Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.

Slides:



Advertisements
Similar presentations
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Advertisements

Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
Straw electronics Straw Readout Board (SRB). Full SRB - IO Handling 16 covers – Input 16*2 links 400(320eff) Mbits/s Control – TTC – LEMO – VME Output.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
Report of the NTPC Test Experiment in 2007Sep and Others Yohei Nakatsugawa.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
SPSC Questions to the 2014 NA62 Status Report 1 Beam: which is the beam structure expected in October? Which is the intensity you can reasonably expect?
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
LRT2004 Sudbury, December 2004Igor G. Irastorza, CEA Saclay NOSTOS: a spherical TPC to detect low energy neutrinos Igor G. Irastorza CEA/Saclay NOSTOS.
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
NA62 Trigger Algorithm Trigger and DAQ meeting, 8th September 2011 Cristiano Santoni Mauro Piccini (INFN – Sezione di Perugia) NA62 collaboration meeting,
Compressor status AWAKE Technical Board meeting 19 August 2015.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Anatoli Romaniouk TRT Introduction TRT in ATLAS p. 2-4TRT in ATLAS p. 2-4 TRT design p. 5-7TRT design p. 5-7 TRT operation principles p. 8-9TRT operation.
Status of NA62 straw electronics Webs Covers Services Readout.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Update on CHANTI F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi di Napoli «Federico.
First Results from the NA62 Straw Spectrometer E uropean P hysical S ociety 2015, Wien Vito Palladino - CERN On Behalf of NA62 Collaboration.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Noise and Cosmics in the DHCAL José Repond Argonne National Laboratory CALICE Collaboration Meeting University Hassan II Casablanca, Morocco September.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
Peter LICHARD CERN (for NA62) 1 NA62 Straw detector read-out system Introduction to NA62 NA62 layout Straw detector Requirements for straw detector electronics.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
The NA62 Spectrometer Acquisition System TWEPP 2015, Lisbon Peter Lichard and Vito Palladino - CERN On Behalf of NA62 Straw Working Group.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Straw readout status Status and plans in Prague compared with situation now Choke and error Conclusions and plans.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Plans for the 2015 Run Michal Koval, Peter Lichard and Vito Palladino TDAQ Working Group 25/3/2015.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
Straw (T)DAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
BRAN at IR2 and IR8: status, commissioning and operation Enrico Bravin AB-BI Joint LHC Machine-Experiments Workshop on Very Forward Detectors 25 January.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
The drift chamber with a new type of straws for operation in vacuum
S.Movchan Straw manufacturing and QC
Status of NA62 straw electronics and services
Status of NA62 straw readout
Vito Palladino Straw Working Group 23/3/2015
Status of straw production straw module assembling
SHiP straw tracker prototype tests
CMS muon detectors and muon system performance
Preparation of the CLAS12 First Experiment Status and Time-Line
Characterization of Wired-OR prototype board
Presentation transcript:

Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson

Content 8/29/13Plenary Liverpool, H. Danielsson

Assembly and testing Three out of four modules completed in terms of straw gluing and wiring All four modules (Ch1 and Ch3) completed by the end of the year (straws, wires and testing) 8/29/13Plenary Liverpool, H. Danielsson Module #6 on 26/8/2013

Example HV test HV test by monitoring the current (1nA resolution) at 2.2kV. If current too high we need to identify the wire. HV test by Threshold scan (see below). Typically we have ~10 wires /view to change. 8/29/13Plenary Liverpool, H. Danielsson New cover!

8/29/13Plenary Liverpool, H. Danielsson Gas Load From theory: From experiment: ComponentPressure increase rate Vacuum Tank1.27 x mBar l/s (27%) LAV Detectors2.2 x mBar l/s (47%) STRAW Tracker1.25 x mBar l/s (26%) Total4.72 x mBar l/s (100%) Total pressure increase (March ‘13 test) STRAW Tracker 53% (1E-11/1.88E-11) Outgassing 37% (7E-12/1.88E-11) Air Leak 10% (1.8E-12/1.88E-11) %s from Mass Sweep Leak test /03/2012 ‘NA62 Vacuum requirements specification’ EDMS:  !! Limit for an individual straw

Straw leak in the technical run Three straws were leaking and replaced. One straw had a leak of ~10 mbar x cm 3 /min. Two straws had a leak of ~100 mbar x cm 3 /min. The big leaks could be found with a leak detector, but not the small leak. It is possible that we did not see the leaks during the assembly The smallest leak was not visible in a simple bubble test (water) and not possible to detect with the leak detector….with Helium it was possible as can be seen  Future action: pressurize the chambers (1 bar) before installation 8/29/13Plenary Liverpool, H. Danielsson SEM images (inner surface) (outer surface)

Status of straw production and straw module assembling in Dubna S.Movchan, Yu.Potrebenikov 28 August 2013

Module removed from the assembly tooling (June 2013) Aug A set of materials and components for finish assembly CH2 M1 and for assembly CH2 M2 (X-Y) is received from CERN August 15, 2013 CH2 M1 in “dry” room ready for HV test

Straw gluing Aug layers have been glued

Conclusion and planes Straw manufacture: there are all necessary straws for module 2 of CH2 and for module 1 of CH4 straw manufacture is in progress for module 2 of CH4 Straw manufacture will be finished in October 2013 CH2 Module 1 (U-V): straw gluing and wiring – done final assembly – started tests (HV, gas leak) – September 2013 delivery to CERN – September 2013 CH2 Module 2 (X-Y): straw gluing – 2 layers glued + Sept wiring – October 2013 final assembly – November 2013 tests (HV, gas leak) – December 2013 delivery to CERN – January 2014 Aug instead Feb, 2014 (new Fredi schedule)CH2 installation – Feb-March 2014

CH4 M1 U-V: vacuum test – in progress straw gluing – Nov-Dec 2013 wiring - Jan-Feb 2014 final assembly – April 2014 tests (HV, gas leak) – May 2014 delivery to CERN – July 2014 CH4 M2 X-Y: frame gluing – Autumn 2013 vacuum test – Autumn 2013 straw gluing – Feb-March 2014 wiring - April 2014 final assembly – May 2014 tests (HV, gas leak) – June 2014 delivery to CERN – July 2014 Aug CH4 installation - Aug-Sept 2014 instead July-Aug (new Fredi schedule)

Giuseppe Ruggiero - Straw WG meeting 12 Straw Data during the Technical Run Giuseppe Ruggiero (CERN) Straw WG Meeting Liverpool, 28/08/ /08/2013

Giuseppe Ruggiero - Straw WG meeting 13 Straw – CHOD Timing 28/08/2013 Drift time structure in time with CHOD clearly visible (< 200 ns). Out-of-time structure within ns from the drift time not understood

Giuseppe Ruggiero - Straw WG meeting 14 First Straw hit Timing 28/08/2013 If >1 leading in the same straw within 200 ps the hit with the minimum time is considered. No more shoulder in the second half of the drift time

Giuseppe Ruggiero - Straw WG meeting 15 Plane correlations 28/08/2013 Pattern compatible with hits from one particle going straight Relative position of the hits belonging to different straws and within 200 ns

Straw L0 Trigger Studies Vito Palladino NA62 Collaboration Meeting - Liverpool

Tracking In order to track charged particles the detector is divided in corridors (group of 6 straws) two neighbor corridors have 2 common straws. Corridor shape has been defined in order to maximize the number of straws in one corridor. First two chambers are considered for tracking. No drift time is considered. One coordinate (XYUV) is measured doing the mean of the position of the hit straws.

Vertex Resolution Z Dependence MCT vertex (m) MCT vertex – Reco Vertex (m) GTK3 Straw0

Full SRB – IO (P. Lichard) Handling 16 covers Input 16*2 400(320eff) Mbits/s Control TTC LEMO VME Output to PC farm – 2*1Gb/s ethernet VME to SBC L0 trigger

SRB – data flow 16x2x320Mbit/ s ~10Gbit/s 2.5Gbit/s 2x Gbit etherne t VME to - Setup - Control, - On-line monitoring - Data

Trigger First mentioned in TD Possibility to use Straw detector for L0 if proved to be useful View is split to corridors 6 straws Corridors overlap on each side by 2 straws 2 or more trailing edges in a corridor in a defined time window qualify a track Can be already used as a coarse position ~13mm

Trigger Position can be improved using leading edges Leading edges from 6 straws put into the time pipeline corresponding to the full drift time in straw, step 25ns Trailing edge track signal starts pattern recognition Leading edges are run through look-up table and output position code Time-corresponding position codes from all views are combined To look- up table 6 straws leading edges

Conclusions and Plans Production is progressing in Dubna and at CERN Chamber 1, 2 and 3 will be completed by the end of the year (straw installation, wiring and testing). Chamber 4 will be completed in the beginning of 2014 However, we see that the schedule is tight. In particular for Chamber 4. We need to find a way to complete the assembly earlier. We will have meeting in Dubna in October to discuss this and the preparation for the installation in Leak in TR: We found 3 leaking straws and they have been replaced. The exact cause for these defects is not yet known. Front-end cover board and SRB: Cover should be available in October which will allow us to complete the modules and start testing (including taking some data with cosmics) Straw Readout Board: The design is well advanced and it will include the possibility for a L0 trigger. Prototype expected in December 8/29/13Plenary Liverpool, H. Danielsson

Spares 8/29/13Plenary Liverpool, H. Danielsson

Giuseppe Ruggiero - Straw WG meeting 25 Conclusions 28/08/2013 Method to handle triggerless data developed. Timing correlation between Straws and other detectors evident. View-planes correlation clearly visible. Structure of the straw drift time to be investigated in detail. Structure of the out-of-time event to be studied. Straw multiple hit structure to be further investagated.

Signal 8/29/13Plenary Liverpool, H. Danielsson

Time spectrum (From Tonino’s presentation) Garfield (first th. crossing) TR 8/29/13Plenary Liverpool, H. Danielsson

Trailing edge Will in principle give the time of the track but is difficult to implement in particular with fast electronics like the CARIOCA ATLAS TRT shows similar results. (They don’t use the trailing edge) 8/29/13Plenary Liverpool, H. Danielsson

Double pulses 8/29/13Plenary Liverpool, H. Danielsson