CHIGO VRF System Commissioning.

Slides:



Advertisements
Similar presentations
Wall Mounted J series Troubleshooting.
Advertisements

Operating Functions.
Daikin Altherma™ Troubling Shooting
1) The Meaning of the First Alphabet
TROUBLESHOOTING. 5WSS TROUBLESHOOTING ERROR CODEFAULTY INDICATION E1ROOM SENSOR CONTACT LOOSE E2INDOOR COIL SENSOR CONTACT LOOSE E3WATER OUTLET SENSOR.
HEAT PUMPS.
Refrigerators.
Page 1 MDS Installation. Page 2 Contents  Introduction  Outdoor Unit Installation  Indoor Unit Installation  Refrigerant Pipe Work  Gas Charge 
38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
Tennessee Technology Center Center at Pulaski. Superheat & Sub-cooling A Technician’s Guide to HVACR Diagnostics.
EXPANSION VALVE SYSTEM
Cooling Only 38MFC/ 40MFC Heat Pump 38MFQ/ 40MFQ
Product Introduction.
The new Super Multi from TCUK
1 Air Conditioning Pressure Switches. 2 High Pressure switch Used to protect the compressor When condensing temp gets too high Reads High Side Pressure.
MDS Smart Commander.
Index Sr No. Description Slide no. 1
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
General Troubleshooting Tips.
Perfect solution for large building
Air Conditioning Circuit
MDS COMMISSIONING.
TECHNICAL TRAINING INVERTER-Y
Air Handler Terminology
MDS Monitoring Software. Page 2 Contents  Introduction  User Interface  Service Personnel Interface  System Requirement  Demonstration.
Air Handler Terminology
David Garvin Product Manager EarthDirEX Geothermal Copyright © 2015 Nortek Inc. All rights reserved.
For Multiple refrigeration system
EEV-KIT For Single refrigeration system. Preliminary information, all of contents are subject to final confirmation by MHI 2 Contents 1. Single refrigeration.
Principles of correct VRV Installation A. Refrigerant pipe work
TECHNICAL TRAINING 2007 CONTROLLER PROGRAM UPGRADE.
Why Maintenance Tasks are Important Produced by Joe Marchese.
TECHNICAL TRAINING SMART COMMANDER System Requirements CPU : 800MHz and aboveCPU : 800MHz and above Memory : 256MB RAM or HigherMemory : 256MB.
TECHNICAL TRAINING INVERTER-Y
Pressure-Enthalpy and the Variable Refrigerant Cycle
Compressor Replacement – ODU
MCQUAY DIGITAL SCROLL SYSTEM
BasicRefrigerationSystem 4 Component Flow Diagram.
Problem Solving using Error Code Saijo Denki Inverter R-410A
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. 5 August 2014.
DC Inverter Mini VRF Reference projects Reference Project Mini and Multi Improvements Product line -up.
Refrigerant system of Inverter R-410A. denki.co.th Model type Model : Stand Model : Duct Model : Cassette Model : Wall mount Model : Wall and.
AIR CONDITIONING (COOLING)
Product: Air conditioner Training Manual Editor: Hao Guanghui
Air condition installation
James McIntyre VRF Training Manager V5 Key Components.
Refer to Service Manual for details Fault codes. To retrieve fault codes from the remote controller Press the ‘CHECK’ button for approximately.
2013 CHIGO Product CHIGO CMV VRF Control System.
CHIGO HVAC Product Introduction.
Duct Free System.
CMV-NET Chigo VRF Network Centralized Control System
Pressure Regulators KVR + NRD Presentation , Jbm - Page 1.
VRF Trouble Shooting 采用midea通用PPT模版, 参考《公司简介》PPT.
delivered with the compressor
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
The Step by Step Charging Techniques
Training for DVM air-conditioner
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
7. Test operation.
AHU connection kit.
DC Inverter Air-cooled Chiller Aqua Tempo Super II Series
TECHNICAL TRAINING 2007.
Fault codes.
R3 Controls, Valves, Accessories & Heat Pumps
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
MDS Smart Commander.
By: JAGDEEP SANGWAN Refrigeration Basics 101.
Error codes for split systems
Presentation transcript:

CHIGO VRF System Commissioning

Content 01 Check before start 02 Check Operation

Power wire / Signal wire 1.Check before start Power wire / Signal wire All the electric wiring is finished? Wire specification are correct? Power wire are well insulation? Well connection? Refrigerant pipe & insulation Gastight & vacuum dry Additional refrigerant charge Check valves

Power wire / Signal wire 1.Check before start Power wire / Signal wire Refrigerant pipe & insulation Pipes diameters are correct? Pipes are well insulation? Gastight & vacuum dry Additional refrigerant charge Check valves

Power wire / Signal wire 1.Check before start Power wire / Signal wire Refrigerant pipe & insulation Gastight test has been passed? Vacuum dry has been done? Gastight & vacuum dry Additional refrigerant charge Check valves

Power wire / Signal wire 1.Check before start Power wire / Signal wire Refrigerant pipe & insulation Refrigerant has been charged correctly? Gastight & vacuum dry Additional refrigerant charge Check valves

Power wire / Signal wire 1.Check before start Power wire / Signal wire Refrigerant pipe & insulation Outdoor valves are opened? All the fans rotate normally? Gastight & vacuum dry Additional refrigerant charge Check valves

Preheat Error check Trial operation Operation test Hand to user 2.Check Operation Preheat At least 24 hours Error check Trial operation Operation test Hand to user

Preheat Error check Trial operation Operation test Hand to user 2.Check Operation Preheat Check if there’s any error code display on the PCB of IDU or ODU? Check if the Qty. of IDUs on the ODU LED display is same with actual Qty. or not? Error check Trial operation Operation test Hand to user

Power on whole system ,Check address and capacity code 2.Check Operation Power on whole system ,Check address and capacity code The master ODU LED display the total amount of online indoor units If display No. is not equal to the real Qty. ->Some indoor units have same address or communication wire have problem.

Preheat Error check Trial operation Operation test Hand to user 2.Check Operation Preheat Turn-on all indoor units Error check Trial operation Operation test Hand to user

Preheat Error check Trial operation Operation test Hand to user 2.Check Operation Preheat Check indoor units: Setting 17℃ in cooling model High speed Running more than 4 hours Check Temp. -> Temp. difference between air intake and outlet of each indoor unit should be bigger than 10℃。 Error check Trial operation Operation test Hand to user

Preheat Error check Trial operation Operation test Hand to user 2.Check Operation Preheat Check for outdoor unit: Discharge and suction temperature of compressors Pressure of systems Running current Any abnormal noise, vibration Record the operation parameter Error check Trial operation Operation test Hand to user

System pressure and temperature check 2.Check Operation System pressure and temperature check Inverter VRF system at Cooling mode ( reference data) R410A OD20 OD30 OD35 OD43 High pressure (MPa) 2.0~2.5 2.3~2.7 2.8~3.0 3.4~3.8 Low pressure (MPa) 0.8~0.95 0.85~1.0 1.0~1.45 Discharge temp.(℃) 65~70 68~73 70~80 75~90 Suction temp.(℃) 10~14 11~14 11~14 15~25 Indoor air outlet (℃) 12~15 degree (T1 is around 21~27) temp. difference between return and outlet (ΔT) 9~12

2.Check Operation When press the check button, the LED will display operating parameters: LED display Check button

2.Check Operation Press “check” button, outdoor PCB LED will displays operation information Sequence System operation parameters Remarks 1st This outdoor unit address 0, 1, 2, 3, 4 2nd This outdoor unit capacity 8HP, 10HP, 12HP, 14HP, 16HP 3rd Number of online outdoor units Available for master unit only 4th Total capacity of outdoor units 5th Total capacity demand of indoor units 6th Amended capacity demand for the master unit 7th Running mode 0:OFF/ FAN ONLY 2:COOLING 3:HEATING 4:FORCED COOLING 8th Capacity output of this outdoor unit Displays in % 9th Fan speed 0 1 2 3 4 5 6 7 8 9 10th Average temperature of evaporators Actual value 11th Temperature of condenser outlet

2.Check Operation Sequence System operation parameters Remarks 12th Ambient temperature Actual value 13th Discharge temperature of inverter compressor 14th Discharge temperature of fixed compressor 1 15th Discharge temperature of fixed compressor 2 16th Current of inverter compressor 17th Current of fixed compressor 1 18th Current of fixed compressor 2 19th Open angle of EXV_A Actual value = Display value × 8 20th Discharge gas pressure Actual value = Display value × 0.1Mpa 21st Transformer output current 22st Transformer output voltage 23nd The running mode 0 Heating prior 1Cooling prior 2Start prior 3Only heating 4Only cooling 24rd Number of connected indoor units 25rd The last error code or protection code Displays ‘00’, if no error or protection 26rd -- Ends

Preheat Error check Trial operation Operation test Hand to user 2.Check Operation Preheat Daily operation and maintenance explanation Error check Trial operation Operation test Hand to user

Thank you