09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.

Slides:



Advertisements
Similar presentations
Update on GEM Activities for the 12 GeV Program in Hall A at JLab
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
INFN GEM Front Tracker 2012 Oct 18 / SBS Coll. / JLabE. Cisbani1 V. Bellini, M. Capogni, E. Cisbani, S. Colilli, F. Giuliani, M. Gricia, F. Librizzi, M.
1 GEM Tracker for high luminosity experiments at JLab Hall A Evaristo Cisbani (8), V. Bellini (5), M. Capogni (2), S. Colilli (8), R. De Leo (4), R. De.
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2013 – Feb – 20 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
SBS Coll. Meeting - Front Tracker GEM
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
1 Tracking system based on GEM chambers Evaristo Cisbani Italian National Institute of Health and INFN Rome – Sanità Group PAVI – 09 / September.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
A Readout Electronics for MAPMT Matteo Turisini – E. Cisbani Italian National Institute of Health – INFN Rome 1 JLab/CLAS12 RICH Meeting - 16/Nov/2011.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
JLab 22/Jan/2010 SBS - Review E. Cisbani / SBS Trackers 1 Concepts and Status of the GEM trackers Evaristo Cisbani / INFN-Rome Sanità Group SBS - Review.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
Kondo GNANVO University of Virginia (UVa) Update on GEM Activities for the 12 GeV Program in Hall A at JLab.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
News on GEM Readout with the SRS, DATE & AMORE
Front GEM Chambers Design concepts –Foils –Mechanics Electronics and DAQ Performance Current activity and plan Evaristo Cisbani / INFN-Rome Sanità group.
APV25 Electronics for GEMs at UVa and for the 12 GeV Upgrade Program in HallA at JLab RD51 Electronic School, February 3-5, 2014 Kondo Gnanvo University.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Calibration of the gain and measurement of the noise for the apv25 electronics K. Gnanvo, N. Liyanage, C.Gu, K. Saenboonruang From INFN Italy: E. Cisbani,
Florida Institute of Technology, Melbourne, FL
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
MPD HW & firmware status UVa Back Tracker parts status SBS JLAB 1 16 December 2015 Paolo Musico and Evaristo Cisbani GEM Readout Update.
1 (Gerard Visser – STAR Integration Meeting 5/16/2008) STAR Forward GEM Tracker Readout/DAQ Integration G. Visser Indiana University Cyclotron Facility.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
LECC2003: The 96 Chann FED Tester: Greg Iles30 September The 96 channel FED Tester Outline: (1) Background (2) Requirements of the FED Tester (3)
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
L. Benussi On Behalf of LNF crew
Electronics for GEM R&D at the University of Virginia
PRAD DAQ System Overview
FCAL R&D towards a prototype of very compact calorimeter
Calorimeter Mu2e Development electronics Front-end Review
Large CMS GEM with APV & SRS electronics
Status of the Front Tracker GEM
Front-end electronic system for large area photomultipliers readout
Example of DAQ Trigger issues for the SoLID experiment
Concepts and Status of the GEM trackers
The CMS Tracking Readout and Front End Driver Testing
SALTRO16 activities in Lund
The LHCb Front-end Electronics System Status and Future Development
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Presentation transcript:

09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo Cisbani - INFN/Rome & Italian National Institute of Health On behalf of: Paolo Musico, Saverio Minutoli, Giuseppe Gariano - INFN/GE Bari 09/October/10 WG5-RD51 Collaboration Meeting

SBS Spectrometer in Hall A SiD Large luminosity Moderate acceptance Forward angles Reconfigurable detectors Large luminosity Moderate acceptance Forward angles Reconfigurable detectors 09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 2 Electronics for: Small silicon detector (SiD) Front GEM tracker Large backward GEM trackers  >100k channels Use VME64x

Readout Foil 09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 3 No soldering, very thin connections Laser cutting required

09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 4 Electronics Components GEM  FEC  ADC+VME Controller  DAQ Main features: Use analog readout APV25 chips 2 active components: Front-End card and VME64x custom module Copper cables between front-end and VME 2D Readout 75 mm 49.5 mm 8 mm Up to 10m twisted, shielded copper cable

09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 5 Front End Card (Proto 1) GEM  FEC  ADC+VME Controller  DAQ Analog Output Input Protection diodes Panasonic FPC connectors Analog driver (not used) Voltage rogulators Thermometer 2 In/Out options APV25 bonding on PCB Digital Input + Power supply Analog out + Digital Input + Power supply APV25

VME64x Controller (Proto 0)  VME controller hosts the digitization of the analog signals coming from the front- end card.  It handles all control signals required by the front end cards (up to 16 FE)  Compliant to the JLab/12 VME64x VITA 41 (VXS) standard  We intend to make it accessible by standard VME/32 as well  Version 1 submitted for production:  Minor bug fixed  2 HDMI-type A: digital lines + 2 analog lines (compatible with SRS hybrids connector)  2 HDMI-type B: 16 analog lines  Added delay line for clock-convert phase fine tuning (DELAY25 from CERN) Digital OUT 16 Analog IN Analog Receivers ADCs 50 MHz 12 bits USB ETH Optical Fiber 2x64Mbyte SDRAM Live Insertion Hot-Swap Oscillators (100 MHz, 62.5 MHz) Flash EPROM Thermometer Voltage Regulators 09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 6

GEM Electronics Layout 09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 7 1.Use high density, high quality, standard HDMI (A-type for digital signals, B-type for analogo output) 2.Analog and digital lines rus independently 3.Analog and Digital patch panels collect and reroute channels 4.Similar solution for the SiD planes Front Tracker Geometry VME  Patch Panel  Backplane  Front End Cards

09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 8 Electronics layout on one chamber Cards and modules are supported by an outer carbon-fiber frame which runs all around the chamber. Front-end cards are electromagnetically shielded by backplane and carbon-fiber (with thin conductive tape) Power dissipation to be verified

Beam DESY (EUDET support) 09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 9 2xGEM 10x10 cm2 chamber 2D readout (a la COMPASS) 4 front-end cards (proto 0) Low intensity electron beam 2-6 GeV/c

Test Beam / Evidence of the beam 09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 10  No BEAM  BEAM Relevant noise, partially suppressed by common mode (offline) subtraction Large pedestal fluctuation Xy

Signal vs Cable length 09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 11  Long cables seems to work well: no distorsion, noise slighlty increase, amplitude attenuation as expected Capacitance coupling to be optimized (in final size chamber) APV25 parameters to be tuned! Test signalPedestals 3 m 10 m 13 m

To do list Hardware –Improve noise (capacitor tuning, grounding ?) –Test new prototype version of the VME module Firmware –Continue bug fixing –Improve event builder (consistency data check) –Use of external RAM memory –Mean/Median evaluation and common mode subtraction on FPGA –Zero suppression 09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 12

09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 13 Conclusions Front-end card: –Second prototype tested –Can be considered final version VME-controller: –Bug fixed –Most of the basic firmware implemented –New version under production Working on noise Expect to operate the new prototype in first 40x50cm2 GEM in November; do beam test end of November