1 Training for DVM air-conditioner
System Appliances Division Quality Control Group

2 Contents Installation Work Piping installation Charging Refrigerant
2 3 4 Drain hose 5 Outdoor unit installation 6 Installation Work 1 Wiring 7 Testing operation Charging Refrigerant

3 1. Installation Work

4 Installation Process 1. Field surveying and Meeting
Confirm condition/position of out-door unit, ceiling structure, position of drain Indoor unit,outdoor unit, pipe, distribution, drain, power, wire, communication shop 2. Map Drawing Process grasp building, equipment, fire fighting equip 3. Process Plan and a Main power Supply and Demand Plan. Clear position of indoor/outdoor unit 4. Pipe and drain construction 5. abnormal materials / tools check Copper pipe, PVC pipe, adiabatic material, wire,tools - 1 -

5 7. leak test of copper pipe
6. piping Keep pipe diameter/thickness standard:dust,water,airtight keep adiabatic material and thickness (cooling : over13mm, H/P :20mm) 7. leak test of copper pipe (step-1) Input N2 and leak test : 30 kgf/㎠ , keep 10kgf/㎠ when let it more than 1 month until installing keep drain diameter /thickness : confirm damage, leak keep insulated material and thickness : over 5mm 8. drain piping 9. leaking test of drain Test drain slope and containing water

6 14. Test run Install power /communication cable
10. wiring Install power /communication cable 11. Install in/outdoor unit indoor unit -fix anchor strongly, outdoor unit (anti vibration pad) 12. leaking test (step -2) input N2 and leak test : 30 kgf/㎠ 24Hr) 13. panel install on indoor unit and vacuum vacuum : 2hr↑, leave: 1hr↑, maintain 755mmHg↓, 14. Test run noise, vibration, leak, pressure, C/H performance, communication