Create the new Agenda for next meeting ONE

Slides:



Advertisements
Similar presentations
CMPT 275 Software Engineering
Advertisements

Project Management Process. Managing the Information Systems Project Focus of project management To ensure that information system projects meet customer.
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
NAMES COUNCIL MEETINGS PROCESS AND PROCEDURAL RULES.
Project Management.
Project Management Module 3. Keep focused on the timeline Week Prepare for Kick-off Meeting Assign teams Team forming Review and execute.
01/06/09 Agenda Introduction: Self, class, course Class intro: major, minor, career goal, present job Writing skills Strengths and weaknesses in writing.
The Proposal. Project Proposals Genesis of Proposals: They can result for formal requests (e.g. Request For Proposal, RFP) They can be unsolicited (e.g.
CSE 322: Software Reliability Engineering Topics covered: Course outline and schedule Introduction, Motivation and Basic Concepts.
COMP4710 Senior Design Richard Chapman. Outline What is Senior Design? What is Senior Design? Course Structure Course Structure End of Cycle Binder End.
CFA Exam Preparation Study Group “Best Practices”.
Planning. SDLC Planning Analysis Design Implementation.
Presentation Timer Select a time to count down from the clock above 60 min 45 min 30 min 20 min 15 min 10 min 5 min or less.
Presentation Timer Select a time to count down from the clock above 60 min 45 min 30 min 20 min 15 min 10 min 5 min or less.
EE400D DOCUMENTATION INSTRUCTIONAL SERIES MEETING MINUTES.
Project Management Phases Class 6. Initiation & Planning – Agenda Overview of the project management phases Midterm paper details.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Project Management Week 2 Day 2.
L545 Systems Analysis & Design Week 4: September 23, 2008.
Spring 2008 First Projects. Project 1.Due date: 02/01/08 This assignment cannot been turned in before Wednesday 01/30 after class time All team members.
Gil Harden, AIG/A USDA-OIG John Needham, AIG/A SBA-OIG.
DMS Systems Design Review 3
WEEK 2 Introduction to Project Management. Agenda Wk 1 Review: ◦ Treasure Hunt Review Project Life Cycle Identify Stakeholders Phase 1: Initiating.
iSpeak Break Timer 60 min 45 min 30 min 20 min 15 min 10 min 5 min or less.
1 Introduction to Engineering Second Semester Overview Agenda Team Assignments and Information Exchange Course Overview.
Effective Meetings Quick Refresher. 10 Best Practices for Effective Meetings Draft an agenda & send out approximately 48 hours in advance Recap time-sensitive.
Week 1 c0209 Software Engineering Course Practice Project Course Overview Software Institute, Nanjing University, Spring 2007 c0209.
CEN 4010 First Lecture January 9, 2006 CEN 4010 Introduction to Software Engineering Spring 2006 Instructor: Masoud Sadjadi
Hosted by: Institute for Software Integrated Systems (ISIS) Vanderbilt University Software Reliability for FCS May 18-19, 2004 ARO Workshop.
VOLUNTEER MANAGEMENT ACTION PLAN PRESENTATION DATE The Leadership Development and Strategic HR Practice Area is presented by American Express. This Service.
A PROFESSIONAL WRITER’S GUIDE TO ESTABLISHING CLIENT RAPPORT Writing an of Inquiry.
1 Computing and Software Engineering Practice Course Overview Software Institute, Nanjing University, Spring
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Samples from Team Working Agreements Design Process – Mockups.
PRJ566 Project Planning and Management Teamwork 1.
TGm Power Management DG Discussion Mar. 10, 19:00-22: IEEE m-09/0015r1.
5 Tips for Meeting with Potential Clients. Plan and Prepare Do your research on the company Put yourself in the client’s shoes Create an agenda.
Reform Groups and Analyze Preliminary Designs. Schedule Week 6 Lab Small Group Presentations Form into three large teams Agree on problem statement and.
ITIL Project Change Management Workshop 7 February 2007
Team management What can you do to help your team work effectively?
T Project Review X-tremeIT I1 Iteration
February 28 Assignments HW #8, 9, and 10 assigned Implementation plan
CUCSA Workgroup Chair Orientation
HB410 ODE released model policy on July 24th
Desired Discussion/Outcome
Project Planning GCP 2008.
Implementation Strategy July 2002
Request for Proposal - Best Value
Three Minute Timer Two Minute Timer One Minute Timer
NACE Committee Workspace (NCW)Training Workspace Features
Project Communication
PCC Update 08/26/09 Implementation Phase 1
Request for Proposal - Best Value
Team member1 Team member2 Team member3 Team member4 17 September 2009
Personal Academic Coaching
Introduction to Engineering Project Management - 1
Terms of Reference – Project Design Authority
CST-Systems Analyst Program
CST-Systems Analyst Program
Study Group “Best Practices”
CS 577b Software Engineering II -- Introduction
Review about Team meetings
CSE 498, Collaborative Design
Roman Life.
* 07/16/96 *.
PHASE 03 DUE (Winter 2016) Instructor: Craig Duckett
Good morning. Please pick up the new vocabulary
2 Hours Minutes Seconds Insert Text Here.
CEN 5011 Advanced Software Engineering
Team meetings Purpose for the meeting - GOAL
(Winter 2017) Instructor: Craig Duckett Lecture 18: Tuesday, March 7th
SDLC (Software Development Life Cycle) Role Play
Presentation transcript:

Create the new Agenda for next meeting ONE SWE3313 Software Engineering Team Project Meeting Sample (Green - Agenda for M0) 0. Attendance (first one will be Chair, second one will be Scribe for this Meeting 0) – Did all bring their schedules? Decide on the Team Name Establish a possible meeting day/time for an hour meeting when needed that all can come Create the new Agenda for next meeting ONE Assign the new Member's Responsibility for meeting ONE

SWE3313 Software Engineering Team Project Meeting Sample (Scribe's Minutes for M0) Meeting 0 - DATE TIME0 LOCATION 0. Attendance with Team list Responsibility: schedule? John S- Chair X Tate R- Scribe X Adam T X Joyce R X Brian B X Time: ____ 1. Team Name = ______________________ 2. Meeting day/time for an hour meeting when needed that all can come. ________ Time: ___ 3. Agenda for meeting ONE 0. Attendance (0 min) 1. Each member shares their areas of expertise, strengths and weakness. (5 mins) 2. Members decided method to share work products. (5 mins) 3. Establish of Responsibilities & Agenda for meeting 2 (10 mins) 4. Member's Responsibility for meeting ONE a. each must bring areas of expertise, strengths and weakness b. each must bring what method should the team share work products (Common Team Repository) Final Time: _______ Scribe0 types minutes0, sends them to all members CC to bbernal1; and puts them in the D2L Project Team Discussion as a new thread.

SWE3313 Software Engineering Team Project Meeting Sample (Yellow= Agenda for M1) 0. Attendance Each member shares areas of expertise, strengths and weakness. (5 mins) Members outlines method to share work products. (5 mins) Clarification of Responsibilities & Agenda for meeting 2. (10 mins) Deliverables from Meeting 1:   1 →Team expertise 2 →Method for team work products 3 →Chair2, Scribe2(timer), agenda, and responsibility list for Meeting 2 Scribe1 types minutes1, sends them to all members CC to all instructors in VISTA ; and puts them in the VISTA Project Team Discussion as a new thread.

SWE 3313 Software Engineering Team Project Meeting Sample (Blue = Scribe's Minutes for M1 ) Agenda for Meeting 1 - DATE TIME LOCATION 0. Attendance (0 min) 1. Each member shares areas of expertise, strengths and weakness. (5 mins) 2. Members outlines method to share work products. (5 mins) 3. Clarification of Responsibilities & Agenda for meeting 2 (10 mins) 0 Attendance (0 min) 1 Formulation of the plan for the project. (10 mins) a. Which life cycle? __________________ b. Draft of Phases - Assign to 2 or more members c. write up of the system (World View) - Assign to 2 or more members 2 Each member brings 3 questions and ambiguities regarding the project which are composed into a questionnaire for the client.(20 mins) 3 Discussion and creation of the first draft of time line + BID for project. (20mins) 4 Creation of agenda for next meeting with assignment of chair and scribe (timer) (5 mins) Responsibility List: for the next meeting 2: All team members =bring 3 questions and ambiguities regarding the project and study the diff life cycles. Other responsibilities = list here