Chiho Wang ATLAS TRT Duke University Dubna, May 2005 1 Barrel integration status May 24, 2005.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
Seog Oh/ Duke University/September, 2003 TRT Workshop/ Peniscola, Spain Duke TRT Progress.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
Dogleg Thermal Tests : Configuration 7 6 AiN plate side Jan SM+LB 8 Dogleg side Heater (0.4W) flow 2 Temperature sensors located.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
ATLAS TRT Barrel Design Review, 1998 Barrel TRT Electronics Cooling Chiho Wang Duke University.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Jack Fowler Spain Workshop 2003 Faraday Shielding for Barrel TRT Jack Fowler Duke University Spain Workshop
CEDAR Support Structure Peter Sutcliffe 24 th January 2011.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
High Voltage Cards & 2000 Electronic/Thermal Model. CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000A.B.Lodge - RAL -1 ECAL End Cap 1 EE End Cap Engineering.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Chiho Wang ATLAS TRT Duke University IU, Oct Fuse Box Design & Mounting Chiho Wang Duke University.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Fuse Boxes Chiho Wang Duke University.
Chiho Wang ATLAS TRT Barrel Duke University U. Penn. Workshop, 2000 Module Thermal Analysis Chiho Wang Duke University.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box & Capacitor Status Chiho Wang Duke University.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
ATLAS ID Services Mock Up - Proposal Presented by Ian Wilmut at DESY, update from John Hill 4th May, 20101ATLAS Upgrade - RAL.
S A Griffiths CM42 June 2015 Electrical & Control.
Straw man layout for ATLAS ID for SLHC
Report Technical Director Storage-Ring-Installation Completed
ATLAS Internal ID Service Integration
Test beam straw prototype production status
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Progress with System Integration of the CBM Silicon Tracking Detector
University of Wisconsin
Integration and Services RE3/1 and RE4/1
Service channels between Tracker and PP1
Integration and Services RE3/1 and RE4/1
Service channels between Tracker and PP1
new straw end plug: D=10.6 mm straws support frame Levan option
End-cap Mechanics FDR Overview of the Project
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
VELO Thermal Control System
LHC Experimental Vacuum Systems Status October ‘07
Barrel TRT Module Cooling
Mechanics for front-end Electronics Of T2K-II TPCs – A Few Conceptual Ideas D. Calvet, Irfu, CEA Saclay, Gif sur Yvette Cedex, FRANCE.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Vertex Detector Mechanical R&D Design Questions and Issues
Services Layout – Update
Chamber Design and Integration RE3/1 and RE4/1
First of all we will remind some numbers:
Summary of Fuse Testing for Barrel Module Fuse Boxes
WELCOME.
Radiation Laboratory Meeting
Integration and IR Hall
ATL-IC-ES new version available - approval starts
Pierluigi Paolucci - I.N.F.N. Naples
SBS Front Tracker GEM short update on inefficient sectors
Updates on the Silicon Tracker 2S Module
Development of Reference Geometry DB of ATLAS Detector Reproduction of Inner Detector Kobakhidze Shota 25/04/2019.
Presentation transcript:

Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005

Chiho Wang ATLAS TRT Duke University Dubna, May Since last excitement:  All modules tested  All protection boards installed Last module installed Feb

Chiho Wang ATLAS TRT Duke University Dubna, May /03/05 Outer cylinder installed  RF shield taped on. u Between upper and lower halves cylinder: soldered u Between cylinder and space frame: to be soldered  C-fiber struts between front and back space frames installed  Protection panels modified and installed. Feb. 06, 2005

Chiho Wang ATLAS TRT Duke University Dubna, May /03/05 Heater pads installed  Almost! u 2 faulty pads not installed.

Chiho Wang ATLAS TRT Duke University Dubna, May Electronics  More than ½ boards installed. Hear more from Ben…

Chiho Wang ATLAS TRT Duke University Dubna, May Remaining tasks  Continue to install electronics and module cooling tubes.  Solder RF shield tape between outer cylinder and space frame.  Install manifolds by quadrants after electronics are installed u Cooling manifold (~ June) u Active gas manifold (~June) u Purging gas manifold (in hand)  Install thermal sensors u Module/cylinder sensors: installed, connectors to be molded. u Cooling plate sensors: in SR. u Purging gas sensors: in SR(?). Attachment method to be worked out. u All wire length known.  Sector test: last (or first!) screening on a final assembled detector: u Cooling, active gas, purging gas, HV, thermal sensors, electronics … (except fuse boxes) u Some DCS modifications in progress.  Install fuse boxes u Production and evaluation will go in parallel.  MTF migration: Commissioning, entering data.

Chiho Wang ATLAS TRT Duke University Dubna, May Summary  Manifold and electronics are in critical path.  Fuse box problem need to be solved.  We are almost there!