ADO-PO / TC meeting NJD/NSW Assembly Raphael Vuillermet.

Slides:



Advertisements
Similar presentations
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Advertisements

Crane & Hoist Training & Inspection Requirements Crane Safety.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
ATLAS End-Cap C Proposed Transport Box P Cooke 15 June 2005.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
1 The Support Structural System for Sicbar and EC Detector of SciBooNE FermiLab/PPD/MD May 08, 2006 Edward Chi.
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
ELENA Support system 6/11/2014 Antti Kolehmainen on behalf of WP Support system
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Technical Support Activities in PH-ADO-PO
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
ATLAS closing scenario  Where we are  What is still be done before closing (ADO-PO support)  Closing scenario / Procedure / Schedule Prepared by Michel.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
Project Office Activities R. Vuillermet 08/09/2015R. Vuillermet PH-ADO-PO1.
ICARUS Collaboration Meeting Dec A. Scaramelli.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Baby Mind C OIL DESIGN AND ASSEMBLY SCENARIOS Helder Silva Phillipe Benoit Alexey Dudarev Gabriela Rolando Herman ten Kate Etam Messomo Laurent Nicola.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
NEW SMALL WHEEL DESIGN DESCRIPTION OF THE DESIGN AND REASONS BEHIND THE CHOICES Pictures and sketches: Courtesy of Tatiana Klioutchnikova and Giancarlo.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
ADO-PO / TC meeting 1st December 2016
Baby-MIND Modules & Services
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
ADO-PO section meeting. ADO : Atlas Detector Operation
TC activities.
SX1 manipulation VERSION 1 Version
CreaZen® Decorative Railing System
Present status of the flux return yoke design
INSTALLATION SEQUENCE
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Technical Support Activities in EP-ADO-PO
nSW Alignment Installation
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
Far Detector Activities Late 2017 – Early 2018
Initial BIS installation
Installation plans from mid 2005
Cryomodule Assembly Plan
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Roof design Bunker Project CDR
Neutron guide Shielding Concept
Bunker Wall Design Wall ESS
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
Polarized 3He target installation
Presentation transcript:

ADO-PO / TC meeting NJD/NSW Assembly Raphael Vuillermet

TC responsibilities in NSW/NJD project TC is in charge of the following tasks in the NJD/NSW project : Envelop definition and integration of the detector into the ATLAS environment Definition of the assembly building (b191, b180) : layout and building preparation Design, procurement and assembly of the NJD/NSW: Design, procurement and fabrication of the assembly tooling: Tatiana, Alexandre, Marco (services) Julien, Didier In 2018 (to be define) Christian, Jamie, (…) Giancarlo, Joffrey, Marco, Raphael Julien, Marco, Jamie, Alexandre Louis, Christian, Gevorg, Armen, Jamie, Alain Giancarlo, Raphael Julien, Jamie 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

R. Vuillermet - EP/ADO-PO - ATLAS TC Resting frame nJD/nSW Lifting tool Cover structure The design, FDR and procurement of the NJD/NSW transport tooling (from b191 to UX15) The design, procurement and assembly of the movement and positioning system Definition, and installation of cooling plant (b191) Scheduling the assembly operations the NJD + Hub The NSW The Sector on the NSW structure Pavel, Raphael Mouvement system Connection to the calorimeter stopper to the calorimeter Fred, (…) Tomasz, Michel Piotr, Yuri, Claudio Anna (project level), Raphael (Mechanical Assembly) 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

2. definition of the building (b191) layout Preparation of a layout of the building during the assembly operation. This layout includes : JD Assembly area Sector assembly station Sector storage area JD/SW frame storage Positioning of the loading area for the transport Positioning of a pallet storage racks 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

B191 preparation is on going. The following tasks are completed : Evacuation of material on the ground floor and on the balcony Survey marking in the wall and the ground for positioning of support Preparation of concreate block for the assembly of the JD Storage of the JD/SW transport frame in a corner of the building The following tasks will be done during the next weeks Concrete wall drilling for the stabilisation of the NJD during assembly Positioning of the turn block to allow the rotation of the NJD segment Reception test of lifting equipment that are going to be used during the assembly Floor cleaning Preparation and storage of the JD/SW transport frame Concreate blocs positioned for the nJD assembly Balcony clean up 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

3. Design, procurement and assembly of the NJD/NSW 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

R. Vuillermet - EP/ADO-PO - ATLAS TC NJDs Reception of both JDs in the manufacturer premises was done early June. It has consisted of : An horizontal blank assembly A geometrical control of the assembly thanks to survey measurement Planarity of the NJD-C with 1.5mm Planarity of the NJD-A within 0.9mm Visual inspection of the welding especially on the feets Control of all Quality assurance documents Material certificates Welder qualification Welding process qualification Thermal treatment (stress release) 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

Services brackets – sect 9 Top bracket and flexible chain Bot bracket and flexible chain 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

Services bracket – sector 1 Section of the flexible chain top and bottom are different Top and bottom bracket are identical Design of the brackets and production drawings is finished Procurement of the brackets to be delivered by the end of 2017. Reuse existing flexible chains and flexible hoses for gas (sTGC and MM) inside chains. Design of LV patch panel on NJD in sector 13. 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

4. Design, procurement and fabrication of the assembly tooling: 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

Turn bloc with support and magnetic clamp for segment rotation Interface with the turn block 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

Parisian tooling Interface to manipulate the return flux rings Interfaces done Interface to manipulate the JD connecting plates 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

Wisconsin with SS spoke grabber Grabber done 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

UKZN tool UKZN alone UKZN with SS grabber UKZN with LS grabber UKZN with feet spoke grabber UKZN in production Grabber : design shall be finalised to produce them in fall 2017 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

Assembly station Movable suspension beam The assembly station allow the connection of the sTGCs wedge with the MM spacer frame Concept: The spacer frame is hanged in a vertical plane (horizontal axis) thanks to an horizontal beam The sTGCs are brought in front of the spacer frame thanks to a carrier The sTGC is positioned vertically and horizontally thanks to the carrier adjusting system The sTGC is attached to the MM spacer frame When both sTGC are connected the load could transfer between the carrier to the MM spacer frame Vertical pillars anchored in the floor sTGC carrier sTGC MM Spacer frame MM sTGC 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

R. Vuillermet - EP/ADO-PO - ATLAS TC sTGC carrier Required function : Support the weight of the sTGC chambers (about 300kg) Transport safely the chamber from b180 to b191 Allow the precise positioning of sTGC respect to the MM Spacer Frame for connection Made out with extruded profiles (available in b609) Will be fabricated and assembly internally 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

5. The design, FDR and procurement of the NJD/NSW transport tooling The design of the tooling is well advanced and ready for FDR and procurement The detail manipulation scenario has been studied for the following localisations and functions: In b191 – loading and transport preparation Trailer interface during the transport and climatic protection SX1 trailer unloading operation and lifting operation BZ organisation for storage and crossing to side A UX15 for load transfer on the rail of HF truck All the logistics associated with the transport Remaining tasks Prepare FDR, fall 2017 Prepare procurement drawings and technical specification for the fabrication Prepare specifications for the transport operation Prepare step by step procedure for an efficient transport and manipulation operations 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

Resting Frame (Transport) , Lifting Tool Steel structure 8,8 tons Total (incl. counterweights) 13 tons Steel structure 13 tons Total (incl. jacks) 17 tons 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

Climatic protection for the transport Anchoring points for fast removal before going in the SX1 building Specific metallic structure developed for the resting frame Cover recycle from the BW and SW transports 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

R. Vuillermet - EP/ADO-PO - ATLAS TC B191 – trailer loading 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

SX1 – step by step trailer unloading 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

UX15 – step by step installation scenario 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

Logistics associated with the use of the transport tools Assembly, transport, disassembly of the tooling Inventory of the necessary support blocs Required hand tooling Etc. 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

6. The design, procurement and assembly of the movement and positioning system Status : Preparation of the production drawings Preparation of the FDR documentation Integration of services on nJD for the movement system Bracket for HO air pad Mechanical blocking jacks 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

8 - Mechanical assembly schedule Simplified schedule based on the official NSW project schedule to get a quick overview of the next months activities for TC. Granularity of the schedule is the month, for more detailed information please refer to the official NSW project schedule 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC

R. Vuillermet - EP/ADO-PO - ATLAS TC Conclusion NJD/NSW is an important project for LS2, by the size and the number of persons involved, but it is crucial for the future performance of ATLAS. TC is involved with a large responsibility in the supporting structures (NJD and NSW) design, procurement and assembly operations. TC will be involved in the sector assembly operation on the NSW. (for 2018 and 2019) A large fraction of the TC is/is going/will to be involved for this project. The assembly of the NJD will start in August with the objective to have both NJDs assembled before the YETS. The construction phase will last until the completion of both NJD/NSW and then TC will be in charge of the transport up to UX15 (2019 and 2020) . 11/07/2017 R. Vuillermet - EP/ADO-PO - ATLAS TC