Central American Certificate Course: HIV Monitoring and Evaluation with Emphasis on Health and HIV Economics BZ ES GT NI PA CR February 10th – 16th, 2014.

Slides:



Advertisements
Similar presentations
Strategic Planning Process: An Overview
Advertisements

Introduction to the Results Framework. What is a Results Framework? Graphic and narrative representation of a strategy for achieving a specific objective.
Welcome to Freedonia Bringing the Real World of Health Care Planning to Life through Scenario-based Learning and Assessment Lorraine Dardis, ICH, UCL 23.
Knowing if the RBF mechanism is working Incorporating Rigorous Impact Evaluation into your HRBF program Sebastian Martinez World Bank.
Local Control and Accountability Plan: Performance Based Budgeting California Association of School Business Officials.
Results-Based Management: Logical Framework Approach
Planning using Problem Analysis and The Theory of Change.
Project Cycle Management (PCM)
Results-Based Management: Logical Framework Approach
1 Designing a Monitoring and Evaluation System for a Rural Travel and Transport Project Michael Bamberger Gender and Development Group The World Bank RTTP.
Online tutoring. Tutor Instructor Facilitator Moderator Subject specialist – Undertaking a role to support and enable students to learn online effectively.
PEER SUPPORT SERVICES FOR OLDER ADULTS. Background Information Peer Services in PA – February 2007 OMHSAS received approval from CMS to include peer support.
Measuring Information Society WSIS, Tunis - 15 November 2005 Measuring the Impact of ICT on Development A few methodological and policy issues Measuring.
Results-Based Management: Logical Framework Approach
Chapter 17 Nursing Diagnosis
CASE STUDIES IN PROJECT MANAGEMENT
1 CASE STUDIES IN PROJECT MANAGEMENT Lecture 3 Project management methodologies.
This project is funded by the EUAnd implemented by a consortium led by MWH Logical Framework and Indicators.
Test Organization and Management
Lesson 5 – Logical Framework Approach (LFA)
1 October, 2005 Activities and Activity Director Guidance Training (F248) §483.15(f)(l), and (F249) §483.15(f)(2)
Chapter 7 ©2001 South-Western College Publishing Pamela S. Lewis Stephen H. Goodman Patricia M. Fandt Slides Prepared by Bruce R. Barringer University.
Developing Indicators
Project design & Planning The Logical Framework Approach An Over View Icelandic International Development Agency (ICEIDA) Iceland United Nations University.
KEYWORDS REFRESHMENT. Activities: in the context of the Logframe Matrix, these are the actions (tasks) that have to be taken to produce results Analysis.
Cross-cutting Issues And other things your project document must include.
Understanding Student Expectations & Effective Teaching Presented by: Dr. Laura Marler Associate Professor of Management College of Business Mississippi.
R URAL D EVELOPMENT P ROGRAMME – L OMBARDY R EGION, I TALY E X ANTE EVALUATION Davide Zanon 26th september, 2013.
INTRODUCTION TO PROJECT PLANNING AND APPRAISAL LOGICAL FRAME WORK PREPARED BY GEORGE BOTCHIE.
The LOGICAL FRAMEWORK Scoping the Essential Elements of a Project Dr. Suchat Katima Mekong Institute.
Mothers unwilling to go to clinics Low staff skills Inadequate number of clinics Shortage of drugs High infant mortality rates Commercial pressure for.
LOGICAL FRAMEWORK by Lorelyn T. Dumaug.
Promising Ideas and Issues to Consider in Reaching Reading and Literacy Goals Logistics of supervision, training, support to teachers Sakil Malik Director.
FGFOA STANDING COMMITTEES Established and Evaluated by the FGFOA Board of Directors to Utilize talent and resources of the FGFOA Membership.
Participatory Planning Project Cycle Management (PCM)
M&E TRAINING MODULES Different tools for different applications.
Logic Model, Monitoring, Tracking and Evaluation Evaluation (Section T4-2)
Logical Framework Approach 1. Approaches to Activity Design Logical Framework Approach (LFA) – Originally developed in the 1970s, this planning process.
Logical Framework Approach An Evaluation Toolbox Presentation
Development of Gender Sensitive M&E: Tools and Strategies.
Central American Certificate Course: HIV Monitoring and Evaluation with Emphasis on Health and HIV Economics BZ ES GT NI PA CR January 20th – 24th, 2014.
Central American Certificate Course: HIV Monitoring and Evaluation for HIV/AIDS Policy and Program Management BZ ES GT NI PA CR February 3 rd to 9 th.
Central American Certificate Course: HIV Monitoring and Evaluation for HIV/AIDS Policy and Program Management BZ ES GT NI PA CR February 3 rd to 9 th.
Central American Certificate Course: HIV Monitoring and Evaluation for HIV/AIDS Policy and Program Management BZ ES GT NI PA CR Economic Evaluation and.
true potential An Introduction to the First Line Manager Programme’s CMI Qualifications.
WORKSHOP ON PROJECT CYCLE MANAGEMENT (PCM) Bruxelles 22 – 24 May 2013 Workshop supported by TAIEX.
February 25, Today’s Agenda  Introductions  USDOE School Improvement Information  Timelines and Feedback on submitted plans  Implementing plans.
Monitoring and Evaluation for HIV/AIDS Policy and Program Management Central American Certificate Course: Monitoring and Evaluation for HIV/AIDS Policy.
Benefits Map Using this Template
Logical Framework Approach to PSIP formulation By Edward Joshua (Chief Economist, EP&D) Presentation 10 : 2015 PSIP Process Review Workshop 1.
Building an ENI CBC project
Implementation Plan I want to plan a project
Health and HIV Economics
Central American Certificate Course: HIV Monitoring and Evaluation for HIV/AIDS Policy and Program Management BZ Unit 2 – Post test CR ES GT NI PA January.
Project Cycle Management
Response to Intervention Webquest for Teachers
Day 2 The LogFrame.
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 3. Session 7. Managers’ and stakeholders’ information needs.
M&E TRAINING MODULES What is an IMEP?.
Project Implementation Plan
Surveillance. Public Health Approach Surveillance What is the Problem ? Problem Risk Factor Identification : What Is the Cause ? Intervention Evaluation.
PCE and Strategic planning
Logical Framework I want to design a project by planning out the logic
Chapter 7 Decision-Making Tools and Techniques Pamela S. Lewis
Session 9 Recap on LFM and IL.
Nicholas Martyn DG Regional Policy
Logframe Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu.
MAIN CHANGES TO LOGFRAME TEMPLATE – PRAG 2015 / PRAG 2016
Integrating Gender into Rural Development M&E in Projects and Programs
How is an M & E framework derived from the logframe?
Presentation transcript:

Central American Certificate Course: HIV Monitoring and Evaluation with Emphasis on Health and HIV Economics BZ ES GT NI PA CR February 10th – 16th, 2014 Improving HIV M&E System: SWOT Analysis and LogFrame

BZ ES GT NI PA CR Remember that the last day to send this test to your tutor is on February 20th. If you have any doubt, please ask your tutor

BZ ES GT NI PA CR Unit 4 – Strengthening M&E Systems: SWOT and LogFrame Mark the correct answer with an X Which part of the LogFrame provides information for risk management ( ) Assumptions column ( ) Vertical Logic ( ) Verifiable Indicators ( ) The sum of odd cells

BZ ES GT NI PA CR Match activities and outputs to prepare a LogFrame No.ActivityAnswerOutput 1Problem identification Means – to – ends analysis 2Problem AnalysisStrategy design 3Objectives AnalysisBest alternative analysis 4Alternatives Analysis Cause – effect analysis 5Project identification Selecting a Central Problem

BZ ES GT NI PA CR The logframe has four columns. Mark with an X the one which is not a logframe column Means of Verification Risks / Assumptions Responsible Organization Intervention / Strategy Objectively Verifiable Indicators

BZ ES GT NI PA CR Match components of SWOT Analysis with examples for each component, from the analysis of a M&E Unit. No.ComponentAnswerExample 1StrenghtNational and district level network of M&E 2WeaknessBudget cuts could affect M&E next year 3Opportunity25 Certified HIV M&E Specialists 4ThreatThere are no M&E manuals and guidelines

BZ ES GT NI PA CR Categorize the following statements as SWOT’s benefits [B] or pitfalls [P] [ ] Encourages participation of all group members. [ ] Subjectivity leads to different results. [ ] Foster situation and strategy analysis. [ ] Prefers simplicity to accuracy, especially if high uncertainty contexts.

Monitoring and Evaluation for HIV AIDS Policies and Programs Management BZ ES GT NI PA CR Central American Certificate Course: