Download presentation
Presentation is loading. Please wait.
Published byQuinn Spendlove Modified over 9 years ago
1
FODDERGROW LTD
2
Factory Installation Inspection form Manufacturing & Installation Transport
3
BioBooster material Plastic Sun energy Low running costs Advantages of the plastic
4
Cooling Evaporative Cooling system
5
Maintenance and Hygiene BioBoost Spore buster Guaranties Lime control Filter Draining holes
6
Electrical Single phase or DC power 0.75kw irrigation pump 0.42kw fans
7
Irrigation Pump Non-dripper valves Sprayers Solenoid valves Timer for irrigation
8
Irrigation (continue) Water gets pumped Intervals for watering Water usage
9
Seed and seeding Purchasing Weighing Soaking (1hour) Measuring cup Seeding the trays
10
Harvesting the fodder Grow for 5-7days Harvest from day 5-7 Can combine seed
11
Feeding and additional feed Fodder Roughage Bacteria
12
Feeding Weight gain Milk production Overall health
13
Client needs the following Concrete slab Power supply or DC solar Water point
14
Floor plan The plan for the slab
15
Day 1 Day 2 Day 3 Seed to feed
16
Day 4 Seed to feed (continue) Day 5 Day 6 Day 7
17
Different feed Barley and Maize Barley Canola
18
Different feed (continue) Lupens Sunflower Oats
19
Feed for variety of animals Cattle Goats Pigs
20
Feed for variety of animals (continue) Sheep Ostrich
21
Feeding in extreme conditions Suitable for all weather circumstances
22
Thank you
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.