THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.

Similar presentations


Presentation on theme: "THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley."— Presentation transcript:

1 THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley

2 THEMIS Mission PDR/CAR 2 UCB, November 12-14, 2003 Overview Instrument Integration and Test at UCB Responsibilities Requirements Facilities I&T Flow

3 THEMIS Mission PDR/CAR 3 UCB, November 12-14, 2003 Responsibilities Provide Clean Room Facility (Room 125) Access Control & Clean Room Training Develop MGSE –Instrument Harness Mockups & Test Platforms Fabricate Instrument Harnessing Support Instrument-Provided GSE –Mu-Metal Enclosures for FGM & SCM –N2 Purge Systems for ESA, SST –Sphere Sensor Boxes for EFI Integrate & Functional Test of EM, F1-F6 Provide EMC, MAG, Vibration & TV Testing Daily Logistic Planning & “Standup” meetings Deliver & Support to Swales for Spacecraft I&T

4 THEMIS Mission PDR/CAR 4 UCB, November 12-14, 2003 Requirements Vibration / TV : GEVS SE EMC/EMI : MIL-STD-461 Magnetics: Non-Magnetic Tooling Used for FGM/SCM Contamination: THEMIS Contamination Control Plan Metrology: Ongoing calibration program Tests:

5 THEMIS Mission PDR/CAR 5 UCB, November 12-14, 2003 Facilities Instrument Integration Lab Secure Key-Coded Lock Class 100K Clean room Air Quality Monitored Weekly by Assurance Positive Air Flow Feed Thru’s to Adjacent Lab Gowning Area Storage Shelving for Component Storage Separate Flight and non-Flight Storage Oxygen Sensor (when Nitrogen Purge used) Used for HESSI, CHIPSAT, Stereo Impact

6 THEMIS Mission PDR/CAR 6 UCB, November 12-14, 2003 Environmental Chambers Chamber Availability at SSL Numerous Tanks New Chamber for EFI Booms Cal Chamber Upgrade for SST Need 2 TQCM’s TV Plan Design 2 Component-Level TV Cycles Prior to Instrument-Level I&T 6 Instrument Level TV Cycles at Instrument-Level Chamber Usage During Relevant Performance Periods Facilities

7 THEMIS Mission PDR/CAR 7 UCB, November 12-14, 2003 Facilities Environmental Test Chamber Requirements Pre-Test Clean Pre-Test Bakeout TQCM Monitoring Cryo-Pump Final Bakeout GN2 Backfill Deployments in Vacuum SPB: Full Deploy w Takeup reel AXB/MAG: First Motion Hot&Cold

8 THEMIS Mission PDR/CAR 8 UCB, November 12-14, 2003 I&T Flow Instrument Engineering Model I&T

9 THEMIS Mission PDR/CAR 9 UCB, November 12-14, 2003 I&T Flow Instrument Flight Model I&T