 3/4/09 M.Vanden Eynden - BE/CO

Workshop Dec, 2008 Motivations for Controls Renovation From the Organization point of view … The benefits of the co-operative LHC model Time to end the PS Complex legacy situation AD, CTF, REX ISOLDE must be treated From the Technical Stand point … Critical Front-end Hardware and Software situation Application Software rationalisation 3/4/09 M.Vanden Eynden - BE/CO

Workshop Dec, 2008 Scope of Work DOMAIN Responsibility Material Budget Human Resources Front-End Hardware Platforms and Form Factors AB/CO +++ + Generic Front-End Hardware Modules ++ FESA Framework N/A Front-End software (+ specific Hardware) ATB, BI, BT, CO, PO, RF,… InCA (LSA, Acq Core, CBCM, …) AB/OP Specific High Level Applications 3/4/09 M.Vanden Eynden - BE/CO

Workshop Dec, 2008 Main Outcome Motivations largely shared by equipment groups and OP Equipment groups provided clear figures in terms of: Equipment inventory Priorities for renovation Available resources AD, CTF, REX-ISOLDE are included Renovation Time scale : 2009-2011 Management asks to put in place a Project in order to clarify the operational objectives, provide clear budget estimates and start the renovation 3/4/09 M.Vanden Eynden - BE/CO

AGENDA Workshop Dec,2008 ACCOR Project organization Roadmap for 2009 Motivations for controls renovation Scope of work Main outcome ACCOR Project organization Work breakdown structure Context and interfaces Roadmap for 2009 Technology design and validation Operational objectives Conclusions 3/4/09 M.Vanden Eynden - BE/CO

ACCOR Project Organization Work Breakdown Structure (WBS) Purpose Decompose project in activity domains Identify work packages (WP) for each domain Define WP responsibility Will govern the strategy for Project tracking Covers Accelerator systems and core controls components 3/4/09 M.Vanden Eynden - BE/CO

DRAFT for approval by CO3 ONTR OL S R E NOVAT I ON WB Management Project Leader , M.Vanden Eynden (BE/CO) Budget BE-CO Budget , M.Draper (BE/CO) Consolidation Budget , S.Baird (EN/MEF) Controls Core InCa Software , S.Deghaye LSA, CBCM, ACQ Core, … Front-End Software , C.H.Sicard (Q3 2009), A.Radeva Generic FESA Classes, FESA 3.0 Specs, … Data Management , R.Billen Controls Config DB, Layout DB, … Hardware Platforms & Topology , N.de Metz-Noblat VME, PICMG1.3, cPCI, Linux,… Hardware Modules & Device Drivers , J.Serrano ADCs, DACs, MIL-1553, FIP, WR, … Systems Beam Instrumentation , L.Jensen (BE/BI) Beam Transfer , E.Carlier (TE/ABT) Controlled Access , P.Ninin (GS/ASE) DRAFT for approval by CO3 Dumps and Targets , A.Masi (EN/STI) Interlocks , B.Puccio (TE/MPE) Power Converters , Q.King (TE/EPC) Radio Frequency , A.Butterworth (BE/RF) Vacuum , I.Laugier (TE/VSC) Procurement & Installation Field Installation & Coordination , C.Dehavay (BE/CO) Hardware Purchase & Spares , Ch.Gayraud (BE/CO)

ACCOR PROJECT – CONTEXT & INTERFACES Injectors & Experimental Facilities Committee (IEFC) P.Collier Controls Coordination Committee (CO3) Mandate in preparation LHC Injectors Consolidation Project S.Baird BE, EN, GS Controls Mngmt E.Hatziangeli R.Saban T.Petterson Accelerator Controls Renovation Project (ACCOR) PL : M.Vanden Eynden + Project Team BE-CO TC V.Baggiolini LHC INJECTORS Coordination R.Steerenberg + R.Scrivens + … LIN3, LEIR: *M.Pace LIN2,PSB,CPS: *TBC SPS: *M.Sobczak AD Coordination T.Eriksson *M.Cattin CTF Coordination L.Rinolfi *M.Draper REX-ISOLDE Coordination F.Wenander & T.Giles *F.Locci (*) : BE-CO Controls Machine Coordinator

http://wikis.cernch/display/ACCOR/Home 3/4/09 M.Vanden Eynden - BE/CO

AGENDA Workshop Dec,2008 ACCOR Project organization Roadmap for 2009 Motivations for controls renovation Scope of work Main outcome ACCOR Project organization Work breakdown structure Context and interfaces Roadmap for 2009 Technology design and validation Operational objectives Conclusions 3/4/09 M.Vanden Eynden - BE/CO

Roadmap for 2009 Organization Q1 2009 : Get CO3 Committee in place balance, with all parties involved, the output of the Dec,2008 workshop with the new LHC planning Define a first roadmap System level view (BI, RF, BT, CO, …) Accelerator view (LINAC2,3, LEIR, …) Build agreement on budget lines BE-CO operational budget for LHC injectors (via consolidation) Case by case agreement for non-LHC injectors (work started for AD) 3/4/09 M.Vanden Eynden - BE/CO

Roadmap for 2009 Technology Development Until Q4 2009 : Continue the design and validation of the new generic hardware and software controls solutions: Front-End Level New hardware reference platforms for VME and PCI (Linux) New hardware modules (MIL-1553, Function generators, …) Generic FESA classes (Generic I/O, Function generators, etc …) Inca software For 09, keep the periodic MD approach 2-day MD in week 16 to validate the shutdown work 6-hour MD every 2 months (June, August...) to asses the development status 1st operational version after summer 3/4/09 M.Vanden Eynden - BE/CO

Roadmap for 2009 Validation and integration with Equipment Groups Q1-Q2 2009 : Provide new technology and dedicated test facilities Start first specific FESA application prototypes Operational objectives Strong involvement of BE-CO representatives and BE-CO controls coordinators Front-End Level Define a first set of realistic operational deployment objectives, taking into account system criticality, field impact and operational planning Inca Level Test version of YASP (Steering)  start-up WireScanner application  start-up 1st version of the FunctionEditor  mid-09 Infrastructure for newly developed applications e.g. New MPS editor  ongoing 3/4/09 M.Vanden Eynden - BE/CO

Conclusions Motivations are shared amongst all parties ACCOR Organization almost in place and subject to approval at CO3 level Budget aspects must be finalized asap 2009 will be used to validate the new technology in partnership with the equipment groups New LHC schedule has clearly an impact on the operational objectives of the ACCOR project and alternative strategies will be discussed asap with OP representatives Continuous LHC software support will be required Longer support for existing hardware systems will be required, as field modifications will be limited Use non LHC-filling periods to test Inca Use non-LHC injectors for first Front-end hardware validations? Few operational deployments must take place in 2009 in order to validate the solutions 3/4/09 M.Vanden Eynden - BE/CO

Useful Links Accelerator Controls Renovation Workshop http://indico.cern.ch/conferenceDisplay.py?confId=45392 ACCOR Project Information Page http://wikis.cern.ch/display/ACCOR/Home Accor Project Planning http://issues.cern.ch/browse/ACCOR Inca Information Page http://wikis.cern.ch/display/InCA/Home 3/4/09 M.Vanden Eynden - BE/CO