CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.

Slides:



Advertisements
Similar presentations
Highway 19 Mill & Overlay Project. Better Roads for Minnesota.
Advertisements

Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
Chelan County Stemilt Loop Full Depth Reclamation, Phase II: Stemilt Loop Road is a Rural Minor Collector located in the Wenatchee Heights. The road serves.
City of Cudahy Packard Avenue Streetscape Project INFORMATIONAL MEETING #2 Prepared for the City of Cudahy Common Council Packard Avenue Businesses & Property.
Sect. 12A-2 – Accessible SW Requirements ADA Clarifications: – When are curb ramps required? – What constitutes an alteration? – Does the scope of resurfacing.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
6 th Street Water Main And Street Reconstruction 2013.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Capital Improvement Projects 2014 A Snapshot of Current Construction Activity in the City of Irvine.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
1 Starting a Project – Looking for footpaths or pushed down ROW fences Plan for your pedestrians or they will be walking through your project on the edge.
Infrastructure Improvements Dependable infrastructure for CSUCI campus… Dave Chakraborty Director, Planning, Design & Construction.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Joint Urban Roadway Standards Workshop April 27, 2006.
Current Construction Projects Major Projects Pinellas County.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
In association with: 73 rd Street to Indian Bend Wash Bridge THOMAS ROAD STREETSCAPE 73 RD STREET TO INDIAN BEND WASH BRIDGE PROJECT NO. T0606 City of.
Presentation to the Chamber of Commerce Friday, April 23, 2010.
City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.
1 Leon County Board of County Commissioners MICCOSUKEE ROAD RESURFACIING INTERMITTENT ROAD CLOSURE From North MERIDIAN STREET To DOCTORS DRIVE.
PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015.
RECONSTRUCTION OF MONTGOMERY STREET Capital Improvements Budget Committee March 24, 2015 Hilary Holmes, Planning & Economic Development (PED)
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
To The For The. CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
Maintenance and Temporary Traffic Control
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
MARCH 18, :00 A.M. CITY COUNCIL CHAMBERS 2016 TRAFFIC SUMMIT HOSTED BY: CITY OF LANSING DEPARTMENT OF PUBLIC SERVICE.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
1 City Council Work Session September 24, 2012 State of Transportation in San Leandro.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.
Caltrans District 4 All information presented here is an estimate; It is preliminary and subject to change. SMALL BUSINESS OUTREACH FOR CONTRACTORS March.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
Agenda Updates to Driveway and Sidewalk specifications and permits
Scranton/Carter Road Reconstruction
June 5, 2017.
Molly Kline, Project Manager
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
Highway 169 Bridge Replacement & Pavement Resurfacing
SW Gage Blvd - Street Repair Project
Project Scope of Work Project Contacts
SE 12th Street Roadway Improvements February 8, 2005.
PROJ. 566(17) LOR PID MAJOR WIDENING
Commissioners Presentation
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Presentation transcript:

CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT

Concrete ImprovementsSewer Main Pipe ImprovementsStreet Pavement Rehabilitation Traffic Signal Modifications Signing and StripingConstruction Phasing/Scheduling Public Notification Process BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT

LOCATION MAP

ANTICIPATED CONSTRUCTION START DATE: September 2015 PROJECT DURATION: 100 Working Days (About 5 Months) barring any unforeseen conditions BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT

RESOURCEFUL FACTS - R&R (Remove & Replace) - ARHM (Asphalt Rubber Hot Mix) - AC (Asphalt Concrete) - VCP (Vitrified Clay Pipe) - ADA (Americans with Disabilities Act)

REASONS FOR PROJECT Need to increase pipe size of the Sewer Collector on San Fernando Road, Gardena Ave and Tyburn Street Age of Existing Sewer Pipe Repair Broken Sidewalk, Driveways and other PCC Improvements Repair Deteriorated Roadway Pavement Conditions ( Completes San Fernando Road and Brand Boulevard South of San Fernando Road)

CONCRETE IMPROVEMENTS Selective R&R of Uplifted and Damaged: -Sidewalks -Curb Ramps -Driveway Aprons -Curb/Gutter -Upgrade Curb Ramps with ADA Compliance BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT AfterBefore

SEWER MAIN PIPE IMPROVEMENTS A. New Sewer line/Pipe Upgrade/Replacement BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT

STREET PAVEMENT REHABILITATION PAVEMENT GRINDING (AKA Cold Mill/ Surface Plane) Remove Existing Deteriorated AC Pavement BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT Grinds will be Hauled Away Full Lane Grinding Can Drive on Immediately after Grinding

STREET PAVEMENT REHABILITATION RUBBERIZED (ARHM) PAVEMENT OVERLAY Improves the Ride and Structural Integrity of the Roadway BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT Place 1.5 ” ARHM Overlay Over Base Pavement Compact Newly Placed Pavement Eco-Friendly (Uses Tires) Begins NEW Service Life for Pavement Quieter and Smoother Ride Better Road Friction

TRAFFIC SIGNAL IMPROVEMENTS - Traffic Signal Modifications - Striping and Signing

TRAFFIC SIGNAL MODIFICATIONS A. Relocate Existing Signals at San Fernando Road and Brand Boulevard B. Upgrade Signal and Pedestrian Indications at San Fernando Road and Brand Boulevard BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT

SIGNING AND STRIPING Install New Signing and Striping to Comply with New CALTRANS Standards BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT New Pavement Markings, Lane Lines, Curb Markings, Retro-reflective Pavement Markings Installation of New Fluorescent and High Intensity Signing for Improved visibility Installation of Bike Lanes on Brand Boulevard between San Fernando Road and the City of Los Angeles to Connect to the Existing Bike Lanes in Los Angeles

ANTICIPATED CONSTRUCTION PHASING Phase 1a: Sewer Improvements Phase 1b: Traffic Signal Modifications Phase 1c: Concrete R&R Phase 1a, 1b and 1c Will Not Occur Simultaneously within Several Blocks of Each Work Phase 2: Pavement Grinding / Rubberized Pavement Overlay Phase 3: Utility Covers Adjustment to Finished Grade Phase 4: Striping and Pavement Markings, Sign Installation CONSTRUCTION WORK WILL BE COORDINATED TO MINIMIZE IMPACT TO LOCAL BUSINESSES & TRAFFIC BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT

Public Notification Process Community Meeting Director of Public Works’ Letter Contractor’s Notification Letter (1-2 weeks prior) Project Signs 3-Day Door Hanger (Grinding/ Paving) Driveway Closures Website Updates

For questions or general information, please contact: Saumil Mody Yvonne Guerra Project Manager Community Outreach (818) BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT Public Works’ Website: Before After

This PowerPoint presentation will be available for viewing at : s/public-works/projects/brand-blvd-and-adjacent- street-sewer-improvements. The project-dedicated webpage includes project updates and other information. s/public-works/projects/brand-blvd-and-adjacent- street-sewer-improvements