GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.

Slides:



Advertisements
Similar presentations
André Augustinus 16 June 2003 DCS Workshop Safety.
Advertisements

GlueX Collaboration Meeting June 3-5, GeV Trigger Electronics R. Chris Cuevas 1.Hardware Status  Production Updates 2.DAq and Trigger Testing 
GlueX Collaboration Meeting October 2-4, 2014 Trigger System Update R. Chris Cuevas Trigger Hardware/Firmware Status  Hardware Status  Performance Test.
Integrated Tests of a High Speed VXS Switch Card and 250 MSPS Flash ADC Hai Dong, Chris Cuevas, Doug Curry, Ed Jastrzembski, Fernando Barbosa, Jeff Wilson,
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
GlueX Collaboration Meeting May 12-14, GeV Trigger Electronics R. Chris Cuevas Trigger Hardware/Firmware Status  Global Trigger  Installation.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
GlueX CDC Update and Electronics Outlook Michael McCracken Carnegie Mellon University Advisor: Curtis Meyer Medium Energy Physics GlueX Electronics Meeting6-7.
X.Dong, USTC/LBNL Feb. 20th, 04, STAR Collaboration Meeting 1 TOF Software Progress Xin Dong, for TOF Group  TOF detectors in Run IV  Online software.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.
GlueX CDC Update and Electronics Outlook GlueX/HallD Collaboration Meeting Jefferson Lab April 2006 Michael McCracken Carnegie Mellon University.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
GlueX Collaboration Oct '06 C. Cuevas 1 Topics: Projects and Progress 250Msps Flash ADC Energy Sum Module The Bigger Picture DAQ/Electronics Work Plans.
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
Hall A 12 GeV DVCS Status report December 16th 2013 Hall A collaboration meeting Alexandre Camsonne.
 Brief status update of DAQ/Trigger production hardware  Firmware development for HPS application  CLAS12 CTP ‘upgrade’ notes  Summary Status of the.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
GlueX Collaboration Meeting February , GeV Trigger Electronics R. Chris Cuevas Hardware Status ( A top down view,, )  Global Trigger Processing.
Online Update Elliott Wolin JLab 4-Oct Outline Online Data Challenges Networking DAQ JInventory System Farm Manager Counting House, Computers, Databases.
IMPLEMENTATION OF SOFTWARE INPUT OUTPUT CONTROLLERS FOR THE STAR EXPERIMENT J. M. Burns, M. Cherney*, J. Fujita* Creighton University, Department of Physics,
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
Data Acquisition for the 12 GeV Upgrade CODA 3. The good news…  There is a group dedicated to development and support of data acquisition at Jefferson.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
06/07/041 F1TDC Status Update Hall D Collaboration Meeting Indiana University – Bloomington, IN May 20-22, 2004 Fernando J. Barbosa
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Comments from Physics Division Rolf Ent Associate Director for Experimental Nuclear Physics SOLID collaboration meeting, February 03, 2012 Thomas Jefferson.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
Hall D Electronics Review (July 23-24) Elton Smith Hall D Collaboration Meeting August 4-6.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
GlueX electronics Collaboration Meeting December, 2003 Paul Smith.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
Hall D Online Meeting 9 August 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division Mission Who’s Who.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
May 14, 2003The Detector Safety System for LHC Experiments1 Agenda 1) Minutes of last meeting 2) DSS Back End software progress by Giulio Morpurgo 3) DSS.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
ONCS Subsystem Status Chris Witzig (BNL), Stephen Pate (NMSU) DC Meeting PHENIX Collaboration Week 22-June-1998 Chain Test Software Subsystem Support Tests.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
R. Kluit Nikhef Amsterdam ET Nikhef Electronics Technology TGL Ruud Kluit 118-Apr-16.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
ELENA installation progress F. Butin / ELENA collaboration.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
CLAS12 DAQ & Trigger Status
Mini-drawers, FE-ASIC , Integrator
EMU Slice Test Run Plan a working document.
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Fernando J. Barbosa F1TDC Status Update Hall D Collaboration Meeting Indiana University – Bloomington, IN May 20-22, 2004 Fernando J.
Jason Gilmore Vadim Khotilovich Alexei Safonov Indara Suarez
HallD Collaboration Meeting Jefferson Lab December 11-13, 2003
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop Jefferson Lab 13 May 2005 R. Chris Cuevas Jefferson Lab Physics Division Group Leader -- Fast Electronics

GlueX Collaboration May05 C. Cuevas 2 Infrastructure Update Infrastructure topic introduced at the December 2004 Electronics Workshop ACCURATE DOCUMENTATION IS VITAL Electronics must be treated as an overall Hall ‘system’ Hall D electrical and electronics infrastructure will provide the requirements and documentation for the following: AC Power source & grounding requirements/interface. Equipment rack layout details Fire protection equipment Input/Output cabling diagrams for ALL Detector systems Equipment Cooling Systems Standard instrumentation and HV ‘Crates’ Network gear and cabling

GlueX Collaboration May05 C. Cuevas 3 Infrastructure Infrastructure documentation and ‘rules’ must also be established before installation for: Cabling/interface between platforms/detector sub-systems Other types of hardware that could compromise grounding connections between detector electronics. E.g. ( Gas lines, cooling pipes, cable trays, HVAC equipment ) Infrastructure will have to be flexible to accommodate hardware contingencies, AND provide some margin for spare ‘utilities’. Examples Extra conduit/AC service for rack areas Extra fiber optic trunks to counting room or other locations Signal patch panel [cables] between platforms & counting house

GlueX Collaboration May05 C. Cuevas 4 Infrastructure Summary From the ‘Ground’ up,,, AC power requirements are estimated and will continue to be detailed. Final Front-End electronics designs will determine power requirements. We’ve had meetings with the JLAB civil engineering group and received detailed costs for AC Mains distribution hardware. Good deal of work remains. We have a very good understanding of the costs for ‘Standard’ VME64x crates and power requirements. HV systems for PMT and Wire Chambers will need to be specified soon.

GlueX Collaboration May05 C. Cuevas 5 Infrastructure Summary The Electronics systems infrastructure must provide the foundation for all specifications and ‘rules’ All electronic hardware is documented from the component level to the rack layout configuration diagram. A well defined Infrastructure will certainly help with the long term support and maintenance issues for all electronics including commercial instrumentation and HV systems. Related Thought: Infrastructure documentation ‘database’ will be a rather large and long term project. Resources will have to be considered now. Firmware and algorithm code is one example that covers both infrastructure documentation and the ‘on-line’ group.

GlueX Collaboration May05 C. Cuevas 6 New Developments Recent purchase of new EECAD and simulation tools for circuit schematic simulation and circuit board layout verification has been received. This supports the request/recommendation from previous review panels. JLAB will be able to manage all circuit board schematics and board layout documentation provided by collaborating institutions. It is critical that documentation be accurate, [not necessarily editable], and we MUST establish a method to store and locate firmware files, and parts lists.

GlueX Collaboration May05 C. Cuevas 7 New Developments Flash ADC design is progressing and a bi-weekly ‘engineering’ meeting has helped capture new requirements. Fernando Barbosa and James Proffitt from the electronics group have other design commitments, but understand that the FADC project will become a higher priority. We will count on Ed Jastrzemski’s design contributions, and DAQ support when we get to the stage of high speed readout. The electronics group will develop test software in LabView. We have ordered two VXS crates and will begin some research and prepare for designs using the VXS format for payload and switch modules. New single board Cpu’s, faster backplanes, new test hardware,,,,,,

GlueX Collaboration May05 C. Cuevas 8 END Infrastructure Old Hall Layout Photos

GlueX Collaboration May05 C. Cuevas 9

10 TARGET VETO CDCFDC CERENKOVLGD * All Sub Systems are separated by 1m BEAM LINE TOF