RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January 2011 169 Instrument Pre-Environmental Review Safety and Mission.

Slides:



Advertisements
Similar presentations
G O D D A R D S P A C E F L I G H T C E N T E R Code 300 Overview Codes 323: Mission Assurance Branch Name:Joe Hall Title: Associate Branch Head Office:Mission.
Advertisements

1 Government-Industry Data Exchange Program GIDEP as a Resource Presentation for the Code 300 Orientation June 15, 2012 Presented by: Michael J. Sampson,
Mission Success Starts With Safety GSFC Electrostatic Discharge (ESD) Control Program Are you plugged in? Jeannette Plante, Program Manager, Code 300.
MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
Quality Assurance/Quality Control Policy
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June 2010 RBSP EFW PREAMPS Rachel Hochman Space Sciences Laboratory.
Sept. 2008EFW INST+SOC PDR RBSP EFW GSE and SOC-GSE GSE and SOC-GSE (Science Operations Center In Support of INT) John Bonnell Will Rachelson Matt.
THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
25-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : SMA Jorg Fischer, MAM Mars Atmosphere and Volatile.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
FM4/FM5 PSRSCM - 1UCB, May 5 th, 2006 THEMIS FM4/FM5 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam University of.
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS Instrument PDRParts- 1 UCB, October 15-16, 2003 Parts Requirements Preliminary Design Review Jorg Fischer University of California - Berkeley.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR217 RBSP Electric Field and Waves Instrument (EFW) Instrument.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
TIM 1 UCB, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting Dr. John Wygant, UMN Dr. John Bonnell, UCB Peter Harvey, UCB.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Surviving and Thriving on NASA Audits…. One Organization’s Story of Turn Around and Success Emily Bird Broderick Safety and Quality Assurance Space Department.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
FIELDS Mission Assurance Manager University of California, Berkeley
Accelerator Readiness Review October 31, 2006
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
EFW DFB Systems Assurance
EFW DFB Systems Assurance
Solar Probe Plus FIELDS MEP i-PER Safety and Mission Assurance
FIELDS Mission Assurance Manager University of California, Berkeley
THEMIS MISSION PRE-SHIP REVIEW
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
THEMIS Mission Assurance
Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017
THEMIS INSTRUMENT SUITE
ISUAL Product Assurance
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
0.0 Instrument Suite Name Presenter’s name
BRIAN KLATT MISSION ASSURANCE MANAGER
DOE Review of the LCLS Project October 2006
Presentation transcript:

RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January Instrument Pre-Environmental Review Safety and Mission Assurance Jorg Fischer Space Sciences Laboratory University of California, Berkeley

RBSP/EFW I-PER 21 January 2011 Fischer 170 Safety, Alerts, and Calibration EFW Boom and Preamp Safety –No safety issues at this time –Safety per EFW Matrix, Revision A, Section 3 –No hazardous ground operations for EFW –UC Berkeley’s EH&S checked test areas –Portable, calibrated Oxygen sensors are available for N2 purge –Test Plan Walk-through Alerts and GIDEP Reports –No Alert impacts at this time –EFW receives Monthly Alerts from GSFC - JHU/APL –238 Alerts received, 238 Alerts closed, 2 Impact – 2 impact closed Calibration Control –All Tools need for testing are in calibration –Calibration Database (195 items tracked for EFW)

RBSP/EFW I-PER 21 January 2011 Fischer 171 ESD, Training, Configuration Control ESD Control –ESD Workbenches are clearly Identified –ESD Workbenches are independently certified (RMV Technology) –ESD Control plan per ANSI/ESD S20.20 in place (SSL_QA_0003) –Internal ESD checks per plan –All EFW personnel ESD trained and certified to ANSI/ESD S20.20 Training –All EFW personnel ESD trained and certified to ANSI/ESD S20.20 –All EFW technicians trained and certified to NASA Workmanship Standards Configuration Control –Configuration Control Matrix, typ. shows revision of Schematic, BOM, PWA Gerber, ACI, Unit Name and Serial Numbers, Next Assembly –Latest version of documents and procedures are on the EFW server

RBSP/EFW I-PER 21 January 2011 Fischer 172 Traceability, Non-conformance Control Traceability –All EEE parts approved –All Materials Approved –PMPCB process –POs and As built parts List on file –EFW Parts data base Nonconformance Control –Proven, in-place PFR Process (STEREO, RHESSI, THEMIS) –MRB part of this process –PFR – Rework/Repair forms –60 PFRs, All PFRs closed or in closing process. –PFRs on UCB server –PFRs are part of the SSL Lessons Learned Process Shipping Control –Shipping Plan in-place (JHU/APL, UCB/SSL 1/11/11)

RBSP/EFW I-PER 21 January 2011 Fischer 173 Summary - Experienced Personnel provide oversight and technical support across all elements of the EFW Project - Mission Assurance Requirements are well defined and comprehensive. - These are traditional requirements for SSL Missions and they are understood. - Systems with experienced personnel are in place and operating. The Mission Assurance team is ready to support RBSP EFW Environmental Tests and shipping of the instrument to JHU/APL.

RBSP/EFW I-PER 21 January 2011 Fischer 174 This page intentionally almost blank