Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.

Slides:



Advertisements
Similar presentations
Mechanical Engineering Design Review BL ARPES Endstation Derek Yegian, Jonathan Denlinger, Keith Franck 4/18/2008.
Advertisements

CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Atlas standard opening ATLAS Project Document N°: ATL-HT-OP-0014 EDMS id Created : January 13 th, 2009 Modified : Main document Overall view of.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
BML chamber assembly Maria Curatolo LNF/INFN. Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Granite Table Granite table (on.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
ATLAS End-Cap C Proposed Transport Box P Cooke 15 June 2005.
1 13 Oct 2006 Small Wheel Phase 1.9 Logistics C. Weaverdyck N. Nation 13 October 2006.
Installation. Indoor Unit Installation Typical Installation.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
SQXF Shell & Yoke Assembly Procedure
Upgrade news and Proposed interventions during YETS for the Muon Barrel Alignment Szillási Zoltán, Béni Noémi (ATOMKI ) This project is supported by Hungarian.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
TIB-TID insertion test into the CMS Tracker cylinder ________________________________________________________ Tracker week july 04
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
ATLAS Endcap Muon System WBS 3.5 Frank Taylor MIT M&O Request FY06 Toronto August 3, 2005 V1.1.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
The BaBar Upgrade Load transfer of the Barrel and Endcap Calorimeters Richard F Boyce 21 October 2003.
ATLAS closing scenario  Where we are  What is still be done before closing (ADO-PO support)  Closing scenario / Procedure / Schedule Prepared by Michel.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
Muon barrel cooling G. Aielli and J. Godlewski LS1 TC planning.
Project Office Activities R. Vuillermet 08/09/2015R. Vuillermet PH-ADO-PO1.
ICARUS Collaboration Meeting Dec A. Scaramelli.
1 Antonio Romanazzi 3D CFD study of the ATLAS (UX15) ventilation system.
Baby Mind C OIL DESIGN AND ASSEMBLY SCENARIOS Helder Silva Phillipe Benoit Alexey Dudarev Gabriela Rolando Herman ten Kate Etam Messomo Laurent Nicola.
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Kitakami Side AHCAL Assembly or anywhere in any detector.
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
ADO-PO / TC meeting NJD/NSW Assembly Raphael Vuillermet.
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
SuperQuest Salem Arms – Best Practices.
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
SBN Far Detector Installation & Integration
SX1 manipulation VERSION 1 Version
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
Escalator Installation
Experimental hall design in Japanese site
INSTALLATION SEQUENCE
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Platform for Target Spectrometer using linear montion drive Rexroth
nSW Alignment Installation
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
Initial BIS installation
Installation plans from mid 2005
Mounting a BalanceBox®650 to a brick wall
Bunker Wall Design Wall ESS
Muon Installation Status
Presentation transcript:

Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools Contents: 1.Insertion in sector 13. Situation on sides A and C. 2.BM installation scenario 3.BOS installation scenario 4.Information needed for the design of supports and installation tools Elevator muon chamber Workshop 01/08/2012 Wim Van Emden, Alexander Seletskiy, Giancarlo Spigo, Tatiana Klioutchnikova

Situation on side C No HF truckWhenHow long BW open, JF out27/03/ days max. ECT moved to USA04/04/ hours SW closed, truck up14/08/2014 ECT closed, truck away 21/08/2014Until BW-C closing on 12/09/2014 Side C long opening for the IBL installation will not allow much space for the chamber insertion in sector /08/20122

Situation on side C Most of time the situation on side C is the following: End-Cap Toroid moved laterally to USA side on the light truck and Extended Calorimeter in long opening on the heavy truck. In this situation very complex manipulations are necessary to bring the BOS chamber into the trench in sector 13. Heavy truck has a connection beam between the feet so that only separate parts ( MDT or RPC ) can pass under this beam. For the full assembly MDT+2RPC the insertion is preferable at the moment when there is no truck in front of the forward trench. Installation scenario allows only one precise moment for the lowering and insertion of BOS chamber on side C: 01/08/20123

Situation on side A No HF truckWhenHow long BW open, JF out EEL sect.15 instal. 27/03/20135 days ECT open, top platform installed 04/04/2013Until closing 04/08/4014 Other? ECT closed, truck away 08/2014Until BW-A closing on Sept Standard opening on side A leaves more possibilities for the chamber installation.

Situation on side A On side A the platform installed on top of End-Cap Toroid allows to lower down BOS and BM chambers with transport and installation frames using a surface crane. Then the chambers can be transferred to the floor of the forward trench with help of the cavern crane. There is enough space on USA side for this operation. 01/08/20125

BM insertion to sector 13 Worst case – side C Lowering down BM chamber with lorry using 20t surface crane Rotate and move below the truck 01/08/20126

BM insertion to sector 13 Hand crane Temporary support BM chamber mounted with the help of the hand crane and put on the profile extension installed on the temporary supports. The lorry with BM chamber can be moved to the elevator zone on the profiles installed in advance. Inside sector 13 the chamber in rotated and fixed to the horizontal position. 01/08/20127

BM chambers installation in elevator region Installation Sequence Step by Step Wim Van Emden Step 1 : Install rail, brackets and junction and survey the rail within +/- 1mm. 01/08/20128

Step 2: Remove the beam clamping and in order to create space for the installation lorry, slide back the rail extension to the ‘parking position’ 01/08/20129

Step 3: Prepare the lifting procedure: The lifting beam will be supported on the voussoirs. Attach the slings through the lifting beam, pallonier and the installation lorry. Lifting Beam Pallonier 01/08/201210

Step 4: Lift the lorry in vertical position and rotate the chamber in horizontal position. Slide the rail of the extended part backwards in order to avoid a clash with the chamber during rotation. Extension 01/08/201211

Step 5: Also for the fixed rail, before rotation of the chamber slide the rail and center pin backwards. Step 6: Center the rail of the lorry with the connection pin and slide the chamber on the rails. Note: at this time the lorry is the additional support of the rail. 01/08/201212

Step 7: Push/pull the chamber on the rail support and disconnect the rails of the lorry and support. For the lowering-down of installation lorry, the elevator could be used. Step 8: The lift/lorry goes down. Now, the extensional rail support must be connected again with the fix rail support. The max. estimated survey accuracy : +/-1mm Fixed rail support Extensional rail support 01/08/201213

Step 9: Move back the extensional rail support from the parking position to the fix rail support connect the junction. Now the chamber can be moved to run position 01/08/201214

01/08/ Design of support bracket and definition of distance between rails

Optimization of support bracket number Minimum number of supports is 6 pairs of brackets. If 2 additional pairs are added there is more possibilities to move the chamber in different positions to access services on BML chambers 01/08/201216

BOS chambers installation in elevator region Alexandre Seletskiy Two possible scenarios: 1.Installation in one block: MDT and 2 RPC fixed together on the same frame 2.Separate installation of MDT and 2 RPC chambers into one frame. Possibility to bring RPCs and insert it later. 01/08/201217

Scenario 1: Installation in one block: MDT and 2 RPC fixed together on the same frame Rails are installed on adjustable brackets in advance. Rails are surveyed in position +/- 1mm. Assembly of 3 chambers is brought in the transport frame. The height of the wheels should be adjustable in order to put rail of the frame parallel to the surveyed rails. Then the rails can be connected together and the chambers slide into it’s positions defined by stoppers. Advantages scenario 1: Installation in one peace Easier adjustment of rails without weight of the chamber, more space for installation and adjustment Disadvantage scenario 1: All the chambers should be ready for the moment of installation. The date for the installation is fixed for the side C. 01/08/201218

Scenario 2: Separate installation of MDT and 2 RPC chambers into one frame. Side A a)The frame with MDT is moved on wheels to the final position. There the weight is transferred to the brackets. The brackets allow the positioning adjustment. Final tuning can be done inside the frame if necessary. b) RPCs can be brought with the light transport frame and installed into the frame later 01/08/201219

Scenario 2: Separate installation of MDT and 2 RPC chambers into one frame. Side C On side C it is possible to slide the frame with chambers between the air pads below the truck. Advantage scenario 2: Possibility to install RPCs later when the frame is in place Disadvantages scenario 2: More difficult to adjust positioning of the chamber, less space for the operations Design of the frame more complex Second transport frame is needed for RPC installation 01/08/201220

4. Information needed for the design of supports and installation tools 1.Agreement on the run position for BOS (MDT and RPC) chambers 2.Dimensions and frame design for the RPCs 3.Decision on the installation scenario for the BOS 4.Information concerning on-chamber services and alignment equipment 01/08/201221