1 Krzysztof Czuba ESS LLRF Quarterly Meeting 08.11.2018
Status of PEG Krzysztof Czuba ESS LLRF Quarterly Meeting

2 ESS PEG Progress Meeting, K. Czuba
Overall Schedule On following slides there are no milestones related directly to Teststand (Task 7). Need separate discussion. , Łódź ESS PEG Progress Meeting, K. Czuba

3 ESS PEG Progress Meeting, K. Czuba
Milestones 1-21 # MS Short description Planned / Baseline date Location Responsible Status/Comments 1 Kick-off meeting WUT Partner 2 Progress meeting Every 3 months ALL Partner/ESS ERIC 3 Final System Architecture Specification ESS ERIC 4 LO RTM PDR (Preliminary Design Review) Closed by PDR in May 2017 5 Initial software from ESS ERIC for design verification 6 LO RTM first prototype finished Partner  Produced (CS-LOG) 7 Piezo Driver PDR (Preliminary Design Review) 8 Piezo Driver first prototype finished DMCS 9 RTM Carrier AMC PDR (Preliminary Design Review) 10 RTM Carrier AMC first prototype finished NCBJ Produced 11 Final Solution from ESS ERIC for design verification 12 Cabling and Installation planning for M-Beta finished Delayed – expected Q1-Q2 2019 13 Cabling and Installation planning for H-Beta finished 14 LO RTM M-Beta prototype Produced and tested. 15 LO RTM for M-Beta CDR (Critical Design Review) Done 16 Piezo Driver M-Beta prototype Produced ( ) and tested with H-Beta 17 Piezo Driver for M-Beta CDR 18 RTM Carrier AMC M-Beta prototype Produced 19 RTM Carrier AMC for M-Beta CDR 20 Cavity Simulator prototype and preliminary firmware Ready. All Units shipped. 21 Cavity Simulator final firmware and documentation , Łódź ESS PEG Progress Meeting, K. Czuba

4 ESS PEG Progress Meeting, K. Czuba
Milestones 21-38 # MS Short description Planned / Baseline date Location Responsible 22 First LLRF control unit delivery to ESS ERIC Lund ESS ERIC Partner 23 LLRF System SAR (System Acceptance Review) 24 Delivery of COST components for M-Beta to Partner Facility NCBJ 2019 25 Delivery of M-Beta units to ESS ERIC Lund We need new installation schedule 26 M-Beta units installation finished Linked to MS above 27 M-Beta SAT (Site Acceptance Test) 28 LO RTM H-Beta prototype WUT 29 LO RTM for H-Beta CDR (Critical Design Review) 30 Piezo Driver H-Beta prototype DMCS 31 Piezo Driver for H-Beta CDR (Critical Design Review) 32 RTM Carrier AMC H-Beta prototype 33 RTM Carrier AMC for H-Beta CDR (Critical Design Review) 34 Delivery of COST components for H-Beta to Partner Facility 35 44 H-Beta units delivered to ESS ERIC Lund 36 44 H-Beta units installation finished 37 H-Beta SAT (Site Acceptance Test) 38 Final Report Approved Review (SAR) and Final Report Approved , Łódź ESS PEG Progress Meeting, K. Czuba

5 ESS PEG Progress Meeting, K. Czuba
Milestones 39-56 # MS Short description Planned / Baseline date Location Responsible 39 Electron Pick-up CDR ESS ERIC Done 40 Delivery of Electron Pick-up Design from ESS ERIC Design changed 41 Delivery of 38 (RFQ and Spoke) Electron Pick-ups with test reports Partner Postponed to March 2019 42 Delivery of 36 (MB) Electron Pick-ups with test reports Probably will be delayed 43 Delivery of 44 (HB) Electron Pick-ups with test reports 44 Delivery of 36 Piezo Power Supplies 45 Delivery of 84 Piezo Power Supplies 46 RF Split Box CDR 47 Delivery of 87 RF Split Boxes (RFQ, MEBT, DTL, Spoke and MB) ) Delayed due to measurement problem and missing attenuator configuration from ESS. Investigations in progress 48 Delivery of 44 RF Split Boxes (HB) 49 PIN Diode CDR 50 Delivery of 81 PIN Diodes (RFQ, MEBT, DTL, Spoke and MB Delayed 51 Delivery of 44 PIN Diodes (HB) 52 Delivery of 81 PSS Switches (RFQ, MEBT, DTL, Spoke and MB) Production lauchd. Delivery expected Q1 2019 53 Delivery of 44 PSS Switches (HB) 54 Delivery of 120 Patch Panels Delayed. Possible Q2 2019 55 Initial Firmware/Software delivery for the RTM Carrier 56 Final Firmware/Software delivery for the RTM Carrier , Łódź ESS PEG Progress Meeting, K. Czuba

6 Action List from CDR Module Description Responsible Status Due date
Details 1 RTM carrier, LO RTM Finalise modifications PEG Done 2 All Review prototype availability and production volumes PEG/ESS Draft Quarterly meeting in Łódź Including Freia and other TS, see separate doc 3 Piezo RTM Confirm Fischer connector type ESS/AJJ Connector changed Fisher 103 4 Reconsider LED color coding Piezo actuator green LED 5 Confirm Pz controller cable lengths for M-Beta and H-Beta ESS Not ready End of Sept. 2018 Suggested meters. To be rechecked by ESS 6 Verify PSU cable length See rack layout 7 Clarify Spoke Pz stack up TBA mid. 2019? Not urgent 8 Share MB rack layout ESS/ASV Still needs some details 9 Use CHESS General recommendation 10a QA Add/update test&inspection plan to be done up to finishing of prototypes. October 16th Concerns also prototypes. Review it on Quarterly meeting in October 10b Add/update verification plan up to finishing of prototypes Review it on Quarterly meeting in October 10c Add/update FAT document , Łódź ESS PEG Quarterly Meeting, K. Czuba

7 Module Description Responsible Status Due date Details
11 CS Test LLRF system with cavity and provide data ESS In progress 2 months after teststand 2 ready with M-Beta cavity Needed for final CS design. Tests with H-Beta Cavity done in Freia 12 All Update risk register PEG/ESS Quarterly meeting in Łódź Current verson needs update. 13 Schedule replanning in August Latest during Quarterly meeting in Łódź 14a E-pickup LED's inconsistence with LPS status ESS/Bruno Done wk 35 14b Review component placement 15 PIN diode Verify how power outage will influence control signal in progress ?? 16 E-pickup & PIN Produce front panel layout for all combinations PEG Not ready Wait for modifications of the PIN diode Three different combinations 17 Provide configuration , Łódź ESS PEG Quarterly Meeting, K. Czuba

8 Make mechanical enclosure larger PEG/ESS Done Request by Morteza, PSS
Module Description Responsible Status Due date Details 18 PSS switch Make mechanical enclosure larger PEG/ESS Done Request by Morteza, PSS x31 SplitBox Change mechanics to have rear connectors optimized for rack layout PEG ESS to review new proposal. MG will send the design and prototype in September x32 Postpone delivery date (not time critical) Discuss during the QM To gain experience from TS2. PEG needs a list of attenuators. x33 PIN diode Switch diode outside spec at 352 MHz ESS/Bruno wk33 Perfomance is OK. Confirm with Bruno. x34 Production test at 24V-10% (21.6V) wk39 Update test specification. 3 pieces working at 17V. x35 Decide if separate variants for 352 and 704 MHz wk37 Seems that the same RF matching will be needed for both variants. x36 Patch panel Talk to ICS and LPS about card placement in MTCA Crate ESS/ASV In progress end of 2018 Test rack in preparation , Łódź ESS PEG Quarterly Meeting, K. Czuba

9 Thank you for your attention
, Łódź ESS PEG Progress Meeting, K. Czuba