1 The new Super Multi from TCUK
TOSHIBA The new Super Multi from TCUK

2 Super Multi INTELLIGENCE

3 VRF Heat Recovery Growth
European VRF Segments Heat Recovery Heat Pumps Cooling Only 7% 6% 6% 5% 4% 4% 13% 57% 55% 59% 63% 63% 61% 65% 39% 42% 31% 31% 33% 36% 22% 1999 2000 2001 2002 2003 2004 2005

4 Super Multi INTELLIGENCE
R407C refrigerant Latest inverter technology (Intelligent Power Drive Unit) Sophisticated controls options with interactive intelligence Low weight, compact design with small footprint . Low sound levels

5 Tight fit for an application in France!
Super Multi INTELLIGENCE Small Footprint of SMi Smaller than that of VRF competitors 27% reduction over previous model SMi MAR-F105 Super Multi MAR-F104 -27% Tight fit for an application in France!

6 Super Multi INTELLIGENCE
Model No. MAR-F105HTM8-PE Cooling capacity 25.0 (28.0)kW Heating capacity 28.0 (31.5)kW Dimensions (mm) 1700(h) x 990(w) x 790(d) Power supply v, 3-phase, 50Hz Sound level 58 db(A) . Weight 285 kgs Operating conditions (Heating) -15 to 21ºC outdoor 15 to 29ºC indoor Operating conditions (Cooling) -5 to 43ºC outdoor 18 to 32ºC indoor

7 Super Multi INTELLIGENCE
The performance of a Super Multi in a smaller, quieter, more sophisticated unit It might look like a Modular Multi but don’t try connecting it to another SMi unit! .

8 Intelligent Power Drive Unit
. Super Multi INTELLIGENCE Intelligent Power Drive Unit High Reliability Mechanical relays replaced by electronics Compressor heater control integrated with IPDU Compact Size Small inverter allows better design of outdoor unit

9 Interactive Intelligence
Super Multi INTELLIGENCE . Interactive Intelligence Leading technology for Building Management Systems Windows® based BMS Optional energy monitoring or internet access

10 Reduced Piping Complexity
Super Multi INTELLIGENCE Reduced Piping Complexity Increased reliability 30% reduction in brazed joint connections Ease of Maintenance Improved accessibility to compressor and other components .

11 Super Multi INTELLIGENCE
Features Wrap-around coil Liquid tank 2 in 1 scroll compressor Suction accumulator Sliding tray .

12 Super Multi INTELLIGENCE
. Simultaneous heating and cooling for precise temperature control Design flexibility for building modifications Efficiency by transferring heat within the building

13 Super Multi INTELLIGENCE
On receipt of signals received from the individual indoor units, a modulating valve within the relevant multi controller controls the flow of refrigerant to the indoor unit each circuit of the multi controller has a dedicated modulating valve

14 Super Multi INTELLIGENCE
and in conjunction with a variable speed compressor in the outdoor unit

15 Super Multi INTELLIGENCE
inverter speed increases and is controlled to meet demand 100% 50% 54% . . . fixed speed compressor starts Fixed speed Inverter 4% Inverter compressor starts at 4% if demand is still greater than 50% inverter slows to 4% capacity and and if demand is 50% or greater runs up to full speed (or less if demand is >50%)

16 Super Multi INTELLIGENCE
the required amount of refrigerant is delivered to each indoor unit to match demand.

17 Super Multi INTELLIGENCE
Using one multi controller up to four indoor units may be installed

18 Super Multi INTELLIGENCE
Using two multi controllers up to eight indoor units may be installed

19 Super Multi INTELLIGENCE
Using three multi controllers and an RBC-16DIF1-PE interface up to twelve indoor units may be installed

20 Super Multi INTELLIGENCE
and with four multi controllers and two RBC-16DIF1-PE interfaces up to sixteen indoor units may be installed

21 Super Multi INTELLIGENCE
Multi controller – PCB Sets maximum opening of PMV Data & fault code display Dyna Doctor connection Data & fault code retrieval

22 Super Multi INTELLIGENCE
Data & fault code display Data & fault code retrieval Dyna Doctor connection

23 What are the ‘rules’ for installation?

24 Installation rules All pipes must be of refrigeration quality, hard-drawn or soft copper All copper used must be new and previously unused Pipes must be cut using a pipe cutter – not a hacksaw!

25 Installation rules All cut pipe lengths must be capped after use If in doubt over pipe quality – don’t use it!

26 Installation rules All pipework must be adequately supported and joints not under stress Oxygen-free nitrogen MUST be passed through pipework during brazing All interconnecting pipework should be tested to 10bar using OFN and tested for leaks

27 Installation rules Following the detection and repair of any leaks, pressurise pipework to 30bar with OFN Leave this pressure in the system for at least four hours, recording the pressure and ambient temperature at the start of the test After at least four hours check and record the pressure and ambient temperature and note any pressure loss.

28 Installation rules Following the detection and repair of any leaks evacuate system to remove any remaining moisture After at least two hours evacuation (depending on ambient conditions) start adding the additional refrigerant require for the system Ensure that the refrigerant (R407C ONLY) is charge into the system in its liquid phase – into the liquid line

29 Installation rules Once the system pressure has equalised open the unit’s service valves and operate the unit to draw in the remaining charge through the unit’s suction valve. REMEMBER – the refrigerant must be weighed into the system and MUST be R.407C

30 Why must refrigerant R407C be charged as a liquid?
If charged as vapour only the high pressure refrigerant at the top of the cylinder will be drawn into the system