1 Hybrid Integrated Circuit
Outer Barrel Hybrid Integrated Circuit Cosimo Pastore, ITS-MFT mini-week, 12 March 2014

2 Cosimo Pastore, ITS-MFT mini-week, 12 March 2014
OUTLINE OB Module assembly Ongoing activities tools for: - modules pre-alignment and shipping - laser soldering test with 1 and 14 chips - pALPIDE_fs chip Summary Cosimo Pastore, ITS-MFT mini-week, 12 March 2014

3 Cosimo Pastore, ITS-MFT mini-week, 12 March 2014
OB Module assembly: material Dummy chip 6 modules have been produced - 1 with carbon plate - 5 without carbon plate 50 µm thick size 15 mm x 30 mm Dummy FPC designed as in TDR1 to accommodate 7 x 2 chips holes metalized no coverlay at the bottom produced by Nuova Eurotar FPC layer stack up Cover-sheet 25 µm Copper 50 µm Kapton µm First version of FPC 210,6 mm 30,1 mm Cosimo Pastore, ITS-MFT mini-week, 12 March 2014 3

4 Cosimo Pastore, ITS-MFT mini-week, 12 March 2014
OB Module assembly 1 3 C A B 4 2-5 A B A Cosimo Pastore, ITS-MFT mini-week, 12 March 2014 4

5 OB Module assembly Accuracy of chips x,y position: < 8 um (average)
Modules without carbon plate Front view Chip: 15 mm x 30 mm 300 um thick Back view 2 modules already shipped to Cagliari Modules with carbon plate Front view Carbon plate K13D2U 75gsm (≈ 40µ) Thickness 0,11-0,12mm Weight 1,22g Back view Cosimo Pastore, ITS-MFT mini-week, 12 March 2014 5

6 OB Module assembly Weight 4,4 g
Production of 10 dummy modules (without carbon plate) for development of the stave assembly procedure is on going as scheduled: 4 modules already shipped to Torino 6 modules completed by the end of March: 64 dummy chips needed Time manufacturing: 2 hours + curing time Tools developed and assembly procedures: accuracy of chips x,y position < 5 um (average) Weight 4,4 g the pick up tool must be used for all modules handling operations Cosimo Pastore, ITS-MFT mini-week, 12 March 2014

7 Ongoing activities: tools for modules prealignment and shipping
2 by Silvia Alignment station 1 Module box foam dummy module Next 6 modules will be shipped by end of March Pins for module pre alignment references holes for Module box 3 4 Half stave modules Conductive carrying case for shipping half stave modules 1 2 3 4 5 6 7 Cosimo Pastore, ITS-MFT mini-week, 12 March 2014

8 Cosimo Pastore, ITS-MFT mini-week, 12 March 2014
Ongoing activities: tools for laser soldering test Preparation of two single chip assemblies with glue and adhesive tape in order to define the procedure for a fully equipped dummy modules to solder at CERN 1 Daisy chain FPC in copper 2 Macor grid Mechanical screws for chip-fpc alignment Ball pick up tool Vacuum tool 3 4 Quartz window Cosimo Pastore, ITS-MFT mini-week, 12 March 2014

9 Cosimo Pastore, ITS-MFT mini-week, 12 March 2014
Ongoing activities: tools for HIC laser soldering test The pre-fixed module is then placed on the tool for the laser soldering interconnections 1 Reference pins 2 3 4 Cosimo Pastore, ITS-MFT mini-week, 12 March 2014

10 Ongoing activities: production of the new FPC
FPC elaborated on the layout design for the IB module 220,4 mm 30,1 mm M. Sacchetti FPC layer stack up Cover-sheet 25 µm Copper 50 µm Kapton µm The production of the dummy FPCs for 14 chips was commissioned to Nuova Eurotar company. Cosimo Pastore, ITS-MFT mini-week, 12 March 2014

11 ball pick up tool for pALPIDE_fs chip
Ongoing activities: ball pick up tool for pALPIDE_fs chip Third ball pick up tool designed Cosimo Pastore, ITS-MFT mini-week, 12 March 2014

12 Cosimo Pastore, ITS-MFT mini-week, 12 March 2014
SUMMARY 6 modules have been produced: 2 to develop the jig to pick up the module and 4 for development of the stave assembly procedure. Next step is to produce 6 modules by the end of March. The modules prealigned will be shipped to Torino by mean an ad hoc tool which will be ready by the end of March. As soon as possible the solder test with 1 chip will be done. The production of the dummy FPCs for 14 chips was commissioned to Nuova Eurotar company. The ball pick up tool for the pALPIDE chip will be ready by the end of March. Cosimo Pastore, ITS-MFT mini-week, 12 March 2014

13 Back slide

14

15 Metalized hole diameter i = 1,…,7
X Y i2 i3 Nominal Measured X 210,6 210,6030 Y 30,1 30,1270 L 180,6 180,6744 Distance (i) i = 1,…,6 30,1167 30,1131 30,1155 30,1069 30,1079 30,1145 Metalized hole diameter i = 1,…,7 0,21 0,2629 0,2659 0,2673 0,2661 0,2634 0,2646 0,2632 Measures in mm CHIP 8 CHIP 1 CHIP 2 i1 CHIP 1 CHIP 2 i1 15

16 Module assembly procedure
Gluing procedure to fix the FPC on the chips 8 Adhesive mask 9 10 11

17 Module assembly procedure
FPC FPC 150 µm thick Chip 50 µm thick Carbon plate 120 µm thick Glue: Ecobond 40 µm thick Modules without carbon plate Modules with carbon plate Does the module plate help for handling and testing?