APVDAQ Status Markus Friedl 22 January 2015. M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do.

Slides:



Advertisements
Similar presentations
23 July 2012 Thomas Bergauer (HEPHY Vienna) Belle II SVD Construction Database 12 th B2GM Bad Aibling.
Advertisements

SVD Serial Numbers M.Friedl (HEPHY Vienna) 6 May 2014.
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Data Management PC Tools Review Software Review Full Review Lite –Freeware.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
Elektronics - Hephy Vienna M.PernickaM.FriedlC.IrmlerJ.PirkerS.SchmidSteininger C. Schwanda + Involved in BELLE and CMS ADC system with 36 inputs and.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
19 November 2009 Christian Irmler (HEPHY Vienna) APV25 and Origami Scheme 4 th Open Meeting of the Belle II Collaboration.
Electrical Quality Assurance Markus Friedl HEPHY Site Qualification, 6 August 2015.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
The trkNavigator plugin 22/10/ CERN - DataBase meeting Simone Paoletti INFN - Sez. Firenze.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
APV25 for SuperBelle SVD M.Friedl HEPHY Vienna. 2Markus Friedl (HEPHY Vienna)11 Dec 2008 APV25 Developed for CMS by IC London and RAL (70k chips installed)
Noise and Capacitor M.Friedl, R.Thalmeier, H.Yin (HEPHY Vienna) 24 September 2015.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
1 Stave 0 and QA plan UniGe-UniBe meeting, February 10 th 2012 D. Ferrère, A. La Rossa, Y Takubo.
8. February 2012 Thomas Bergauer (HEPHY Vienna) SVD Construction Database SVD-PXD meeting.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
CERN, 16/9/2003 S. Paoletti: trkNavigator 1 trkNavigator: A Java client for the Tracker DB 16/9/ CERN - mod. Prod meeting Simone Paoletti INFN -
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
Logistics 1 – To/Between Assembly Sites M.Friedl (HEPHY Vienna) 2 October 2014.
SVD DAQ Status Koji Hara (KEK) 2012/7/19 DAQ workshop1.
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
L5 Assembly 10 Sept C. Irmler (HEPHY Vienna) 8 th Belle II VXD Workshop OS5.905.
The new SVD Power Supplies o General requirements o Power supplies structure o Tender process o Test system 2/10/2014SVD Power Supplies1 F.Forti, INFN.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
SVD FADC SVD-PXD Göttingen, 25 September 2012
SVD Electronics Constraints
Electronics & Machine Shop
Markus Friedl (HEPHY Vienna)
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Misc. Topics Markus Friedl (HEPHY Vienna) 22 January 2015.
STAVE QA: LASER UPDATE William Heidorn, Jie Yu Iowa State University
UCSB Testing Status Anthony Affolder
UCSB Short-term Testing Plan
UCSB Testing Status Anthony Affolder
On behalf of the US TOB testing group
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
BPAC, 17 October 2017 VXD GND/EMC Markus Friedl (HEPHY Vienna)
Class B Ladder assembly
US Module Testing Progress Report
Electronics Sub-Group
US Module Testing Progress Report
Presentation transcript:

APVDAQ Status Markus Friedl 22 January 2015

M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do Summary

22 January 2015M.Friedl: APVDAQ Status3 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do Summary

Introduction  APVDAQ is a modular readout system for the APV25  Predecessor of the Belle II SVD readout system (“FADC”) 22 January 2015M.Friedl: APVDAQ Status4 6U VME module Repeater board APV25 hybrid  30m  2m

Electrical QA During Ladder Assembly  Identical setups built for all ladder assembly sites  To obtain comparable results  Results are stored in the database  Measurements:  Bare hybrids or Origamis  Ladders during construction  Final ladders (source/laser scan)  Only one sensor (2 hybrids/ Origamis) at a time can be measured 22 January 2015M.Friedl: APVDAQ Status5 Melbourne IPMU Pisa Vienna About one year ago before shipping; KEK already had an APVDAQ system

22 January 2015M.Friedl: APVDAQ Status6 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do Summary

What APVDAQ Can Do  Different run types (tests):  Pedestal/Noise (software run)  Internal Calibration Scan  IntCal vs. Vsep Scan  Source/Laser (hardware run)  Run-dependent  Online analysis  Export to CSV file for database 22 January 2015M.Friedl: APVDAQ Status7 Bare hybrid, Origami With sensor during production Final module/ ladder

Recently Added Features (1/3)  DAC add-on board  Allows to apply separation voltage in the range -5…+5V between bias and APV ground  Supported on p-side from software version 0.96  Hardware is being distributed  Installation instructions available in Twiki:  view/Detector/SVD/ApvDaqPage view/Detector/SVD/ApvDaqPage 22 January 2015M.Friedl: APVDAQ Status8

Recently Added Features (2/3)  Typical IntCal vs. Vsep plots for APV with pinholes  SFW993 p-side, APV#1, channel 30  Distinct Vsep dependence of pinhole channels for both polarities 22 January 2015M.Friedl: APVDAQ Status9 Mean RMS

Recently Added Features (3/3)  Correlation scatter plots and coefficients between neighbors  SFW993 p-side, APV#0, pulled channels (61,73,74) are obvious  High anti-correlation to neighbors 22 January 2015M.Friedl: APVDAQ Status10 Raw data CMC data

22 January 2015M.Friedl: APVDAQ Status11 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do Summary

What APVDAQ Cannot Yet Do  Additional features for next software release:  DAC support also for n-side  Correlation coefficient shown for scatter plot on display  What else?  Maybe more sophisticated analysis/export for source/laser run?  Please let me know any requests 22 January 2015M.Friedl: APVDAQ Status12

22 January 2015M.Friedl: APVDAQ Status13 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do Summary

What APVDAQ Cannot Do  Software does not  Interpret/judge measurement results  Grade the device under test  Human intelligence is required for those tasks  It’s not very complicated  student’s job  Instructions: ectricalTest ectricalTest 22 January 2015M.Friedl: APVDAQ Status14

22 January 2015M.Friedl: APVDAQ Status15 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do Summary

 APVDAQ is a powerful tool for electrical tests  Before (hybrids, Origamis)  During  After (full ladder test)  Ladder assembly  System well matured  Few more features to be added in software 22 January 2015M.Friedl: APVDAQ Status16

22 January 2015M.Friedl: APVDAQ Status17 Backup Slides

APVDAQ in Vienna, Pisa, IPMU, Melbourne  Systems installed at all assembly sites (plus KEK) 22 January 2015M.Friedl: APVDAQ Status18 ViennaIPMU

Measurements are Stored in the Database 22 January 2015M.Friedl: APVDAQ Status19 APVDAQ software Construction database

HEPHY Clean Room Installation 22 January 2015M.Friedl: APVDAQ Status20 Linear LV power supplies VME Crate 2 x Keithley 2410 HV power supplies (software controlled) PC Metal box with repeater boards Device under test (here: SFW993 wrapped in cloth) Barcode scanner

Closeup 22 January 2015M.Friedl: APVDAQ Status21 DAC board

Power Supplies etc.  HV: 2 x Keithley 2410 SMU  Operated by a dedicated software  LV: 2 x GW Instek GPS-3303 (linear, 3 channels each)  Works well also with bias (floating LV)  (Had noise troubles before with switching LV PS under bias)  Barcode Scanner: 2D Imager KD-1000-OP  Reads 1D and 2D codes  Label Printer: Brother QL-720NW  Produces rad-hard, self-adhesive labels 22 January 2015M.Friedl: APVDAQ Status22

APVDAQ Stability  Data of >640 APV25 chips tested on hybrid level  Example plots shown here:  Noise  IntCal Peak  More plots:  y.at/project/belle /belle2svd/apvda q/pa_dh.pdf y.at/project/belle /belle2svd/apvda q/pa_dh.pdf 22 January 2015M.Friedl: APVDAQ Status23