STS Readout chain – Revisited Readout-ASIC to ROC Interconnect Walter F.J. Müller, GSI, Darmstadt CBM Collaboration Meeting 13 th April 2010.

Slides:



Advertisements
Similar presentations
DAQ/FLES Summary Walter F.J. Müller, GSI, Darmstadt CBM Collaboration Meeting 16 April 2010.
Advertisements

E-link IP for FE ASICs VFAT3/GdSP ASIC design meeting 19/07/2011.
ESODAC Study for a new ESO Detector Array Controller.
LHCb Upgrade Overview ALICE, ATLAS, CMS & LHCb joint workshop on DAQ Château de Bossey 13 March 2013 Beat Jost / Cern.
FEE/DAQ Demonstrator Walter F.J. Müller, GSI, Darmstadt for the CBM Collaboration 3 rd FutureDAQ Workshop GSI, Darmstadt, October 11, 2005.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
COE 341: Data & Computer Communications (T062) Dr. Marwan Abu-Amara
COE 342: Data & Computer Communications (T042) Dr. Marwan Abu-Amara Chapter 8: Multiplexing.
COE 341: Data & Computer Communications (T061) Dr. Marwan Abu-Amara Chapter 8: Multiplexing.
GEM Design Plans Jason Gilmore TAMU Workshop 1 Oct
PCIe based readout U. Marconi, INFN Bologna CERN, May 2013.
1 MUON UPGRADE: ME0 GMM All engineering drawings from Sasha Surkhov PRELIMINARY !!
FF-LYNX R. Castaldi, G. Magazzù, P. G. Verdini INFN – Sezione di Pisa G. Bianchi, L. Fanucci, S. Saponara, C. Tongiani Dipartimento di Ingegneria della.
K. Honscheid RT-2003 The BTeV Data Acquisition System RT-2003 May 22, 2002 Klaus Honscheid, OSU  The BTeV Challenge  The Project  Readout and Controls.
Readout of DC coupled double sided sensors with CBMXYTER: Some first thoughts Peter Fischer, Heidelberg University.
24/03/2011P.-A. Loizeau – Univ. Heidelberg The CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni Heidelberg DPG 2011, Münster.
Huazhong Normal University (CCNU) Dong Wang.  Introduction to the Scalable Readout System  MRPC Readout Specification  Application of the SRS to CMB-MRPC.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
Frank Lemke Design concepts and measurements of the CBM DAQ network DPG – Frühjahrstagung Dresden 2013 HK 10.7 University of Heidelberg Computer Architecture.
VELO upgrade Front-end ECS LHCb upgrade electronics meeting 12 April 2012 Martin van Beuzekom on behalf of the VELO upgrade group Some thoughts, nothing.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
University of Calcutta CBM 1 ROC Design Issues Dr. Amlan Chakrabarti, Dr. Sanatan Chattopadhyay & Mr. Suman Sau.
Understanding Data Acquisition System for N- XYTER.
Proposal: 2.5 Gbps Radiation Tolerant Serializer Design for the CBM–DAQ in 180 nm CMOS process Pradeep Banerjee, Dr. T. K. Bhattacharyya, E & ECE Dept.,
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
Proposal: Design of a 2.5 Gbps Radiation Tolerant SerDes for the CBM–DAQ in 180 nm CMOS process Pradeep Banerjee, Dr. T. K. Bhattacharyya, E & ECE Dept.,
FF-LYNX (*): Fast and Flexible protocols and interfaces for data transmission and distribution of clock, trigger and control signals (*) project funded.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Network Architecture for the LHCb DAQ Upgrade Guoming Liu CERN, Switzerland Upgrade DAQ Miniworkshop May 27, 2013.
Frank Lemke DPG Frühjahrstagung 2010 Time synchronization and measurements of a hierarchical DAQ network DPG Conference Bonn 2010 Session: HK 70.3 University.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Data Acquisition Backbone Core J. Adamczewski-Musch, N. Kurz, S. Linev GSI, Experiment Electronics, Data processing group.
Front-end readout study for SuperKEKB IGARASHI Youichi.
Summary DAQ Walter F.J. Müller, GSI, Darmstadt 12 th CBM Collaboration Meeting 17 October 2008.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
LHCb front-end electronics and its interface to the DAQ.
The GBT, a Proposed Architecture for Multi-Gb/s Data Transmission in High Energy Physics P. Moreira CERN – Geneva, Switzerland Topic Workshop on Electronics.
Active Buffer Status in CBM DAQ W. Gao, A. Kugel, R. Männer, G. Marcus, M. Stapelberg, A. Wurz 06 Oct th CBM Collaboration Meeting Split.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
A Super-TFC for a Super-LHCb (II) 1. S-TFC on xTCA – Mapping TFC on Marseille hardware 2. ECS+TFC relay in FE Interface 3. Protocol and commands for FE/BE.
Throttling – Revisited Walter F.J. Müller, GSI, Darmstadt CBM Collaboration Meeting 13 th April 2010.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
High Speed Digital Systems Lab Spring/Winter 2010 Project definition Instructor: Rolf Hilgendorf Students: Elad Mor, Ilya Zavolsky Integration of an A/D.
Firmware Overview and Status Erno DAVID Wigner Research Center for Physics (HU) 26 January, 2016.
Status of Integration of Busy Box and D-RORC Csaba Soós ALICE week 3 July 2007.
CLAS12 Central Detector Meeting, Saclay, 3 Dec MVT Read-Out Architecture & MVT / SVT Integration Issues Irakli MANDJAVIDZE.
1 Status report on the LAr optical link 1.Introduction and a short review. 2.The ASIC development. 3.Optical interface. 4.Conclusions and thoughts Jingbo.
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
CMX: Update on status and planning Yuri Ermoline, Wojciech Dan Edmunds, Philippe Laurens, Chip Michigan State University 7-Mar-2012.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
2 March 2012Mauro Citterio - SVT Phone meeting1 Peripheral Electronics Some updates Mauro Citterio INFN Milano.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Current STS Readout Concept 1 FEB 8 STS-XYTER Electrical Interface SLVS/LVDS pairs/FEB ROB GBTx / VL Optical Interface 4 MM fibers /ROB DPB.
CBM DAQ Overview Walter F.J. Müller, FAIR, Darmstadt Joint CBM / Panda DAQ Workshop February 2015.
“FPGA shore station demonstrator for KM3NeT”
PRAD DAQ System Overview
Control of ASICs via GBTx
UT Optical Connections
VELO readout On detector electronics Off detector electronics to DAQ
The digital read-out for the CSC system of the TOTEM experiment at LHC
SVT detector electronics
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
The digital read-out for the CSC system of the TOTEM experiment at LHC
Pierre-Alain Loizeau and David Emschermann for the CBM collaboration
SVT detector electronics
Presentation transcript:

STS Readout chain – Revisited Readout-ASIC to ROC Interconnect Walter F.J. Müller, GSI, Darmstadt CBM Collaboration Meeting 13 th April 2010

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 2 Slides from FEE/DAQWorkshop

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 3 The CBM Generic Read-out Chain Detector Front-End Board Read-Out Controller Active Buffer Board FEBROC ABB Data Combiner Board DCB First Level Event Selector FLES TNet Data Control Data & Control Sync Data Digitization Custom ASIC FEE  DAQ Interface Local Pre- Processing Buffering System Synchronization DAQ  FLES Interface FPGA Coprocessor Event Selection CPU Farm DAQDetector Sub-SystemFLES

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 4 Options for CBM FLES Location CBM Service Building ~350m linear dist. Distance is preliminary!! 'Green Cube'

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 5 STS Hit Rates per 128 Channel Chip Hit rate [MHz] Sta 0 Sta 1 Sta 2 Sta 3 Sta 4 Sta 5 Sta 6 Sta 7 Total Total Very few chip in inner region have hit rate > 32 MHz >90% of chips have hit rates in MHz range Hit rate per chip Statistics 25 AGev 10 7 evt/sec

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 6 STS FEB Data Aggregation Cases FEBa8 FEBa4 FEBa2 FEBa1 2.5 Gbps serial link for FEB  ROC connect local chip  chip data interconnect

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 7 Proviso Proviso: link counts likely to go up to account for more background, overhead, head room, chips exceed 2.0 Gbps: 29 with ; 9 with # of FEBs and type distributions varies for stations # of links is quite similar for all stations STS FEB Type and Link Distribution FEB type Sta 0 Sta 1 Sta 2 Sta 3 Sta 4 Sta 5 Sta 6 Sta 7 tot FEBs tot links FEBa FEBa FEBa FEBa tot FEBs tot links FEB Type Statistics 25 AGev 10 7 evt/sec 40 bit message Allow 20% overhead/headroom

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 8 Where to do Opto Conversion ? Ansatz here:  keep FEB simple  FEB has Cu interfaces  do electrical-optical conversion in separate unit  this unit can act as a 'patch panel'  natural to work in bundles of 12 links... FEBa2 FEBa2 FEBa4 FEBa8 FEBa8 Cu patch cables 'active' patch panel Ribbon fiber cables

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 9 STS Quadrant 6 cm 5 cm STS-FEBs Likely not a good place for patch panels, faces the magnet coil directly Is this enough space for: copper links - 10 opto converters - 10 ribbon fiber cables plus other services like - power distribution - control & monitoring -,,,,,,, size of a post card

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 10 STS Interface Converter Board Proposal for STS interfacing  2m copper twinax x1, x2, x4 or x8  copper => optical on Postcard 12.7cm x 8.9cm  Conversion to optical signals with AOCs Does electrical and AOC connector fit on one Postcard ? Connector density analysis AOC connectors twinax connectors twinax connectors Passive Board Postcard miniHT connector Slide: U. Bruening

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 11 Proviso Proviso: link counts likely to go up to account for more background, overhead, head room,.... All STS data can be transported by ~280 ribbon cables Corresponds to 34 cm 2 cable cross section STS Link & Ribbon Cable Distribution Sta 0 Sta 1 Sta 2 Sta 3 Sta 4 Sta 5 Sta 6 Sta 7 total FEBs links cables/quadrant cables tot FEB&Cable Statistics 25 AGev 10 7 evt/sec 48 bit message

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 12 Proviso Proviso: link counts likely to go up to account for more background, overhead, head room,.... ROC/DCB STS Readout Chain in a Nutshell.... on/near Detector CBM Service Bldg. GSI/FAIR IT Bldg. ~50m~500m FLES chips 1512 FEBs 3300 links 280 cables 410 GB/sec 280 ROCs 1320 links 330 GB/sec 2.5 Gbps 5 Gbps

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 13 Physical Location View FEBROC/DCS ABBDCB FLES TNet Data Control Data & Control Sync Data Control STS,.... CLOSY TOF,...? ROC ECS Cu optical on/near DetectorCBM Service Bldg.GSI/FAIR IT Bldg. Data ~50m~500m ?

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 14 Towards a System Concept

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 15 Loose Ends So far only hit data considered  there are also clock, sync, and control connections So far we tried to avoid a 'support chip'  some data aggregation is needed on detector  so far 'distributed solutions' discussed Alternatives:  consider a 'support chip' acting as 'communication hub'  look again into the CERN GBT approach

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 16 GBT – Revisited

13 April 2010CBM Collaboration Meeting -- Walter F.J. Müller, GSI 17 GBT to front-end link topology  GBT to Front-end links:  32 (+1) bi-directional serial links (e-links)  E-link bandwidth is 80 Mb/s  Several e-links can be grouped together to serve a single front-end device achieving bandwidths that are multiples of 80 Mb/s  16-bits for TTC  8 phase adjustable clocks  An E-Link Port Adaptor (EPA) “macro” will be available for integration in the front-end ASICs Slide from: TWEPP-07 presentation of Paulo Moreira (see this link) link Shown in CBM DAQ on 24 th Jan 2008

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 18 Slide from: TWEPP-09 presentation of Paulo Moreira (see this link) link

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 19 Slide from: TWEPP-09 presentation of Paulo Moreira (see this link) link

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 20 Slide from: TWEPP-09 presentation of Paulo Moreira (see this link) link

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 21 Slide from: TWEPP-09 presentation of Paulo Moreira (see this link) link

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 22 CBM Profile

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 23 Profile of a 'communication hub' I notin RX-TX pairs much more TX links Tuned for very high data bandwidth – downstream side  optical data link usage not in RX-TX pairs  go for much more TX links than RX links  TX speed as high as feasible (e.g. 2.5 Gbps w/ 180nm)  RX speed doesn't need to be the same  handle multiple optical links with one 'hub' Tune for very high data bandwidth – readout-ASIC side  a single readout ASIC can produce 2.5 Gbps  go for 'simple to implement' interface  plausible choice: LVDS at 250 or better 500 Mbps The 'hub' must be able to aggregate data from several readout-ASICs onto a single output link. The 'hub' must handle data, clock, sync, and control

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 24 Profile of a 'communication hub' II Ribbon cables with 12 fibers are widely used  standard opto converters are: 12TX, 12RX and 4TX-4RX  consider 12TX ribbon for data  consider 4RX – 4TX for clock, sync and control For a simple mapping of 'hub's to ribbons it is thus natural to consider 'hub's with  either 3, 6 or 12 TX for data  and 1RX-1TX for clock, sync and control

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 25 Profile of a 'communication hub' III some assumptions Now some assumptions on what a feasible 'hub' can be: Assume a 'hub' ASIC with 6 fast serializers  6 TX for data  1 RX – 1 TX for clock, sync and control   15 Gbps data bandwitdth  2 'hub's will share a data ribbon  4 'hub's will share a control ribbon Assume 250 MHz system clock  500 Mbps LVDS seems plausible for readout-ASIC interface   support 5-8 times as many LVDS links as TX channels

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 26 Readout ASIC Interface xyter 6 fast LVDS data links 500 Mbps clock, sync, cntl interface clock, sync, cntl interface chainable in some form Cu optical

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 27 Readout ASIC Interface – FEB View feb as many LVDS links connected per chip as needed one clock, sync, cntl interface per FEB A high data rate FEB might have 6*8 LVDS links A low data rate FEB might have 1*8 LVDS links Cu optical

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 28 'Hub' ASIC Interface hub ~48 fast LVDS data links 500 Mbps ~6 clock, sync, cntl interface blocks Gbps data links TX control link pair Cu optical

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 29 Readout ASIC Interface – FEB View feb Low data rate FEB 1*8 LVDS links 1 hub servers several FEB hub Cu optical

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 30 Readout ASIC Interface – FEB View feb High data rate FEB 6*8 LVDS links 1 hub servers one FEB hub Cu optical

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 31 Opto-Converter Interfaces 4 RX – 4 TX for control links serves 4 hubs 12 TX for data links serves 2 hubs Cu optical opto Data Clock & Control

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 32 All Combined – On Detector Part feb Cu optical hubopto Data Clock & Control

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 33 All Combined – Detector & Service Bldg. Data Clock & Control CBM Service Bldg. DCB DCS on/near Detector Clock & Sync febhubopto TNet CntlNet Control Data

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 34 DCS DCB DCS DCB DCS Physical Location View - Revisited FEBABB DCB FLES Data Control Clock & Data & Control Clock & Sync Data STS,.... TOF,...? ROC ECS Cu optical on/near DetectorCBM Service Bldg.'Green Cube' Data ~50m~500m Control 'hub''opto' Data Clock & Control DCB DCS CLOSY DCS TNet CntlNet Clock & Sync Control

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 35 DCS DCB DCS DCB DCS Data Flow FEBABB DCB FLES Data Control Clock & Data & Control Clock & Sync Data STS,.... TOF,...? ROC ECS Cu optical on/near DetectorCBM Service Bldg.'Green Cube' Data ~50m~500m Control 'hub''opto' Data Clock & Control DCB DCS CLOSY DCS TNet CntlNet Clock & Sync Control

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 36 DCS DCB DCS DCB DCS Clock & Sync Flow FEBABB DCB FLES Data Control Clock & Data & Control Clock & Sync Data STS,.... TOF,...? ROC ECS Cu optical on/near DetectorCBM Service Bldg.'Green Cube' Data ~50m~500m Control 'hub''opto' Data Clock & Control DCB DCS CLOSY DCS TNet CntlNet Clock & Sync Control

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 37 DCS DCB DCS DCB DCS Control Flow FEBABB DCB FLES Data Control Clock & Data & Control Clock & Sync Data STS,.... TOF,...? ROC ECS Cu optical on/near DetectorCBM Service Bldg.'Green Cube' Data ~50m~500m Control 'hub''opto' Data Clock & Control DCB DCS CLOSY DCS TNet CntlNet Clock & Sync Control

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 38 Where to put the 'hub' ? STS view

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 39 Slide from: S. Igolkin, 3 rd Meeting of CBM-MPS STS consortium, June 2009 (see this link) link

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 40 Slide from: S. Igolkin, 3 rd Meeting of CBM-MPS STS consortium, June 2009 (see this link) link

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 41 Slide from: S. Igolkin, 3 rd Meeting of CBM-MPS STS consortium, June 2009 (see this link) link

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 42 STS Quadrant – A possible arrangement 6 cm 5 cm STS-FEBs STS-'hub'STS-'opto'

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 43 STS Mechanical & Connection Hierarchy Data Control CBM Service Bldg. DCB DCS Module febhubopto Super-ModuleStation Clock & Sync TNet CntlNet Control

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 44 Summary

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 45 Summary This is meant to start the discussion  no pre-mature conclusions at this point This is meant to start the discussion  no pre-mature conclusions at this point Decide on general architecture and parameters  back-end links number of links per 'hub' distribution of clock/sync/control/data on links  the GBT scheme with all-on-one bi-direction link pair is one choice  asymmetric schemes, using 12TX and 4TX-4RX ribbons is another  front-end links protocol for clock, sync, data and control connections signaling (LVDS,SLVS), encoding (8/10 or not), framing,.... Decide on required R&D  Building Blocks to be tested  serializer; driver & receiver cells;...

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 46 The End Thanks for your attention

13 April 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 47 Backups