Presentation is loading. Please wait.

Presentation is loading. Please wait.

I & C TC Korea Chapter Liaison Report

Similar presentations


Presentation on theme: "I & C TC Korea Chapter Liaison Report"— Presentation transcript:

1 I & C TC Korea Chapter Liaison Report
March 2017

2 Outline Leadership Organization Chart Meeting Information
Major Updates Task Force Updates

3 Leadership Committee Co-chairs Leadership Change None
Chulhong Ahn/ SK Hynix Hyungsu Kim/ Doople Gunwoo Lee / Lam Research Leadership Change None

4 Organization Chart <Information & Control> Committee
<GEM300> TF L: Byoung Min Im (TEL Korea) L: Chang Yul Cho (SEMES) L: Jong Sub Shim (ASM) <Information & Control> Committee C: Chulhong Ahn (SK hynix) C: Hyungsu Kim (Doople) C: Gunwoo Lee (Lam Research) <ABFI> TF L: Youngshin Im (Miracom Inc.) <DDA> TF L: Hyungsu Kim (Doople)

5 Meeting Information Last meeting Next meeting
Thursday, Feb 9, 2017 at Coex, in conjunction with SEMICON Korea 2017 Next meeting Friday, June 16, 2017 at SEMI Korea Office, Seoul, Korea

6 Major Updates Ballot Result (Cycle 9 - 2016)
Ballots to be Issued for Korea Summer 2017 Meetings Adjudication Doc. # Document Title Action 5832 New Standard, Specification for Generic Counter Model Failed and Rework Doc. # Document Title Voting Period 5832A New Standard, Specification for Generic Counter Model Cycle

7 Task Force Updates (1/2) GEM 300 Task Force
5832 (Generic Counter Model) Doc was failed and sent back to the TF for rework. Doc. 5832A is authorized for cycle 4. 4946 (Revision to E87) SNARF will be reviewed to make sure the contents are up to date. The target ballot schedule is Cycle 6 or 7 however it depends on NA I&C TC Chapter’s adjudication result on Doc (Revision to E87.1) 5833 (Maintenance Program Model) The comments on concept duplication between Doc.5833 and existing standards such as E30 and E40 were received from previous ballot result. The author started to consider withdraw the activity. The final decision will be made in the next committee meeting

8 Task Force Updates Diagnostic Data Acquisition Task Force
Freeze 3 development status was updated to the committee. The TF leader decided to collaborate with NA DDA TF by sharing issue list. The TF will collect and summarize further feedback on Freeze 3 and share it at the NA Spring meeting. Advanced Back-end Factory Integration Task Force The TF reviewed the urgent standardization items and decided to revise E142 first. The SNARF and the first draft will be submitted on next committee meeting.

9 Thank you For more information or participate in
any Korea activities, please contact Natalie Shim at SEMI


Download ppt "I & C TC Korea Chapter Liaison Report"

Similar presentations


Ads by Google