TRD Electronics Flight Production Wim de Boer, Kai Gassmann, Florian Hauler, Andreas Sabellek, Mike Schmanau IEKP - Universität Karlsruhe (TH)

Slides:



Advertisements
Similar presentations
1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!
Advertisements

M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Status of Tracker Power supply electronics Mauro Menichelli,Sandor Blasko,Lucio Accardo INFN Perugia.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
TDR2 FM board tests D. Haas Test Setup Test Procedure Functional tests Results Test Schedule.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
Summary of Fuse Testing for Barrel Module Fuse Boxes Duke University Jack Fowler.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
TRD DAQ (U) Software Status TIM CERN May.09 Chanhoon Chung, Mark Millinger, Andreas Sabellek IEKP - Universität Karlsruhe (TH)
TAGGER MICROSCOPE ELECTRONICS CONSTRUCTION Readiness Review Feb. 7, 2013 Alex Barnes.
BepiColombo/MMO/PWI/SORBET PWI meeting - Kanazawa 24/03/2006M.Dekkali MMO PWI Meeting Kanazawa University 24 th March 2006.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
Modelling of TPM noise problems Greg, following discussions and measurements with David and Senerath.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
LSU 09/12/2013Electronics - SkeeterSat1 Building SkeeterSat Inventory Components  Identify components Use the parts list and assembly manual  Tape to.
A.Kounine 13 Jan 2007Flight Software Status1 JSC 13 January 2007 Andrei Kounine / MIT.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Tracker Summary Alan Bross MICE CM October 10, 2007.
8/9/2000T.Matsumoto RICH Front End RICH FEE Overview PMT to FEE signal connection Trigger Tile Summation of Current RICH LVL-1 Trigger Module1,2 What is.
The power supply system of the AMS experiment M. Menichelli, L. Accardo, G. Ambrosi, R. Battiston, M. Bizzarri, S. Blasko, D. Cosson, E. M. Fiori, O. Maris,
UG-crate status AMS TIM - CERN - 15/4/2008 A.Bartoloni, B.Borgia, F.R.Spada* INFN Roma.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
Statistics 1670 components 5839 solder joints 4 routing layers 6 power planes 1858 vias total trace length 35 m dimensions 220 x mm 3 FPGA’s (1.
Status of shaper prototype production B.G. Cheon (Hanyang U)‏ Dec. KEK 1 st open meeting of the Super KEKB Collaboration.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Status of NA62 straw electronics Webs Covers Services Readout.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Tracker meeting – July, 2006 TBS – TPSFE FM/FS tests Lucio Accardo, INFN Perugia.
TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.
AMS TRD meeting Electronics 17th July 2002, CERN G. Schwering: Overview M. Capell: Crate Mechanics/Arrangement W. Karpinski: Front End – Status C.H. Chung:
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
PACS IBDR 27/28 Feb 2002 Digital Processing Unit1/16 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
AIDA FEE64 production report January 2011 Manufacturing Power Supply FEE64 revision A “3 hour test” 19th January
06/03/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  Overview Design summary Results from 2nd radiation tests in PSI Villingen Bulk supply Plans for future.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
VAC – CTRL SYS internal meeting, 14 Dec A list of topics Start of the disassembly works: mid Jan. At first the W arm shall be off- service, then.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
Status of the SVD DAQ Koji Hara (KEK) 2012/1/16 TRG/DAQ meeting1.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
HE FEE Boards production status 26 th May 2016 Mandakini Patil 1.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Development of T3Maps adapter boards
Bill Raynor Naval Research Lab
Markus Friedl (HEPHY Vienna)
HF Test station at P5 A.Mestvirishvili.
T1 Electronic status Conclusions Electronics Cards:
swingo XP Firmware, Service Tool & Error Codes
University of California Los Angeles
Krzysztof Czuba ESS LLRF Quarterly Meeting
Presentation transcript:

TRD Electronics Flight Production Wim de Boer, Kai Gassmann, Florian Hauler, Andreas Sabellek, Mike Schmanau IEKP - Universität Karlsruhe (TH)

09/01/2007TIM Jan07, JSCAndreas Sabellek, IEKP 2Outline TRD Electronics Overview Status of FM/FS TRD Electronics production at CSIST Results of Board-level acceptance testing Dec 06 Report on replacement procedure of Actel FPGAs Updated Time Schedule for FM U-Crates assembly and testing

09/01/2007TIM Jan07, JSCAndreas Sabellek, IEKP 3 TRD(U)-Electronics Overview UCrate =TRD electronics crate UBP =TRD backplane UPD=TRD power distribution box UPSFE=TRD power supply for front end UDR=TRD data reduction board JINF=data concentrator and link to higher DAQ UHVG=TRD high voltage generator UFE=TRD front end UTE= TRD tube end UHVD=TRD high voltage distributor V2 U = Uebergangsstrahlung

09/01/2007TIM Jan07, JSCAndreas Sabellek, IEKP 4 QM2 UPD and U-Crate One set of fully qualified QM2 TRD Electronics Crates (two set of FM Crates needed for complete TRD readout) Slow control connection to U-Crate Power supply connectors for U-Crate and 28V 6 UHVGJINF3 UPSFE6 UDR2

09/01/2007TIM Jan07, JSCAndreas Sabellek, IEKP 5 Status of FM/FS Production at CSIST, Taiwan DCDC Converter (S9056,S9048,S9053): FM/FS board production and test completed (May.06, presented on TIM Jul.06) S9011AU Controller: FM/FS board production and acceptance test completed (Dec.06) UBP: FM/FS production finished; Board assembly ongoing UDR2: FM/FS board production and acceptance test completed (Sep/Dec.06, presented on TIM Oct.06) UPSFE: FM/FS board production and acceptance test completed for 7/9 boards (Dec.06) UHVG: reworked by VK; FM/FS production in progress, PCA delayed by components found out of specification (MIT) JINF: FM/FS production ongoing (MIT) U Power Distribution (UPD): U DAQ Electronics (U-Crate):

09/01/2007TIM Jan07, JSCAndreas Sabellek, IEKP 6 S9011AU Controller FM/FS Test Actel FPGAs with new Firmware are used Some resistors mounted wrongly (unsoldered according to latest BOM) 95001F: Short between two status lines on Actel pinout corrected (seen in functional test) Number of Boards tested: 4 (2 needed as FM) Testprocedure (before/after Coating and ESS): - Functional test via Lecroy communication - Signal and status lines tested with a DCDC converter (“needle” backplane used – no soldering on FM-boards necessary) - SSF test Summary of Test Results:

09/01/2007TIM Jan07, JSCAndreas Sabellek, IEKP 7 UDR2 DAQ Board FM/FS Test No problems or errors seen Test-backplane Number of Boards tested: 15 (12 needed as FM) Testprocedure (before/after Coating and ESS in Dec.06): - Functional test via AMSWire communication - Data acquisition with FM-Front-Ends - Current monitoring on Test-backplane - SSF test Dec.06

09/01/2007TIM Jan07, JSCAndreas Sabellek, IEKP 8 UPSFE FM/FS Test Actel replacement after Firmware modification done, but mounted pairwise into wrong position (see Report on replacement procedure) Some resistors with wrong values exchanged 95003F: FPGA off-signal failure; Actel problem in off-state, will be exchanged 95005F: one LR SSF failed after ESS; part failure found, will be exchanged Number of Boards tested: 9 (6 needed as FM) Testprocedure (before/after Coating and ESS): - Functional test via Lecroy communication - Linear Regulator test (28 circuits/board) on a Fusetest-backplane - Signal and status lines tested - Current monitoring - SSF test UPSFE board 14x2 LR test circuits Off-signal LEDsStatus Jumpers Summary of Test Results: Fusetest Backplane

09/01/2007TIM Jan07, JSCAndreas Sabellek, IEKP 9 Actel Replacement Procedure 1/2 Solution to misplaced Actel FPGAs proposed and done by CSIST: desolder and swap same ICs to correct position Thermal stress during desolder process is lower than in reflow soldering process of regular mounting Hot air nozzle Vacuum lifter Bottom fan 100°C FPGA pads have experienced 5 unavoidable de-/solder processes now Careful inspection necessary!

09/01/2007TIM Jan07, JSCAndreas Sabellek, IEKP 10 Actel Replacement Procedure 2/2 + Manual soldering Flux 5sec slide/edge

09/01/2007TIM Jan07, JSCAndreas Sabellek, IEKP 11 FM UPD Assembly Status CSIST technicians will follow UPD Assembly document prepared by Mike Schmanau Production of needed I-Frames for UPD boards was finished with priority in Dec 06 Cabling and soldering work on UPD boards is waiting for materials and tooling; most needed parts will arrive mid January Board typeNumber needed (two UPD Boxes) Now available for Box assembly Status S9048 Converter 66 fully tested S9056 Converter 66 fully tested S9053 Converter 22 fully tested S9011B Filter 20 Short Test will be performed by Mauro soon S9011AU Controller 24 fully tested Assembly discussion at CSIST

09/01/2007TIM Jan07, JSCAndreas Sabellek, IEKP 12 FM U-Crate Assembly Status JINF production and testing has to be finished UHVG production and testing has to be finished; PCA now waiting for new part supply CSIST accepted to produce three set of flight cables for us - materials will be delivered mid January - U Cabling document is being prepared (lenghts and procedure) - final cable lengths already partly verified on wooden mockup (Andrey) Board typeNumber needed (two U-Crates) Now available for Crate assembly StatusExpected date to be finish UDR Fully tested UPSFE 67 Fully tested UBP 22 Processing conformal coatingmid Jan 07 UHVG 120 PCA for 1 board done and tested by VK; waiting for new parts Feb 07? JINF 20 PCA for 1 board done; waiting for testJan/Feb 07

09/01/2007TIM Jan07, JSCAndreas Sabellek, IEKP 13 Time Schedule (updated) Delays: shipment of UPD assembly materials and tools to CSIST; late Chinese New Year holidays in February Full TRD readout test with FM Electronics will be performed in Aachen

09/01/2007TIM Jan07, JSCAndreas Sabellek, IEKP 14 Status Summary Board-level acceptance tests were completed for needed FM boards in December06 (excluding Uhvg and Jinf); two UPSFE boards still need part exchange Assembly of two FM set of UPD and U-Crate will start as soon as materials arrive at CSIST

09/01/2007TIM Jan07, JSCAndreas Sabellek, IEKP 15 Backup Slides

09/01/2007TIM Jan07, JSCAndreas Sabellek, IEKP 16 Actel off-signal Failure Consequence: two UHVG boards cannot be switched to ON state Lucky incident: after a replacement also observed on QM2 board with a new Actel Actel0 (on) output: high/low opens/closes transistor Actel1(off) output: constant drop 0.6 V UHVG input: Small current (which is OFF state)