Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.

Slides:



Advertisements
Similar presentations
SiW ECAL R&D in CALICE Nigel Watson Birmingham University For the CALICE Collab. Motivation CALICE Testbeam Calibration Response/Resolution MAPS Option.
Advertisements

Beam test of novel ASICs and sensors Marcin Chrząszcz Cracow University of Technology Itamar Levy Tel Aviv University.
CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Introduction Felix Sefkow HCAL main meeting February 14, 2006.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
Fiberless Coupled Tiles for a High Granularity Scintillator-SiPM Calorimeter Rick Salcido Northern Illinois University November 14, 2009 Prairie Section.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
30 October 2002Paul Dauncey - CALICE/PRC1 PRC – CALICE Progress Report Paul Dauncey, Imperial College London Representing the CALICE Collaboration.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
Anne-Marie Magnan Imperial College London CALICE Si-W EM calorimeter Preliminary Results of the testbeams st part On behalf of the CALICE Collaboration.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
R&D on W-SciFi Calorimeters for EIC at Brookhaven E.Kistenev, S.Stoll, A.Sukhanov, C.Woody PHENIX Group E.Aschenauer and S.Fazio Spin and EIC Group Physics.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
Hadron Calorimeter Felix Sefkow EUDET Annual Meeting October 20, 2006.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Scintillator ECAL for ILC for Calorimeter Review DESY May2007 Tohru Takeshita (CALICE-Shinshu) Idea implementation current status future mile stones.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
June 4, Scint 2007 Scintillators and ILC 1 Scintillator calorimeters at ILC Jaroslav Cvach Institute of Physics ASCR, Prague CALICE Collaboration 1.Accelerator.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Supervisor: Samir Arfaoui By: Fatma Helal Sawy
GLD-CAL and MPPC Based on talks by T. Takeshita and H. K. Kawagoe / Kobe-U 2005-Sep-16 MPPC
Calorimetry and Muon Overview Felix Sefkow LCWS08 Chicago, November 15-20, 2008.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Scintillator HCAL read-out and calibration Felix Sefkow TILC08 at Sendai, Japan March 4, 2008.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
The CALICE scintillator tile HCAL project Felix Sefkow LCWS’06, Bangalore March 9-13, 2006.
1 Progress from José Repond Argonne National Laboratory LCWS 2007, DESY, May 30 – June 3, 2007 Emphasis on test beam results.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
ILC/EUDET developments at LAL Scientific council 23/9/05 B. Bouquet, J. Fleury, C. de La Taille, G. Martin-Chassard LAL Orsay.
1 Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London.
DESY, 8 Dec 2005J. Cvach, prekick-off JRA3 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Next generation HCAL prototype Felix Sefkow EUDET electronics meeting UCL, December 5, 2006.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Future test beam options Felix Sefkow CALICE AHCAL main meeting DESY, June 16, 2009.
Vincent Boudry LLR, École polytechnique LCTW'09 Orsay 2-5 November 2009 Calorimetry Hot spots.
14.4. Readout systems for innovative calorimeters
JRA3 Institute of Physics ASCR Prague
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Felix Sefkow DESY LDC at Vienna November 17, 2005
EUDET JRA3, Activity Obninsk State University
Status of Ecal(s) for ILD
(My personal) CALICE Report
HCAL task status report
C. de La Taille IN2P3/LAL Orsay
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Joint Research Activity 3: Calorimetry
Vishnu V. Zutshi For the NICADD team.
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Rick Salcido Northern Illinois University For CALICE Collaboration
Testbeam analysis on module #1
Michele Faucci Giannelli
Calice Tile-HCal and Tail-catcher/Muon Tracker
Presentation transcript:

Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006

Felix Sefkow EUDET SC September 11, 2006HCAL 2 JRA 3: Calorimetry  Activity organized in 5 tasks:  Electromagnetic Si W calorimeter  Scalable prototype, Si sensors and electronics integration  Ecole polytechnique and Prague  Hadron calorimeter  Scalable structure, calibration system and electronics integration  DESY, Prague and Hamburg + associates: Russian groups + Bergen U.  Very forward calorimeter  Laser positioning systems, sensor characterization, electronics  DESY, Cracow, Prague and Tel Aviv + associated  Front end electronics  ASICS and integration for different calo types  LAL, Ecole polytechnique and DESY  Data acquisition  Scalable system, for prototype and as basis for common detector DAQ  University College London and associated UK groups

Felix Sefkow EUDET SC September 11, 2006HCAL 3 Kickoff Summary  The goal is to propose a realistic HCAL for the ILC by the end of the decade  Novel concept: PFLOW imaging  Novel technologies: embedded SiPMs  Realistic = scalable + basis for costing  The HCAL task – together with FEE and DAQ – will provide a framework for  The R&D towards a realistic detector structure  Connecting to the dynamic photo-sensor developments  Feedback from the testbeam effort will be vital for the refinement of concepts in the near term conceptual phase

Felix Sefkow EUDET SC September 11, 2006HCAL 4 Milestones and Deliverables reports Concepts, designs – and final prototypes concepts PPT construction Testbeam data taking feedback designs construction VME test stand

Felix Sefkow EUDET SC September 11, 2006HCAL 5 Calibration system test stand VME-based system For tests of optical calibration system electronics –Presently working with APD readout –Crate, ADCs, discriminators –Already used for tests of present testbeam equipment Also: complement testbeam calibration electronics (scope, computer, NIM p/s not on EUDET bill) Prague IPASCR

Felix Sefkow EUDET SC September 11, 2006HCAL 6 Concepts roadmap Milestones on the horizon 1.Mechanical concept 9/ Calibration electronics concept 9/2007 Ingredients to mechanical concept –Photo-sensor developmentIndustry –Photo-sensor scintillator couplingus, and associates –Electronics to photo-sensor coupling next –Electronics integrationthen –Calibration conceptparallel Ingredients to calibration concept –Photo-sensor development + couplingstarted –Testbeam experiencestarted

Felix Sefkow EUDET SC September 11, 2006HCAL 7 Blue-sensitive SiPMs New devices from Hamamatsu 400 pixels on 1mm 2, moderate crosstalk 2-3x more lightyield with green WLS ~ 6 times more with blue scintillator light Simplified coupling –Plan test layer for testbeam Or: Thinner scintillators –Save detector volume and cost –ECAL applications N Dascenzo 13 ph.e / MIP

Felix Sefkow EUDET SC September 11, 2006HCAL 8 ECAL TCMT HCAL Testbeam at CERN SPS SiW ECAL 1cm 2 pads, 30 layers Sintillator HCAL, SiPM readout 15 of 38 layers installed Common DAQ 18’000 ch ECAL HCAL Tail catcher 8 of 16 scintillator strip layers

Felix Sefkow EUDET SC September 11, 2006HCAL 9 Hadron data taken August 25-30: ECAL + HCAL September 1-4: HCAL alone –Low energy data (6, 10, 20 GeV) –High energy 30…80 GeV: about 500k e, 1M pi at each point More than 10 million events, with and mostly without ECAL E (GeV) Raw secondary (for beam studies) Electron filtered (~95% pure pions) 80~50 k300 k + collimator tuning 60~50 k500 k 50~50 k350 k 40~50 k450 k 30~50 k380 k

Felix Sefkow EUDET SC September 11, 2006HCAL 10 Hadron events V.Morgunov >4 MIP >1.8MIP & <4MIP >0.5MIP & <1.8MIP

Felix Sefkow EUDET SC September 11, 2006HCAL 11 Analysis started Hadron and electron shower profiles –Electron data allow detailed verification of detector understanding and calibration accuracy Detector response studies for varied operating conditions –Modify bias as substitute for temperature variations –Some coherent noise observed, under study Needs some engineering resources Marius Groll (UHAM)

Felix Sefkow EUDET SC September 11, 2006HCAL 12 HCAL outlook Layer production: –Module 20 done –Module in prduction –Module 23-24: tiles received  expect 2/3 of detector for October run October ECAL + HCAL + TCMT –Combined particle flow reconstruction Movable stage: –Delayed (base plate manufacturing, assembly) –Will not be available for October run –Blocks engineering resources for mechanical concept

Felix Sefkow EUDET SC September 11, 2006HCAL 13 Progress summary  R&D around new photo-sensors underway  R&D roadmap to be laid out  Real test beam data are starting to roll in  Detector analysis started  EUDET concept and schedule largely driven by testbeam  Operational experience  Engineering resources  schedule risk

Felix Sefkow EUDET SC September 11, 2006HCAL 14 Financial information Consumables: –Only IOPACSR Allocated: 12k, Spent:15.5k Staff: –DESY Allocated 31k, Spent: 0, expect 8k –IOPASCR Alllocated 6k, Spent: 0, expect to start in 2007 Travel: –Monitored by institute; to be sub-discriminated by task?