Glasgow Report W. H. Bell, A. Cheplakov, F. Doherty, M. Horn, J. Melone, V. O’Shea UK-V Meeting 03/03/04 -Glasgow.

Slides:



Advertisements
Similar presentations
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Advertisements

23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
1 Liverpool Production Status Week of 23 February 2007.
1 Liverpool Production Status Week of 9 February 2007.
Electrical and thermal testing at Glasgow and Liverpool.
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
TEC X5 Setup (1) 1 Front + 1 Back petal, fully equipped (28 modules F.P modules B.P. + AOH + DOHM) Petal assembly IPN-Lyon (F.P.), RWTH-Aachen I.
Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
1 Compilation. 2 Laser Anneal Verification Test Batch 1 Wafer 14 Dices 3 and 5 14-Oct-2010 to 15-Oct-2010.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
CMS Week – UCSB Gantry Status – March 15, 2005 – Dean White 1 Weekly Status Report Production: 84 hybrids bonded last week, all tested fine. 45 modules.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Anthony AffolderUS CMS Meeting 12/3/2002Proposal of UCSB Short-term Testing Program Assumptions Electrical and optical hybrids not burnt-in prior to arrival.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
SLHC Strip Tracker Module Envelopes (Tim) WP4 Meeting Glasgow, 13 th June 2011.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Status of Gain Mapping at Duke.
ALICE Silicon Strip Detector Module Assembly with Single-Point TAB Interconnections 1) Introduction 2) Collaboration 3) ALICE SSD module 4) Assembly phases.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Manchester Qualification M-O-048. Mechanical dummy. Check that tuning of alignment parameters had correct sign and adjustment of transfer chucks Z was.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
Endcap Module Status Agreed Responsibilities Overall Production UK Situation Global Schedule Issues General Production Issues.
Methods of Installing a new computer-based system.
Status of Glasgow module production Richard Bates The University of Glasgow K.Smith, R. Bates, A. Cheplakov, V. O’Shea W. Bell, J. Melone, F. Doherty,
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Fred Doherty Module Work Fred Doherty. Stave Module Building Hybrid Bonding Bonding table for the BJ820 still in workshop Modified working height of the.
UK ATLAS SCT Module Quality Assurance Joe Foster, Manchester University 04 Jan 2005 All results compiled in time for Christmas…
CDF Japan Meeting, Dec 13-14, Run2b Silicon Detector - Overview K. Hara U of Tsukuba Project Status Sensor Prototype: Delivery Testing at U Tsukuba.
E.Gushchin (INR,Moscow) 09 March 2009 Shutdown Calo meeting CERN Status PS/SPD of LED tuning Status of tuning on A-side. Some problems Results of tuning.
Tilt angles reloaded, and status of some other things.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
Tony WeidbergOpto WG April '081 SCT Links Long Term Monitoring Summary quality installed links Techniques for monitoring long term performance –Data links.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
Event location and decay search in Switzerland Swiss group.
Strasbourg status Ring 7 pilot run François Didierjean.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Valencia Report 5 Pre-qualification (2 mechanical + 3 electrical) All inside mechanical specification in XY after assembled. However, Pre3-Pre5 bad planarity.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
© 2004 Eaton Corporation. All rights reserved. Online Training: Advanced Battery Management.
Hans-Günther Moser, PXD PXD Summary 1 PXD Sessions: Highlights 1)Sensor production 2) EMCM (& bump bonding) 3)System Simulations 4)Power Supplies and Services.
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
ATLAS pixel module assembly flow
T. Bowcock University of Liverpool
MODULE QUALIFICATION STATUS AT LIVERPOOL
Avaya UPS Online Training: Advanced Battery Management
ATLAS Upgrade Module Bonding Trials Using Glass Asics
Executive summary from Bonding WG Meeting 21 Oct 2003
UCSB Short-term Testing Plan
Results from module testing
Computer Repair & Maintenance
UCSB Short-term Testing Plan
First UCSB TEC Module (Pictures)
Encapsulation Studies
Hybrid & Module Testing Status
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Hybrid & Module Testing Status
Use the ten frames to help solve the problems
Perugia SuperB Workshop June 16-19, 2009
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
Presentation transcript:

Glasgow Report W. H. Bell, A. Cheplakov, F. Doherty, M. Horn, J. Melone, V. O’Shea UK-V Meeting 03/03/04 -Glasgow

Glasgow Status  Have 5 bonded production modules.  54 – Failed mechanically at Manchester  81 – Passes all tests after chip tuning  82 – Initially failed due to bonding damage  Chip has been replaced.  Will rebond and complete tests asap.  83 – Has detector charge problems and one chip with a dead front end.  Suspect ESD but no visual confirmation. (Also had bonding trouble with this module.)  Chip will be changed.  85 – Has bad IV.  Suspect scratch.

Module 85 – IV

Slow Down  Bonding problems  Chips at different heights wrt hybrid.  Causing differences in bond strength and reworks.  Understand how to solve these problems  Single Aero  Can’t train or test other DAQ components  Debugging single module – bottle neck

Other Activities  Expansion of testing equipment  1, 4, and 6 box testing capacity  Correction of Jig and duplication  New jig for H&K 710

Getting Up to Speed  Working with Liverpool  Bonded module 85  Pre-acceptance tests at Paderborn  Tested out a range of settings and all parts of the module.  Assisting Liverpool

Outlook  With varying chip heights and other bonder instabilities: no confidence in K&S.  Help with bonding at Liverpool  New bonder  Arrival 08/03/04  Installation and training complete 12/03/04