INDONESIA NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAMME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION Dr. A. Sarwiyana Sastratenaya Director, Center for.

Slides:



Advertisements
Similar presentations
IAEA International Atomic Energy Agency Nuclear Energy Series Lumir Nachmilner Waste Technology Section, Member of the Document Coordination Team Presented.
Advertisements

UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Infrastructure Development TM/WS Infrastructure Development 9-12 February 2010 Breakout session – Group 2.
Nuclear Infrastructure Development Evaluation: Perspectives from the United States Dr. Marc A. Humphrey Office of Nuclear Energy, Safety and Security U.S.
EGYPT NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION “General Information on the Status of the Egyptian Nuclear.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
St Petersburg ATOMEXPO-2013 The IAEA recommendations for training of contractor personnel.
Nuclear program of Lithuania Dr. Vidas Paulikas, Radiation Protection Department VATESI Visaginas, 29 June 2009.
Nuclear Training & Education Center
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
Establishment and Development of the Internal Audit System for the Public Sector in Kyrgyz Republic INTERNAL AUDIT COMMUNITY OF PRACTICE ISTANBUL
Thailand NUCLEAR POWER PROGRAM INFRASTRUCTURE AND STATUS OF IMPLEMENTATION: Regulatory Body Prof. Dr. Chaivat TOSKULKAO Secretary General Office of Atoms.
IAEA International Atomic Energy Agency Overview of legal framework Regional Workshop - School for Drafting Regulations 3-14 November 2014 Abdelmadjid.
NEXT Lessons Learned from Integrated Regulatory Review Service (IRRS) 22 nd and 23 rd January 2014, Brussels Fernando Franco, Spanish Nuclear.
LEGAL FRAMEWORK & REGULATORY SYSTEM f or introduction of NPP into Vietnam Le Chi Dung (VARANS, Vietnam) Vienna, December 2008.
Tom MAZOUR IAEA, Division of Nuclear Power
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
IAEA International Atomic Energy Agency Nuclear Energy Programme Implementing Organization (NEPIO) Anne Starz Nuclear Power Engineering.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
GROUP 3:Bangladesh, Croatia, Egypt, Jordan, Montenegro, Namibia, Senegal, Syria, Vietnam and Yemen Moderator: Dr. I. Rotaru, IAEA consultant Reporter:
Ministry of Economy, Trade and Industry Experience and Future Activities for Introduction of Nuclear Power Masaomi KOYAMA Deputy Director Nuclear Energy.
International Atomic Energy Agency IAEA Nuclear Knowledge Management Programme Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumentation.
IAEA International Atomic Energy Agency. IAEA Outline USNRC IRRS Training - Preparations of Reviewers2 Learning Objectives To start with Advance Reference.
IAEA International Atomic Energy Agency Akira OMOTO Director, Division of Nuclear Power Nuclear Power Infrastructure Development how to.
INDONESIA NUCLEAR REGULATORY PROFILE CONTENT FOR NNRP Bintoro Aji Nuclear Energy Regulatory Agency (BAPETEN) Indonesia BADAN PENGAWAS TENAGA NUKLIR Workshop.
1 THE INTRODUCTION OF THE FIRST NPP IN TUNISIA PROJECT STATUS Jomaâ Souissi Souad Baccouche Société Tunisienne d’Electricité et du Gaz Centre National.
TM/WS 9-12 February GROUP 3: Bangladesh, Croatia, Egypt, Jordan, Montenegro, Namibia, Senegal, Syria, Vietnam and Yemen Moderator: Dr. I. Rotaru,
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Thailand’s Preparation for Starting a Nuclear Power Program Mr. Pricha Karasuddhi Technical Advisor Nuclear Power Program Development Office(NPPDO) Ministry.
Milestones or Millstones Alex R. Burkart, Deputy Director Office of Nuclear Energy, Safety and Security United States Department of State.
Algerian nuclear power programme Status, needs and perspectives T/M on development of nuclear infrastructure of NP programme February, ,Vienna.
IAEA International Atomic Energy Agency Nuclear Power Infrastructure Development Technical Meeting/Workshop on: TOPICAL ISSUES ON INFRASTRUCTURE DEVELOPMENT:
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency Directions for Strengthening the Agency's Assistance to Countries Considering or Introducing Nuclear Power Technical.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
International Atomic Energy Agency Irina Sanda Education and Training in the Area of Safety Assessment Irina Sanda Safety Assessment Section Division of.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
23 January 2016 Gustavo C ARUSO Head, Regulatory Activities Section Division of Nuclear Installations Safety Department of Nuclear Safety and Security.
Current Status of the National Nuclear Infrastructure and Human Resources Development in the Republic of Belarus TM/WS on Topical Issues on Infrastructure.
TM/WSP 5-9 Nov Group D2- Nuclear fuel cycle, nuclear Waste - QUESTIONS / DIFFICULTIES 1. Is it reasonable for a country to build a fuel fabrication.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
IAEA International Atomic Energy Agency TM/WS TOPICAL ISSUES ON INFRASTRUCTURE DEVELOPMENT: MANAGING THE DEVELOPMENT OF NATIONAL INFRASTRUCTURE FOR NUCLEAR.
IAEA International Atomic Energy Agency Arusha, Tanzania Uganda Dr. Akisophel Kisolo Project Counterpart 2 – 5 December 2013 RAF9038 Final Coordination.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
IAEA International Atomic Energy Agency Milestones in Development of a National Infrastructure for Nuclear Power Infrastructure Issue: Management C.R.
Director, Environmental Assessment & Control Directorate
Egyptian Nuclear and Radiological Regulatory Authority (ENRRA)
János Krutzler Hungarian Atomic Energy Authority
SESSION 3 Policy Framework
AAEA Role in Improving EPR Coordination Interventions among Arab Countries Abdelmajid Mahjoub Arab Atomic Energy Agency
Radiation & Nuclear Safety and Security Aspects in Lao PDR
Nuclear and Treaty Law Section Office of Legal Affairs
ETPRES MISSION Conducted: in Jakarta, June 2012
Poland - Perspective and current status of introducing nuclear power
مستلزمات بناء المحطات النووية ضو مصباح الهيئة العربية للطاقة الذرية
Communication and Consultation with Interested Parties by the RB
RCF Plenary Session 21 September 2018
Regulatory Cooperation Forum (RCF) - Plenary 2018
Director, Environmental Assessment & Control Directorate
Education and Training in the Area of Safety Assessment Irina Sanda
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
THE INTRODUCTION OF NUCLEAR POWER IN EGYPT AN OVERVIEW
بسم الله الرحمن الرحيم Dr. Hany Sallam & Regulatory Activities
Nuclear Energy Programme Implementing Organisation
NUCLEAR REGULATORY PROFILE BADAN PENGAWAS TENAGA NUKLIR
Regulatory system in Hungary
IAEA - Department of Nuclear Safety & Security
Presentation transcript:

INDONESIA NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAMME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION Dr. A. Sarwiyana Sastratenaya Director, Center for Nuclear Energy Development, BATAN International Atomic Energy Agency TM/WS on Topical Issues on Infrastructure Development: Managing the Development of a National Infrastructure for Nuclear Power February 9-10, 2010, Vienna

General information  An archipelago with 17,508 islands  1.9 million square miles total  Fourth most populous country in the world, 223 million people (2006), 1.49% growth rate  59% of population reside in Java, in a 7% total area  400 volcanoes, 100 active, 112 in Java island  Air temperature : 27.6° to 36.8° C (day) and 14.6° to 24.6° C (night)  Humidity: 63% to 83%

Map of Indonesia

1. NATIONAL REASONS FOR NPP INTRODUCTION Indonesia has several decades of history of activities towards the peaceful use of nuclear energy including planning for power generation. A comprehensive assessment of different energy sources has been done in This study was done through IAEA TC program: MAED, WASP, MESSAGE NPP would be economically and technically feasible in Presidential Regulation 5 Year 2006 on National Energy Policy notes that nuclear energy will be a part of national energy mix. The share is expected to be 4 % of the total primary energy in Act No. 17 Year 2007 on the long-term national development plan notifies that NPP maybe utilized in a period of

2. NATIONAL STRATEGY for NUCLEAR POWER INFRASTRUCTURE DEVELOPMENT Since NEPIO or the owner is not yet defined, the preparation of nuclear infrastructure is implemented through issue-specific inter-agency teams. The institution members of the teams are those directly related to on the objectives to be achieved, for example, institutions members of the team for human resources development are MEMR, BATAN, Bapeten, etc. The activities are implemented using budget of each involved institutions

3. SPECIFIC PLANS FOR NATIONAL STRATEGY IMPLEMENTATION (1) Nuclear infrastructure is being developed through many related institutions based on their tasks. Propose to establishing an inter-agency national team (Under the responsibility of MEMR).

3. SPECIFIC PLANS FOR NATIONAL STRATEGY IMPLEMENTATION (2) The planned function of this National Team is as follows: to provide a basis of national consensus on nuclear power by disseminating information on nuclear power generation, to prepare the basis for Government consultation with the Parliament regarding the decision to launch nuclear power plant programme, to formulate the organization and ownership structure of NPP, to prepare the licensing system for nuclear power plant construction and operation, to formulate the preparatory document needed for the nuclear power plant construction, to identify issues concerning to the technology transfer, and to report periodically to the President on the activities by the team.

3. SPECIFIC PLANS FOR NATIONAL STRATEGY IMPLEMENTATION (3) The proposed National Team is supposed to consist of three layers: a steering team (MEMR, Ministry of Finance, Ministry of Industry, Ministry of Environmental, Ministry of National Development Planning, Ministry of Research and Technology, Ministry of External Affairs, State Ministry of State Owned Company, BATAN & BAPETEN), an executing team (Directorate General of Electricity and Energy Utilization, BATAN & MEMR), and working groups to assist the executing team.

3. SPECIFIC PLANS FOR NATIONAL STRATEGY IMPLEMENTATION (4) The working groups include: Working group for socialization and dissemination of nuclear energy utilization for nuclear power generation. Working group for formulating the organization, ownership structure and licensing system for NPP. Working group for formulating basic principle of user requirement of NPP. Working group for formulating the technology transfer.

4. STATUS OF NATIONAL NUCLEAR POWER INFRASTRUCTURE DEVELOPMENT (1) BATAN requested the IAEA to perform an Integrated Nuclear Infrastructure Review Mission (INIR) under the framework of TC programme (INS/4/037) in a letter dated on 5 August An INIR mission provides an external peer reviews conducted by the IAEA in November 23 – 27, 2009 The mission utilized the following techniques: a) Study of documents, performed in two stages (i) prior to the mission, as part of preparation and (ii) during the mission. The documents include: Self-Assessment Report, 2009 October; Indonesian strategy documents for peaceful utilization of atomic energy; Atomic Energy Law and related decrees and regulations; Formulation of sustainable energy development strategies under framework of climate change, IAEA/RCA Project (RAS/0/045), BATAN, 2008

4. STATUS OF NATIONAL NUCLEAR POWER INFRASTRUCTURE DEVELOPMENT (2) b) Interviews to gather information through discussions with representatives of the counterpart organizations. Guidelines to conduct the mission were based on the following IAEA-related publications: Considerations to launch a nuclear power program IAEA GOV/INF/2007/2/ Milestones in the Development of a National Infrastructure for Nuclear Power IAEA Nuclear Energy Series No. NG-G-3.1(2007) Evaluation of the status of national infrastructure development, IAEA Nuclear Energy Series No. NG-T-3.2 Responsibilities and Competencies of a Nuclear Energy Program Implementing Organization (NEPIO) for a National Nuclear Power Program, NE Series NG-T-3.1 Other publications as appropriate from the bibliography included in Milestones (NES No. NG-G-3.1) noted above. INIR, Integrated Nuclear Infrastructure review Mission – Guidance on preparing and conducting INIR Missions. IAEA working material.

4. STATUS OF NATIONAL NUCLEAR POWER INFRASTRUCTURE DEVELOPMENT (3) Conclusion from INIR mission INIR mission shows that Indonesia has done extensive preparatory work on most infrastructure issues that would allow the country to make decision to further consider introduction of nuclear power, i.e. to go from phase 1 to phase 2 in Milestone methodology. It can be suggested that some issues mainly connected to the responsibilities of the owner/operator of the nuclear power plant, still will require further work, most of which can be performed in parallel during phase 2.

No. INFRASTRUCTURE ISSUES PHASE 1, STATUS 1. National position 2. Nuclear Safety 3.Management 4. Funding and Financing 5. Legislative Framework 6.Safeguards 7. Regulatory Framework 8. Radiation protection 9. Electrical Grid 10. Human resources 11. Stakeholder involvement 12. Site and supporting facilities 13. Environmental protection 14. Emergency planning 15.Security 16. Nuclear fuel cycle 17. Radioactive waste 18. Industrial Involvement 19.Procurement 4. Status of nuclear infrastructure development (4)

5. LESSONS LEARNED Nuclear infrastructure development needs many efforts involving stakeholders, therefore existence of a NEPIO or an organization of coordinative function is very much needed. Technical cooperation from the IAEA provides great help for new-comers in preparing an introduction of NPP INIR mission is very beneficial for peer-reviewing nuclear infrastructure development status. Indonesia needs further assistance from the IAEA for the next phases.

6. CONCLUSION Indonesia has several decades of history of activities towards the peaceful use of nuclear energy including planning for power generation. the preparation of nuclear infrastructure is implemented through issue-specific inter-agency teams. Indonesia has done extensive preparatory work on most infrastructure issues that would allow us to make decision to further consider introduction of nuclear power, i.e. to go from phase 1 to phase 2 in Milestone methodology.

Thank you for your attention Thank you for your attention