Presentation is loading. Please wait.

Presentation is loading. Please wait.

0.0 Instrument Suite Name Presenter’s name

Similar presentations


Presentation on theme: "0.0 Instrument Suite Name Presenter’s name"— Presentation transcript:

1 0.0 Instrument Suite Name Presenter’s name
Presenter’s Solar Probe Plus A NASA Mission to Touch the Sun 17-19 May 2016

2 Outline Block Diagram Changes Since Mission CDR PDR/CDR RFA Status
Subsystem Status Test Flow GSE (Facilities and Equipment) Product Assurance Waivers & Deviations Anomalies & PFRs SOC status Summary Backup

3 Instrument/Suite Name Block Diagram
1 page

4 Instrument/Suite Name Changes since M-CDR
1 page Give each change (recommend table below) Give reason for change and provide impact, as appropriate, on resources of mass, power, size, telemetry, cost and schedule. Include any science requirement changes or add statement at bottom that there were no science requirement changes. Changes since M-CDR Reason for Change Impact on Resources

5 Instrument/Suite Name PDR/CDR RFA Status
Review # RFA’s # Open # Closed # Concurred Due Date I-PDR I-CDR For any open action items, detail outstanding issues and path to closure

6 Instrument/Suite Name Subsystem Status
~ 6 pages Drawing Release Status Hardware Build Status Include schedule for completion of flight fabrication Software Status EM Test Results FM Test Results Verification Status Include burn-down curve showing expected verification closure Include burn-down curve showing requirements to be verified at system level (if any) FPGA Resources

7 Instrument/Suite Name Test Flow
Flow chart(s) showing plans for the FM assembly, integration, functional and environmental testing (EMI, sniff, vibration, thermal balance, thermal vacuum, etc.), and calibration Major milestones in the I&T flow with dates

8 Instrument/Suite Name Ground Support Equipment
1-2 pages GSE (Facilities, Equipment, Software) Include status of GSE Examples: harnessing, handling/shipping fixtures, facilities, environmental test fixtures, ground software

9 Instrument/Suite Name Product Assurance
Open Issues Including closure plan Waivers & Deviations (include any that are known about and not yet submitted) Anomalies & PFRs Type Approved Pending Pending Specifics Withdrawn Waivers Deviations

10 Instrument/Suite Name SOC Status
1 page

11 Instrument/Suite Name Summary
1 page

12 Instrument/Suite Name Backup

13 Instrument/Suite Name Backup – Test Procedures
Title Status


Download ppt "0.0 Instrument Suite Name Presenter’s name"

Similar presentations


Ads by Google