Presentation is loading. Please wait.

Presentation is loading. Please wait.

Summary DAQ Walter F.J. Müller, GSI, Darmstadt 12 th CBM Collaboration Meeting 17 October 2008.

Similar presentations


Presentation on theme: "Summary DAQ Walter F.J. Müller, GSI, Darmstadt 12 th CBM Collaboration Meeting 17 October 2008."— Presentation transcript:

1 Summary DAQ Walter F.J. Müller, GSI, Darmstadt 12 th CBM Collaboration Meeting 17 October 2008

2 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 2 This year's big event

3 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 3 Config: September Test Beam @ GSI FEB4nx SiCBM01B2 ROC Eth A B SYNC-S AUX FEB4nx SiCBM01B2 ROC Eth A B SYNC-S AUX FEB4nx SiCBM01B2 ROC Eth A B SYNC-S AUX FEB1nx Gen BEAM AUX... ROC Eth A B SYNC-M AUX DABC Online Analysis ROOT discr FEB1nx Gen MAPMT ROC Eth A B SYNC-S AUX FEB1nx Gen GEM VECC Basic Beam Diagnostics MAPMT Tests GEM chamber Tests The Plan

4 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 4 Beaming into an all new Territory All is new in the setup All is new in the setup  Detectors  FEB (front end board)  ROC (read out controller)  DAQ  Analysis go self-triggered and time-stamped  and the whole paradigm: go self-triggered and time-stamped MAKE FEE/DAQ WORK Huge effort by many persons to MAKE FEE/DAQ WORK  FEBR.Lalik (AGH) and C.Schmidt (GSI) build 3 FEB Rev B boards  ROCN.Abel, S. Müller-Klieser (KIP), and S.Linev (GSI) did all levels of data handling  DAQ-1R,Karabowicz (GSI) setup n-XYTER test & control  DAQ-2S.Linev, J.Adamcewski, V.Friese (GSI) setup DAQ and Online Analysis

5 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 5 Config: September Test Beam @ GSI ROC Eth A B SYNC-M AUX FEB1nx Gen Rev B ROLU ROC Eth A B SYNC-S AUX DABC Online Analysis ROOT discr ROC Eth A B SYNC-S AUX GEM VECC FEB1nx Gen Rev B Si-Strip The real thing FEB1nx Gen Rev B SYNC-S BEAM. discr NIM to ECL to LVDS GEM chamber Test STS Test Basic Beam Diagnostics

6 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 6 STS

7 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 7 STSGEM SEU some glue

8 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 8 DAQ Test Beam Summary The whole chain worked The whole chain worked  Radek saw the very first spill in the online monitor !  we had only about 7 hours beam over 3 days, and took data already on day one. 1 st successful proof of concept 1 st successful proof of concept  everything worked 'in principle' Good basis to get all the details right Good basis to get all the details right  sure we had some 'surprises' and 'undocumented features'  can all be addressed now based on real experience

9 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 9 Next Steps

10 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 10 Next Steps – Three Lines of Action Basic Laboratory Tests  The Starter Kits FEE/DAQ for first round of Demonstrators  proof of concept at module level  do by end 2009 (STS) or early 2010 (RPC) Design of CBM readout chain  towards ROB's and FLES interface

11 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 11 The Starter Kits

12 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 12 Config: n-XYTER Starter Kit FEB1nx Gen ROC Eth A B SYNC-M AUX Online Analysis ROOT No special infrastructure needed, just ROC + PC Det I know: It's overdue

13 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 13 Config: TDC Starter Kit FEET ROC Eth A B SYNC-M AUX Online Analysis ROOT No special infrastructure needed, just ROC + PC CLKGEN CLK250 CLK156 Just an adapter: 2 ROC user ports  8 FEET ports + clock inputs SYNC_TDC and SYNC_250 is generated in ROC R2F A B CLK250 A B C D E F CLK156 G H SYNC_T 156/250 MHz clock Det 8 channel: preamplifier discriminator time digitizer Planned for summer '09

14 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 14 STS Demonstrator 0 In-Depth Sensor Test

15 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 15 ROC Eth A B SYNC-S AUX FEB1nx Gen FEB4nx SiCBM01B2 ROC Eth A B SYNC-S AUX FEB4nx SiCBM01B2 ROC Eth A B SYNC-S AUX Config: Test Beam @ IHEP FEB4nx SiCBM01B2 ROC Eth A B SYNC-S AUX FEB1nx Gen BEAM AUX... ROC Eth A B SYNC-S AUX MIDAS Online Analysis discr ROC Eth A B SYNC-S AUX FEB1nx Gen RF DUT some aux dets SYNC message sender CAMAC DAQ System SVD-2 Beam Tracker Beam Telescope Si Strip Demonstrator 0 High precision beam tracker (25 μm pitch) from SVD-2 experiment Hybrid DAQ System: triggered + time-stamped April '09

16 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 16 STS & RPC Demonstrator 1

17 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 17 DAQ over Optics Overview … ABB DCB ROC … ABB DCB ROC … one optical link Use one optical link for  clock  clock distribution  time  time synchronization  data  data transfer  controls  controls traffic Specific communication protocol for CBM usage  Guarantee for Deterministic Latency Messages (DLM)  High data bandwidth for data stream ROC => ABB  High reliability for control messages ABB => ROC  Fault detection and fault tolerance FEB DCB: F. Lemke. U. Brüning,ZITI Hd ABB: Wenxue Gao, A. Kugel,ZITI Hd

18 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 18 Data Combiner Board Programmable core logic  Xilinx FPGA - Virtex-4 FX60  Platform ROM ensures low configuration time High speed serial links 6x SFP connectors DDR2-DRAM (32bit wide, up to 512MByte) ‏ FLASH memory (512MBit) ‏ Gigabit-Ethernet Transceiver with RJ45-Connector Programming infrastructure over JTAG and USB Connectors for user-specific Mezzanine Boards Various additional standard interfaces

19 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 19 CBM Protocol Features Standard initialization sequence Forward error correction of 1-Bit for all special characters Protocol is extendable to continue sending over switched and routed networks Open-ended hierarchical structure for concentrator network Optimized data bandwidth up to 91.428 % ( 73.148 % with 8b/10b) Fast and efficient administration packets Well defined Deterministic Latency Messages Retransmission for Control Packets FPGA implementation easily portable to ASIC

20 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 20 ABB SFP DCB SFP FEB4nx SiCBM01B2 ROC Eth A B SYNC-S AUX FEB4nx SiCBM01B2 ROC Eth A B SYNC-S AUX Config: CBM STS Demonstrator 1 FEB4nx SiCBM01B2 ROC SFP A B AUX FEB1nx Gen BEAM AUX... ROC SFP A B AUX ROC SFP A B SYNC-S AUX FEB4nx SiDem1 ROC SFP A B SYNC-S AUX FEB4nx SiDem1 ROC SFP A B SYNC-S AUX FEB4nx SiDem1 ROC SFP A B AUX FEB4nx SiDem1 CBM STS Demo 1 ROC SFP A B SYNC-S AUX FEB4nx SiDem1 ROC SFP A B SYNC-S AUX FEB4nx SiDem1 ROC SFP A B SYNC-S AUX FEB4nx SiDem1 ROC SFP A B AUX FEB4nx SiDem1 CBM STS Demo 1 DCB SFP DCB SFP ABB SFP DABC ABB SFP DCB backplane 12 ROC 3 DCB 3 ABB some details yet to be finalized

21 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 21 Config: CBM RPC Demonstrator 1 FEET ROC Eth A B SYNC-S AUX CLKGEN CLK250 CLK156 SYNC_TDC and SYNC_250 is generated in ROC 156/250 MHz clock DABC Online Analysis some aux dets SYNC message sender RPC Test Bench FOPI RPC Test Environment MBS System CBM M-RPC Demo 1 FEET R2F A B CLK250 A B C D E F CLK156 G H SYNC_T CLKdist Start counter 156 MHz clock & SYNC_TDC distribution Hybrid DAQ System: triggered + time-stamped

22 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 22 Towards the real thing

23 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 23 Design of the CBM readout chain 'Starter Kits' and '1 st round demonstrators' use existing or pre-prototype read-out ASIC's, prime objective is fast availability to support tests of concepts and building blocks. Key aspects for final CBM readout chain  scalability to full CBM detector size and data rates provide interface to FLES (First Level Event Selector)  adapt to radiation environment determine where COTS components can be used minimize functionality in exposed areas (on detector) put complex logic into unexposed or shielded areas

24 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 24 Cave Layout Space fo electronics and other services Shielding Drawing: W. Niebur For doses consult FLUKA calculations by D. Bertini

25 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 25 ROC+DCB  ROB FEB ROB xxx FLES STS FEET ROB xxx FLES RPC ROC on detectorin annex buildingin 'cellar' data digitization data aggregation data aggregation & buffering data processing

26 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 26 Summary beamed in reality We just got started, 'beamed in reality' Clear path for the level 0 and 1 demonstrators DAQ Workshop in December  coordinate design work on CBM readout chain  finalize DAQ/FLES IMoU part

27 17 October 2008 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI 27 The End Thanks for your attention


Download ppt "Summary DAQ Walter F.J. Müller, GSI, Darmstadt 12 th CBM Collaboration Meeting 17 October 2008."

Similar presentations


Ads by Google