Presentation is loading. Please wait.

Presentation is loading. Please wait.

MT Continuum Status 15-17 Feb 11 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team.

Similar presentations


Presentation on theme: "MT Continuum Status 15-17 Feb 11 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team."— Presentation transcript:

1 MT Continuum Status 15-17 Feb 11 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team

2 Overview MT Continuum overview Application to other communities Project status

3 MT Continuum Prototype Project Strategic Systems Programs (SSP) re-engineering 30+ week training pipeline for TRIDENT Ballistic Submarine (SSBN) Missile Techs (MTs) into blended just-enough/just-in-time ILE- conformant Instructor Led (ILT) and self-paced segments AIM CPM and LO Module toolsets part of SSP’s baseline business process for this re-engineering First major end-to-end design, development, and maintenance project that’s defining CPM/LO Module business rules and data exchange mechanisms MT Continuum team: –SSP / contractors - Requirements Owners –NAWCTSD / AIM team - CPM/LO Module support –LSI, Inc. - ISD and self-paced content design/development

4 Application to Other Communities Based on NETC-mandated JDTA as fleet performance requirement basis for learning content design and development Closely coordinated with NAVEDTRA 136 development NETC N7 staff recommended as “Poster Child” for ongoing NETC Continuum effort with all Centers Integrated development and maintenance environment for blended, SCORM and 136- compliant learning content

5 Project Status Plan, Analyze and Design Completed –JDTA –Establishment of initial 3 major projects –Approval of revised 11-project structure Approval of learning objectives Approval of ISD considerations elements Production Phase Kickoff Pending –Will be followed by export of 11 projects from CPM to LO Module for production development in AIM I Rel 4.1 on fedsun

6 Questions?

7 Backup Slides

8 AIM Tool Usage Dedicated MT Continuum Prototype CPM and AIM I Rel 4.1 instances hosted in Orlando Local AIM I Rel 4.1 instances running at GD-AIS Pittsfield (SMEs) and at LSI Jax (ISD/CD) Bi-directional data exchange between LO Module and LSI Venus.net LDC authoring toolset in place Excellent feedback from MT Continuum team on enhanced functionality and performance needed in CPM & LO Module

9 AIM Tool Usage (contd) Status: –Per GD-AIS feedback, performance-enhanced version of AIM I Rel 4.1 running locally in Pittsfield and Jax as well as on Orlando server –Per GD-AIS feedback, significant enhancements made to AIM I Rel 4.1 storyboard functions/output –Several additional enhancements recommended by GD-AIS incorporated into AIM I Rel 4.1 (Jan 11 delivery) –AIM team resolved performance and reliability issues with Orlando fedsun Metaframe instance

10 Issues/Concerns “End to end” surveillance/maintenance test on TLO/ELO in process to: –confirm existing change impact identification functionality in CPM and LO Module –identify near-term updates –refine longer-term enhancements Testing begun by Mark Campbell and Mike Lueken (LMMS) w/ favorable results Identified critical issues addressed as part of AIM I Rel 4.1 and 5.0 Further testing surveillance testing on LDC is still required and ongoing with Rel 4.1 by Jamie Swaim (CSF) Team continues to refine versioning business rules/process

11 11 Modernized AIM Modernized AIM can tie the entire process together Modernized AIM can tie the entire process together

12 MT Continuum Process 12

13 FRM Inputs on Enhancements Item 4.2.4.37: Add support to update Section content using the No-Change Change capability like AIM I. Item 4.2.4.38: Add ‘Select Later IETM’ functionality in the LO Module to update your Section’s IETM links with a later version of an IETM without having to reselect nodes


Download ppt "MT Continuum Status 15-17 Feb 11 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team."

Similar presentations


Ads by Google