Josh Stein 29-Apr-08 Undulator Controls Undulator Controls Status Update Josh Stein LCLS Undulator Controls CAM/TL.

Slides:



Advertisements
Similar presentations
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Advertisements

Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
Ernest Williams FAC November 2008 Control Systems Software Section 1 Controls System Installation Status Ernest Williams for Controls Department.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
Venkat Srinivasan FAC: BFW Test Update 06/17/ Facility Advisory Committee BFW Calibration Test Results on behalf of: Jim.
1 Arturo Alarcon 1 Undulator Controls Status FAC Undulator Controls Status Arturo Alarcon June 9, 2009.
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
Undulator Control Module Facility Advisory Committee Review, October 30th 2007.
LCLS Undulator Alignment and Motion Review 1 LCLS schematic view LCLS Undulator Alignment and Motion Review.
Supply Chain Management
Stephen Milton 12 Jan IDR of Undulator System Fixed Supports 12 Jan
Marion White Magnets & Supports April 16, 2007 Undulator Magnets and Supports Status.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Arturo Alarcon FAC, Undulator June 17, 2008 Undulator Control Module Facility Advisory Committee June 17, 2008 SLAC -
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
C.E. Rago Inj/Lin Design & 4_20_06 1 Injector / Linac Design & Fabrication C.E. Rago FAC Review 04_20_06.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
SPEAR Insertion Device Controls Upgrade Status Arturo Alarcon January, 2014.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
MRP Systems MRP – Material Requirements Planning Commonly used method in industry to coordinate the production scheduling of end items and their associated.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
LCLS Undulator Positioning Control System Shifu Xu, Joseph Xu, Josh Stein Control Group, AES/APS, ANL June 15, 2006.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
Joshua Stein LCLS Undulator 20 Feb 06 LCLS Undulator Controls ANL LCLS All-Hands Meeting February 20, 2006 Josh Stein Argonne.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
Jeff T. Collins Undulator Support/Mover System 20 October 2005 LCLSLCLSLCLSLCLS LCLS Undulator Support/Mover System.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
ProtoDUNE – DSS Installation, Alignment and QA
Undulator System Installation
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
LTU/Undulator Installation Status
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Undulator Controls Breakout
Undulator System Components Status Dean Walters
LCLS Undulator System Status and Schedule
LCLS Undulator System Production Management
LTU/Undulator Installation Status
LCLS Undulator System Status and Schedule
Installation Status & Operational Readiness Process
Beam Finder Wire (BFW) Status
Undulator Alignment Plan
Breakout Session SC3 – Undulator
LCLS Undulator Controls Status
LCLS Control System Personnel Linac & BC2 Controls progress
Presentation transcript:

Josh Stein 29-Apr-08 Undulator Controls Undulator Controls Status Update Josh Stein LCLS Undulator Controls CAM/TL

Josh Stein 29-Apr-08 Undulator Controls Rack Design Layout of rack is complete AC Distribution design is done; parts are ordered and fabrication started Penetration punching began for both cables and AC Rack installation Desire for racks to be installed mid-June is tight due to delivery delays of UCMI. We are changing our plan to phase-deliver these instead of one large shipment. Mounting hardware being pulled out of racks this week for delivery to SLAC in May. With Fuller gone, who is the “go-to” person for these type of issues?

Josh Stein 29-Apr-08 Undulator Controls UCM Status UCMI Design complete - contract awarded Expect first article delivery 2nd week of May Following units begin shipping about 2 weeks after acceptance UMPI Design is complete - drawings in final signature process All parts are on-site including long lead-time high power supplies Assembly will be done in-house starting May 12. Expect to take less than ~2 weeks. All VME hardware already on-site

Josh Stein 29-Apr-08 Undulator Controls Software UCM Software testing and debugging complete. Version 1.0 released yesterday (4/28) Using latest RTEMS build (4.9) which corrects network- disconnect crash. Suggest that SLAC use a “standard” RTEMs build Cleaning up documentation Being used in support of other LTT tests X-Translation alignment procedures CAM calibration Installation tests

Josh Stein 29-Apr-08 Undulator Controls Software details Independent upstream motion in X and Y Independent downstream motion in X and Y Combined Upstream/Downstream motion in X and Y (same X,Y set points simultaneously) CAM motor velocities are individually adjusted so all motors move simultaneously (virtual coordinated motion) Individual CAM motor motion is available

Josh Stein 29-Apr-08 Undulator Controls Software details Undulator linear translation motion - IN (beam center), OUT (service mode?) Linear translation motion skew monitoring (software and hardware levels) Individual translation motor motion is available RTD temperature monitoring around girder assembly BFW insertion/retraction and position readback (limit switches and potentiometer)

Josh Stein 29-Apr-08 Undulator Controls Software Details CAM calibration - ioc collects motion data that is processed by Octave program Smart Monitors - loss of communication to individual Smart Motor(s) position discrepancy between motor readback and potentiometer position (within tolerance) individual motors will be prohibited from motion if one of the above states occur Ioc sequence program to assist in recovering motor positions after power loss (load potentiometer values into motor positions)

Josh Stein 29-Apr-08 Undulator Controls Concerns Top 3 items that keep me up at night Rack components delivery (UCMI/UMPI) This has direct impact on delivery of racks If schedule slips much (>week) we may need to deliver some racks without some components installed. This will affect our handover plan. X-Translation alignment Tight tolerance here may make alignment very difficult The “whoops” factor Been bitten by this bug before Delivery of linear pot adapters and clips Right-angle connector for downstream translation stage potentiometer ???