1 Source:Bob Plunkett TSG Coordination Ad Hoc Chair Copyright Statement The contributor grants a free, irrevocable license to 3GPP2 and its Organizational.

Slides:



Advertisements
Similar presentations
XHRPD Example Scenario for MSS Masa Shirota Qualcomm Inc. July 15, GPP2 Dalian Meeting Recommendation: FYI Notice QUALCOMM Incorporated grants a.
Advertisements

3GPP2 A r0 3GPP2 C xxxr0 TSG-A WG3 and TSG-C WG2 Title: HRPD Redirect on EPC Unavailable Source: Mike DolanAlcatel-Lucent Dave.
SOURCE:Chair, Editor CONTACT: Alex Gogic – TSG-S WG1 Mike Dolan – ABSTRACT: This contribution.
1 UATI-IP address mapping Peerapol Tinnakornsrisuphap David Ott Qualcomm.
1 May 14, 2007 Zhibi Wang, Simon Mizikovsky – Alcatel-Lucent Vidya Narayanan, Anand Palanigounder – QUALCOMM ABSTRACT: Access authentication architecture.
1 cdma2000® Data Service Transition to NULL Support Jun Wang Ravi Patwardhan June 5, 2003 Recommendation -
Mobile Equipment Identifiers for cdma 2000 Source: Scott Migaldi Motorola (847) Copyright Statement The contributor grants.
SCFAH Title: Draft Baseline Ad-Hoc Recommendation to SC on 3GPP2 Future Source: J. Brownley, Ad-Hoc Chair Abstract: This is a proposed draft.
SCFAH r1 Title: Working Draft “Ad-Hoc Recommendation to SC on 3GPP2 Future” Source: 3GPP2 Future Ad Hoc Abstract: This is the draft baseline.
Doc.: IEEE /1129r1 Submission July 2006 Harry Worstell, AT&TSlide 1 Appeal Tutorial Notice: This document has been prepared to assist IEEE
Doc.: IEEE /0930r0 Submission July 2006 Nancy Cam-Winget, Cisco Slide 1 Editor Updates since Jacksonville Notice: This document has been prepared.
The contributing companies grant a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text or other copyrightable.
ITU-R Liaison Group Report - Session #76 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0061 Date.
Proposed 1x Device Binding Solution Based on SX & SX GPP2 TSG-SX WG4 SX Source(s): Qualcomm Incorporated.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: GPP Requirements ad hoc Report Date Submitted: September,
ITU-R Liaison Group Report - Session #63.5 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0111r1.
May 12, 2008 Alcatel Lucent, Cisco, Motorola, Nortel, Verizon ABSTRACT: Proposed is additional key hierarchy and derivation for EPS access over eHRPD.
Rev.01 UIM, ESN and Equipment Identifiers Source: Bob Plunkett Chair, UIM AdHoc, TSG-S 3GPP2 Fujitsu Network Communications (972)
Donghee Kim Samsung Electronics ABSTRACT: This contribution shows the summary of changes in evaluation methodology text.
1 Authentication and User Profile April 24, 2007 Jun Wang QUALCOMM Inc. Notice Contributors grant a free, irrevocable license to 3GPP2 and its Organization.
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
TSG-S Project Coordination Recommendations Nick Yamasaki TSG-S Chair ABSTRACT: This document presents TSG-S recommendations for improved coordination of.
1 | L2-Tunnel based – Inter-tech. HO | October 29, 2007 Title: An L2-Tunnel based method for UMB-HRPD Inter-Technology handoff Source: Alcatel-Lucent,
Session # Maintenance Task Group Closing Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE maint-09/0009.
C XTREME Call Origination with Service Negotiation page: 1 Copyright Statement The contributor grants a free, irrevocable license to 3GPP2.
SCFAH Title: Draft Baseline Ad-Hoc Recommendation to SC on 3GPP2 Future ver2 Source: J. Brownley, Ad-Hoc Chair Abstract: This is a proposed.
Jun Wang Anand Palanigounder Peerapol Tinnakornsrisuphap
Synchronization Drafting Group Schedule Document Number: IEEE C802.16m-09/0379 Date Submitted: Source: Paul Cheng
Doc.: IEEE /1623r0 Submission November 2006 Jim Petranovich, Conexant Systems, Inc.Slide 1 PHY Ad Hoc Nov 1 Agenda and Minutes Notice: This document.
Comment to Limited Idle Mode Nortel Networksgrants a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text or other copyrightable.
DC RG Report Document Number: IEEE C802.16n-11/0088 Date Submitted: Source: Ming-Tuo Zhou, Sungcheol Chang DC RG.
ITU-R Liaison Group Report - Session #74 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0037 Date.
1 MAPSUP in eHRPD: Data forwarding Tunnel Sources: ZTE Contact: Bi YiFeng Rajesh Bhalla
X xx CT+ZTE PCC for cdma2000 MS Init Call Flows 1 1 Title: PCC for cdma2000 – MS-Init Call Flow Example Sources: CTC, ZTE Contact: CHINA TELECOM.
SCFAH r2 Title: “Ad-Hoc Recommendation to SC on 3GPP2 Future” – Working Draft Source: 3GPP2 Future Ad Hoc Abstract: This is the draft baseline.
1 Title: Performance of Default Parameters for 1xEV-DO RTCMAC Source: Christopher Lott, QUALCOMM Incorporated , Date: Februrary.
C Title: Next Steps for Femtocells Date: 03 December 2007 Source: Airvana, Alcatel-Lucent, Nortel Abstract:The contribution addresses.
Idle-State Data Buffering and Paging Framework June 04, 2007 Source companies grant a free, irrevocable license to 3GPP2 and its Organizational Partners.
1 Notice (c) ZTE CORPORATION. ZTE Corporation, grants a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text or other.
0 软交换应用的探讨 赵慧玲 2004 年 05 月 Dynamically Coverage Management By Caiqin Zhu(Catherine Zhu) China Telecom Apr © GPP2 China Telecom.
Relay/EMBS Ad-Hoc Group Report Document Number: IEEE C802.16m-09/2678r1 Date Submitted: Source: Kanchei(Ken) Loa Relay/LBS/EMBS.
1 Subject:Draft Responses to BBF Comments re. cdma2000 MO Preview Date: 25 January 2010 Source: Doug Knisely TSG-X FMOAHG Co-chair, BBF Liaison Contact:
Adding LTE-1x CSFB IOS specification in 3GPP2 Sources: China Telecom, Contact: Li Wenyi ABSTRACT: This contribution is to analyze the.
1 OMP for Dual Rx AT in LTE tunneled mode Contributors grants a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text.
1July 12th, 2002 S00VISION Update of Vision Issues in ITU-R WP 8F Christine Di Lapi Motorola Inc. Global Government Relations PH:
C August 19, 2003 Page 1 SMS Push Teleservice Nobuyuki Uchida QUALCOMM Incorporated Notice ©2003 QUALCOMM Incorporated. All rights reserved.QUALCOMM.
1 MSI (Multiple Service Instances) Ravindra Patwardhan QUALCOMM Incorporated Review and approve for D Notice QUALCOMM.
3GPP2 A r0 3GPP2 C xxxr0 TSG-A WG3 and TSG-C WG2 Title: M2M Congestion Control in the RAN Source: Mike Dolan Dave Rossetti Satish.
1 Contributor: Bob Plunkett QuickSilver Technologies Copyright Statement The contributor grants a free, irrevocable license to 3GPP2 and its Organizational.
Clarifications on Work Split among TSG-X/A for 3GPP2 Network Evolution March 26, 2007 Airvana/Alcatel-Lucent/CTC/Fujitsu/ Hitachi/KDDI/NEC/Qualcomm/ZTE.
1 Source: Bob Plunkett Fujitsu Network Communications (972) Copyright Statement The contributor grants a free, irrevocable.
Source: Qualcomm Incorporated Contact: Jun Wang, George Cherian March 1, 2010 Page 1 3GPP2 Femtocell Phase II Femto Access Control Enhancement Notice ©
1 30 November GPP2 SC Subject:Recommendations for 3GPP2-BBF Working Relationship Date: 30 November 2009 Source: Doug Knisely TSG-X FMOAHG.
Coexistence Motions for LB84 Comment Resolution
[ Policies and Procedure Summary]
Title: LE TG Report for the opening plenary – Session #58
Title: LE TG report for the opening plenary – Session #66
Session # Maintenance Task Group Opening and Agenda
Session # Maintenance Task Group Closing Plenary Report
Liaison Report Date: Author: July 2006 Month Year
Liaison Report Date: Author: Sept 2006 Month Year
Sponsor Ballot Comment Resolution
Appeal Tutorial Date: Authors: July 2006 Month Year
Overview of WG Letter Ballot Process
[ Policies and Procedure Summary]
3GPP2 Liaison Report Date: Authors: May 2006 May 2006
Beamforming and Link Adaptation Motions
PHY Motions for LB84 Comment Resolution
TGu Draft Revision Procedure
Selection Procedure Recommendation
Presentation transcript:

1 Source:Bob Plunkett TSG Coordination Ad Hoc Chair Copyright Statement The contributor grants a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text or other copyrightable material contained in the contribution and any modifications thereof in the creation of 3GPP2 publications; to copyright and sell in Organizational Partner's name any Organizational Partner's standards publication even though it may include portions of the contribution; and at the Organizational Partner's sole discretion to permit others to reproduce in whole or in part such contributions or the resulting Organizational Partner's standards publication. The contributor must also be willing to grant licenses under such contributor copyrights to third parties on reasonable, non-discriminatory terms and conditions, as appropriate. Notice Permission is granted to 3GPP2 participants to copy any portion of this contribution for the legitimate purpose of the 3GPP2. Copying this contribution for monetary gain or other non-3GPP2 purpose is prohibited. 3GPP2 Cross TSG Coordination

2 TSG-S Participation zMandatory participation in TSG-S by Other TSG Chairs. yChair or vice-chair must be present during Plenary and PMT sessions when TSG-S is collocated with SC. yChair, vice-chair or empowered liaison must be present during TSG-S meetings which are not collocated with SC. yTSGs must report their activities to TSG-S in person including status on TSG-S liaison items.

3 Workplan Enforcement Procedures zThe TSG leadership and specifically the TSG chair is responsible for insuring the TSG develops features in accordance with the workplan. zThe TSG chair (or designate) shall report on compliance to the workplan to both TSG-S and the SC. zNo TSG may publish any document that is not in conformance (dates excepted) with the workplan.

4 Stage Development Procedures zAll new features that cross TSG boundaries must include development of formal Stage 1, Stage 2 and Stage 3 documents. zStage 1s shall be approved that describe how a feature will work relative to each interface prior to formally scheduling a feature for a specific release. zA stage 1 document shall be considered approved one meeting cycle (all TSGs have met once) after original TSG-S approval, in the absence of comment from other TSGs. yStage 1s shall be circulated for other TSG review once the document is baselined.

5 Stage Development Procedures zAll 'stage' documents must be approved at the TSG level. zNo subsequent stage may be approved by a TSG without approval of the preceding stage at least one meeting cycle before. ySimultaneous approval is permitted provided there is unanimous agreement of the approving TSG and TSG-S. zTSG-S shall maintain a detailed schedule identifying each of the document stages.

6 Program Management Procedures zTSGs may work on any work item that does not impact other TSGs. yWork Item documentation must be sent to TSG-S for review and tracking. zAll new work items shall be reviewed by TSG-S to: ygather the impacts to other TSGs; ydetermine if Stage 1 requirements are needed; yset the schedule for stage 1 completion; yevaluate the market need for the work item; yconfirm that there is support for development from Individual Members in all of the impacted TSGs; yprioritize a work item within the schedule. zTSGs, at their discretion, may work on new work items pending adoption (or rejection) by the SC.

7 New Work Items zWork items may be proposed by an Individual Member, a TSG, an OP or a MRP. zTSG-S should complete its review of a new work item within two meeting cycles after receipt from the originating party. zIf TSG-S agrees with a work item, it shall be added to the 3GPP2 Work Program and a completion date for the stage 1 shall be identified at that time. yThe new work item shall forwarded to the SC for adoption. zIf TSG-S does not forward a work item to the SC, the supporting TSG or Individual Members may appeal to the SC. yThe appeal may be handled by an extraordinary meeting of the SC or at the next scheduled meeting of the SC, at the discretion of the SC chair.

8 New Work Item Requirements zEach proposed new Work Item shall be supported by at least three Individual Members. yThe supporting Individual Members are expected to contribute to the new work. zThere must be support from at least one Individual Member for each of the TSGs affected. zWork Items will not be scheduled for a release until after the stage 1 is complete and members have signed up to support Stage 2 and 3 work in each TSG as appropriate.

9 Work Item adoption by SC zA new Work Item shall remain flagged as "new" until one full meeting cycle of all the TSGs following the meeting at which TSG-S added it to the workplan. zTSG-S shall notify the TSGs of the new work item by sending it to the ‘all participants’ reflector. zA new Work Item shall be adopted by the SC unless a substantial objection is received from an Individual Member or Partner during this period. zIf there is an objection, it is the responsibility of any objecting Individual Member or Partner to discuss their objections with the sponsoring TSG Chair and the TSG-S Chair. zIf it is not possible to resolve the objection, it is the responsibility of the Individual Member or Partner to raise the issue with the SC.