Presentation is loading. Please wait.

Presentation is loading. Please wait.

MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.

Similar presentations


Presentation on theme: "MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien."— Presentation transcript:

1 MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien Graulich, Geneva

2 MICO July 07Jean-Sébastien GraulichSlide 2 Hardware Status Update VME Trigger Scalers arrived - One isn’t working properly - Second not tested Inventory of tested NIM and Camac Crates and PS - 3 NIM crates - 1 CAMAC crate Should be enough – looking for spares Inventory of tested NIM logic boards is Under way 2 new VME crates ordered Did NOT arrive (not critical yet)

3 MICO July 07Jean-Sébastien GraulichSlide 3 Installation @ RAL In R12 (East) 2 VME Crates - 2 Interfaces - 2 Trg Receiver - TDC V1290 - Scaler V830 - fADC V1724 1 PCs 2 NIM Crate 1 Network Switch 2 Scint. + PMT from IC

4 MICO July 07Jean-Sébastien GraulichSlide 4 Installation issue  Detector DAQ Needs Main Power (+ UK power cords) - OK Network access + Dedicated link to Atlas Center ? – OK Took some time … Remote access request is being processed Digital scope - OK

5 MICO July 07Jean-Sébastien GraulichSlide 5 DAQ Workshop  Goals DAQ and Trigger Systems requirements Working document is circulating Organize activities on Online Monitoring and Reconstruction Good progress Introduce & Train people with DATE 7 participants to training sessions Review Tracker readout scheme Plan for the DAQ System Review Will happen around January, depending on Tracker readout test results  Also discussed Control & Monitoring System How to get it started ? Online Database

6 MICO July 07Jean-Sébastien GraulichSlide 6 Current Activities  Readout code for fADC (new format) - GVA  Online Monitoring software framework- GVA Only Ascii event dump available now  Unpacking VLSB data – IIT (Ben Freemire)  Readout code for VLSB - Osaka (Hideyuki Sakamoto)  Initialization of AFEII-t – IC (James Leaver) Via DATE framework first Via EPICS soon after  Data Saver Software – RAL (Matt Thorpe)


Download ppt "MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien."

Similar presentations


Ads by Google