Presentation is loading. Please wait.

Presentation is loading. Please wait.

ITU-R Liaison Group Report - Session #74 Opening Plenary IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number: IEEE L802.16-11/0037 Date.

Similar presentations


Presentation on theme: "ITU-R Liaison Group Report - Session #74 Opening Plenary IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number: IEEE L802.16-11/0037 Date."— Presentation transcript:

1 ITU-R Liaison Group Report - Session #74 Opening Plenary IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number: IEEE L802.16-11/0037 Date Submitted: 2011-07-19 Source: Takashi ShonoVoice:+81 3 6268 4665 Intel CorporationE-mail:takashi.shono@intel.com Venue: IEEE 802.16 Session #74, WG Opening Plenary Base Contribution: None. Purpose: ITU-R Liaison Group presentation to Opening Plenary of the WG, containing plan for the week Notice: This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.16. Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: and.http://standards.ieee.org/guides/bylaws/sect6-7oman/se. Further information is located at <htFurther information is located at and.ateriml> and <

2 ITU-R Liaison Group Report - Session #74 Opening Plenary Takashi Shono Chair, 802.16 ITU-R Liaison Group IEEE 802.16 WG Session #74 San Francisco, USA, 18-21 July 2011

3 Relevant Documents from Previous Sessions IEEE L802.16-11/0026 IEEE 802.16 ITU-R Liaison Group Workplan IEEE L802.16-11/0029r1 ITU-R Liaison Group Report to Closing Plenary of Session #73

4 Input Documents for Session #74 Liaisons On M2M IEEE L802.16-11/0039 (From ITU-R WP 5A) Liaison statement to external organizations on "Wide-area sensor and/or actuator network (WASN) systems“ (2011-07-15) On IMT-Advanced IEEE L802.16-11/0035 (From ARIB) Liaison response concerning the second WATO meeting (2010-07-08) IEEE L802.16-11/00xx1 (From ITU-R WP 5D) [5D/TEMP/519] (Copied for information) Draft Liaison statement to the 3GPP organizational partners on the completion of Rec. ITU-R M.[IMT.RSPEC] (2011-07-14) On IMT IEEE L802.16-11/00xx2 (From ITU-R WP 5D) [5D/TEMP/520] Draft liaison statement to external organizations - Revision of Recommendation ITU-R M.1224 (2011-07-14)

5 Proposed Objectives for Session #74 Per Workplan Review the outcome of WP 5D #11 Review the outcome of WP 5A #7 (on M2M etc.) Finalize Certification C Prepare Meeting X+1 contribution for M.1457 update (incl. IMT-2000 roadmap update for OFDMA TDD WMAN) – To be reviewed by 802.18, followed by approval from EC Beyond Workplan Prepare WASN contribution on M2M – To be reviewed by 802.18, followed by approval from EC Review input liaison statements and prepare responses as appropriate Update ITU-R LG workplan as appropriate

6 1) Introduction, approval of the agenda 2) Review and follow workplan of L802.16-11/0026 3) Work Items: 3-1)Review outcome of WP 5D #11 3-2)Review outcome of WP 5A #7 3-3)Finalize Certification C 3-4)Prepare Meeting X+1 contribution for M.1457 update (incl. IMT-2000 roadmap update for OFDMA TDD WMAN) – To be reviewed by 802.18, followed by approval from EC 3-5)Prepare WASN contribution on M2M – To be reviewed by 802.18, followed by approval from EC 4) Review liaisons, and prepare responses and any other output documents to external organizations as necessary 5) Update workplan 6) Approve all outgoing documents 7) Other business Proposed Agenda for the Week

7 Proposed Schedule for the Week (Room: TBD) MondayTuesdayWednesdayThursday AM 08:30 to 12:00 (WATO - 9:00 to 11:30) 3) Work Items: WI3-4 WI3-5 (subject to progress in M2M TG) AM1: Join 802.18 to get approvals on WI3-4 and WI3-5 Second WATO meeting (Agenda: L802.16- 11/0026) AM2: 6) Other business PM 13:30 to 18:00 (Mon – 16:00 to 18:00) 3) Work Items: WI3-1 WI3-2 WI3-3 WI3-4 3) Work Items: WI3-5 4) Update workplan 5) Approve all outgoing documents 1) Introduction, approval of the agenda 2) Review and follow workplan of L802.16- 11/0026

8 Motion To authorize the ITU-R Liaison Group to draft documents regarding contributions as needed, tentatively approve them on behalf of the WG (subject to confirmation at the 802.16 Closing Plenary), submit them for 802.18 TAG review, and represent the WG with the 802.18 TAG. For: Against: Abstain:


Download ppt "ITU-R Liaison Group Report - Session #74 Opening Plenary IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number: IEEE L802.16-11/0037 Date."

Similar presentations


Ads by Google