Stave130 Assembly Jig (Tim). Current Tooling Components – CF jig + ‘C’-channel jig & various face-sheet positioning aids It works! – Seems to produce.

Slides:



Advertisements
Similar presentations
Geometry Chapter 1-1. Geometry Chapter 1-1 Why do chairs sometimes wobble? What do the feet of a three legged stool represent? Points that lie in the.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
Stave 130 Tooling John Carrol & Tim Jones. Status First generation stave assembly tool model modified to incorporate… – Stave Geometry Length 1277mm Width.
Restructure of WP4 – provisional ideas and numbers to promote discussion Ian Wilmut.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
K. Long, 14 June, 2015  Target K. Long, Friday, 24 th April 2009.
Stave # 1 Metrology Eric VIGEOLAS, WG2 July the 12th 2011.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ TILC08 – Tohoku University 3-6 March 2008 Sendai - Japan G. Wormser.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Hybrid Integrated Circuit
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
Raw Material & Sub-Assembly QA (Tim) 25/09/14 25/09/2014Material & Sub-assembly QA1.
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
March OsC Report and Restructuring WP4. OsC Report 4.1 Tapes Bus tape designs have been completed for modules with 130nm ASICs which incorporate options.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
WP4 – Plans for next 6 months
WP6 meeting 30/07/2013. Status of flex prototypes production New laser soldering tests Discussion on mass production schedule.
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
BNL Role In ITK 1.Current R&D Roles 2.Proposed Production Role 3.Activities now until TDR (early 2017) 4.Resources and Infrastructure 5.Personnel 1 D.
Fred Doherty Module Work Fred Doherty. Stave Module Building Hybrid Bonding Bonding table for the BJ820 still in workshop Modified working height of the.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
© Vibro-Meter Confidential and subject to Export Control as per Front PageGEnx EMU DDR 18 November 2008Section 2.2 Flexes Slide 1 EXPORT CONTROL THE INFORMATION.
Tilt angles reloaded, and status of some other things.
Plank #7 and beyond. 2 What was new for plank#7? Carbon-fibre jig Oversize (by 10mm) facesheets during stave core build –Facesheets now at the very limit.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
M. Gilchriese Pixel Update October 3, M. Gilchriese 2 Outline Barrel status and repair strategy Revised ATLAS installation schedule Finishing pixel.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
PASI OsC meeting 12th July 2012
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
Task 4.2 Stave Core Assembly (Tim). Task 4.2 Outline Year 1: Design and construction of staves and stavelets suitable for 130nm ASICs which will be used.
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
While I’m away…. 2 I hope not this… 3 And not too much of this…
Commercial Production Methods: Job production; understand that this involves producing ‘one off’ products. Every item produced is different. It is labour.
Stave production.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
SLHC Stave Wire-bonding Clearances (Tim) WP4 Glasgow (13 th June 2011)
1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Stave Tooling & Plans for Future Stave-building (Tim)
3-1 Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter # 2 Financial Planning.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.
Prototype Review 04-Sept Different side-closeout to allow petal end-insertion concept…self- guided… Only backup from last review in July…
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
Tools. Corded Power Drill These are used to drill larger holes or holes in more substantial materials. You would use this type of drill to drill metal.
ATLAS Internal ID Service Integration
new straw end plug: D=10.6 mm straws support frame Levan option
Update on module mounting on staves and stavelets 15/3/11
Are there better ways to build a stave?
Mechanics: (Tim).
Open Issues Modification of Cactus Arm bending tool required
WP4 – Plans for next 6 months
Reminder of Stave250 Tooling Design
· 't-· 't.J..J. I,; ·.. \ :"'" '.
Presentation transcript:

Stave130 Assembly Jig (Tim)

Current Tooling Components – CF jig + ‘C’-channel jig & various face-sheet positioning aids It works! – Seems to produce nice flat staves What needs to change? – Geometry: 13 modules, width, thickness Are there any cosmetic/functional improvements? – One of the steel feet fell off! – Segment the vacuum channels? – Large number of internal ‘inserts’ of several different types – Think about materials for long-term use

New Jig(s) Expect to be manufacturing 130nm stave cores by the end of – Procedures probably same as previously so ‘new’ jig should be capable of manufacturing staves more-or-less immediately Proposed programme – Review design of CF jig and ‘C’-channel jig Identify components (eg inserts, edge close-outs, facesheets?) which could remain the same (i.e. drawings exist) and manufacture could start now. Identify components needing design revision & what input is needed to do so; – Eg ‘C’-channel jig needs stave width, ‘C’-channel jig fixes hole positions in CF jig. – Suggest ‘mini-review’ at Oxford sometime late June/early July to discuss Jig requirements. TJJ, JLC, GV, SY + (IW…. ?) – Jig Schedule Parts manufacture from now to end August Stave Jig assembly from September (last one took 3 months – expect this one to be quicker!) Assembly trials from mid-October