SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.

Slides:



Advertisements
Similar presentations
A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
Advertisements

DC/DC Converters Markus Friedl (HEPHY Vienna) B2GM, 14 March 2012.
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
Construction and Performance of a Double-Sided Silicon Detector Module using the Origami Concept C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
19 November 2009 Christian Irmler (HEPHY Vienna) APV25 and Origami Scheme 4 th Open Meeting of the Belle II Collaboration.
Electrical Quality Assurance Markus Friedl HEPHY Site Qualification, 6 August 2015.
27 January 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Mechanics and Cooling DEPFET Meeting Prag.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
APV25 for SuperBelle SVD M.Friedl HEPHY Vienna. 2Markus Friedl (HEPHY Vienna)11 Dec 2008 APV25 Developed for CMS by IC London and RAL (70k chips installed)
Noise and Capacitor M.Friedl, R.Thalmeier, H.Yin (HEPHY Vienna) 24 September 2015.
Origami Chip-on-Sensor Design: Progress and New Developments 19th September 2012 TWEPP 2012, C. Irmler (HEPHY Vienna) TWEPP 2012, Oxford University.
DAQ Scheme and Beam Test Results H. Asano, M. Friedl, H. Hyun, T. Higuchi, C. Irmler, Z. Natkaniec, W. Ostrowicz, M. Pernicka, T. Tsubuyama.
Data Acquisition System of SVD2.0 This series of slides explains how we take normal, calibration and system test data of the SVD 2.0 and monitor the environment.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
Kodali Kameswara Rao TIFR, Mumbai
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Construction and Status of the Origami Module Prototype C. Irmler, M. Friedl HEPHY Vienna.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
APVDAQ Status Markus Friedl 22 January M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do.
SVD DAQ Status Koji Hara (KEK) 2012/7/19 DAQ workshop1.
Monitoring hardware for SVD (VXD) L.Lanceri, L.Vitale /INFN Trieste VXD Workshop, 01/10/2014 Slow Controls discussion session 1 1.Radiation & beam abort.
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
The new SVD Power Supplies o General requirements o Power supplies structure o Tender process o Test system 2/10/2014SVD Power Supplies1 F.Forti, INFN.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Power Supply for DEPFET in SuperBelle Pablo Vazquez IGFAE-USC Henryk Palka INP-KRA.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
SVD Docks Markus Friedl (HEPHY Vienna) B2GM, 23 July 2012.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
L.Vitale INFN and Univ. Trieste
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
SVD FADC SVD-PXD Göttingen, 25 September 2012
SVD Electronics Constraints
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
SVD Introduction Wetzlar SVD-PXD Meeting, 4 February 2013
Electronics & Machine Shop
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Markus Friedl (HEPHY Vienna)
Status of the CDF II silicon tracking system
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
ProtoDUNE SP – Slow control temperature readout setup test
Cooling pipes and Space for Services
Status of n-XYTER read-out chain at GSI
BESIII EMC electronics
Comments to the SVD4 structure
BPAC, 17 October 2017 VXD GND/EMC Markus Friedl (HEPHY Vienna)
APV25, Clock and Trigger M.Friedl HEPHY Vienna.
C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna
Presentation transcript:

SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012

8 November 2012M.Friedl (HEPHY Vienna): SVD SC2 Introduction Slow Control Summary

SVD 8 November 2012M.Friedl (HEPHY Vienna): SVD SC3 APV25 chips Cooling pipe Origami ladder Sensor underneath flex circuit Pitch adapter bent around sensor edge End ring (support)

Belle II SVD Key Parameters  4 layers (L3…L6) of double-sided silicon strip detectors  Straight barrel part with one slanted forward sensor (L4…L6)  1.14 m 2 silicon  223,744 channels (twice as many as in Belle I SVD)  Cluster Signal/Noise = 14 (p-side), 24 (n-side)  Time resolution = 2 (n-side), 3 (p-side) ns RMS  Occupancy < 5%  30kHz maximum trigger rate with dead time <0.5%  CO 2 cooling  0.55% X 0 overall material budget per layer 8 November 2012M.Friedl (HEPHY Vienna): SVD SC4

Opened SVD 8 November 2012M.Friedl (HEPHY Vienna): SVD SC5  Shown:  Fully populated L3  One ladder for each L4…L6

8 November 2012M.Friedl (HEPHY Vienna): SVD SC6 Introduction Slow Control Summary

General Assumptions (open for discussion)  Run Control (initialize, start run, stop run, internal calibration, …)  Handled internally by SVD following global signals presumably issued through NSM  Data quality monitoring (checking pedestals, noise, hit rates etc. during run)  Handled by DAQ and/or SVD internal monitoring in parallel  “Classical” Slow Controls (voltages, currents, temperatures, … – typically done with LabView on a smaller scale)  Handled by EPICS 8 November 2012M.Friedl (HEPHY Vienna): SVD SC7

Slow Controls – Power  Kenwood Power Supplies (GPIB interface + PC)  96 LV + 18 HV channels each with  Set voltage, measured voltage, current limit, measured current  Need to turn on/off LV and HV, read and clear error  DOCK Box (controlled/measured through FADCs)  384 DC/DC converters need to be enabled/disabled  Monitoring each converter output voltage and power good  Measuring  bias currents of each sensor (384 channels)  Optional: measuring one temperature on each of the 48 FADCs 8 November 2012M.Friedl (HEPHY Vienna): SVD SC8

Slow Controls – Temperature  CO 2 cooling plants  Cooling plants are systems including their own sensors  Manifolds  Are the valves and sensors (including mass flow meters?) controlled/read out by CO 2 plants or do we install another PLC (or something else)?  Front-End – not really defined yet  Will need rad-hard temperature sensors (presumably Pt100[0] or thermocouples) for  Cooling lines  Environment 8 November 2012M.Friedl (HEPHY Vienna): SVD SC9

Monitoring – Front-End  Not defined yet, but can assume a O(10) for each sensor type  Presumably also interesting for PXD, thus we should make common effort (as already started with humidity)  Humidity  Problem: radiation hardness – maybe optical fiber?  Backup solution: sensors in exhaust pipes outside detector  Radiation  Instantaneous dose rate? – PIN diodes?  Total dose – RADFETs  Distance (Omegas) between PXD and SVD  Anything else? 8 November 2012M.Friedl (HEPHY Vienna): SVD SC10

8 November 2012M.Friedl (HEPHY Vienna): SVD SC11 Introduction Slow Control Summary

 EPICS for the Belle II slow control  I assume that Run Control and Data Quality Monitoring are not part of EPICS  Tasks for EPICS slow control  LV Power & bias switching and monitoring  Temperature monitoring (CO 2 plants, valves, front-end)  Humidity  Radiation  Distance (Omegas)  Anything else? 8 November 2012M.Friedl (HEPHY Vienna): SVD SC12