Adding to your Diagnostic Station Adding thermometry The temperature module attaches to the top of the BP module. It is made up of the following two.

Slides:



Advertisements
Similar presentations
Using the SASS 3010 Particle Extractor
Advertisements

CRIMPING Introduction
Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Cable Probe. Safety First System can conduct electricity Do not use in flammable atmosphere Use proper personal protective equipment.
MO-735 Overlock Dealer Training CLICK.
Color Printer Training
Cap Sewing with HCS-1201 Voyager
Equipment for Assembly Fluke Multimeter 115 True RMS Glue Ring Jig Flathead screwdriver 60 Watt desk lamp HIOS Cl 4000 Electric screw driver Anti-static.
1 Stripe 400/600 Removing and Installing Printhead Printhead Resistance Calibration Toggle Position Adjustment.
Remember to clean your Evolis Primacy Card Printer often to avoid costly repairs.
Components: Sansa Clip Mp3, earbuds, USB cable, Quick Start Guide.
UVM CricketSat Assembly Manual. Getting Started Make a hard copy print out of the following page It will help you identify the proper components Place.
Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
Lokotrack ST352 Presentation
CricketSat Receiver Assembly Instructions This is the instruction slides for the assembly of a receiver board. It would be a good idea to review soldering.
CricketSat Assembly.
Expand Media Wall & Podium Case Training Video’s & Instructions.
Portable Radio Operations
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Digital StarLab Set-Up, Operation, Maintenance, and Teacher Manual for the Digital StarLab are in the links below or on the training tab in the BlackBoard.
Teaching Room User Guide – Using the AV Pod, Projector and Screen If the touch panel is blank, press firmly to wake up. Start up the Pod To turn on the.
Lecture Theatre User Guide – Using the AV Pod, Projector and Screens If the touch panel is blank, press firmly to wake up. Start up the Pod To turn on.
Getting Started with your Diagnostic Station Getting Started with your Diagnostic Station.
Hydraulic Digger Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
© 2008 Masimo Corporation Includes a review on Carbon Monoxide Poisoning For Emergency Responders V.8 1 May 2011 Monitoring CO Poisoning with the Rad-57.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Electronics Merit Badge Class 4 5/17/2015Electronics Merit Badge Class National Scout Jamboree1.
Adding to your Diagnostic Station Adding to your Diagnostic Station.
1 © 2011 Profile Recorder for ProtoFlow S Installation Instruction.
Assembly Manual Mike Fortney 04/02/2006 CricketSat Receiver.
TP4-ENERSOL-TD/PV double function
Chapter 3 Computer Assembly. 3. Introduction Assembling computers is a large part of a technician's job. This Chapter will teach you how to work in a.
Showing Demonstrations on the TV How to connect the camera to our TV set.
Get to know your WOW (Workstation On Wheels). There are 3 types of WOW’s Howard Cart SV21 SV22.
North Zone – Communications
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
ELECTRONIC VOTING MACHINE (EVM) Presented by: Miss.Kenyir Olga Nongrum, NIC for Election Dept.Jowai.
Setting up the Ricoh C305 Press F5 to start the Presentation
© 2008 Masimo Corporation RAD-57 EMS Carry Case Lightweight: 13 oz. Small: 6.2” x 3.0” x 1.4” Portable: operates on 4 “AA” batteries Supplied with high-visibility,
Removing and Replacing the Battery Cover 1. Ensure the phone is turned off. 2. Press the Battery cover locker; lift the battery cover up and away from.
FROST I Site Initiation Visit version 1.4. IVTM System.
Sony Handycam Instructions Directions Written By: Stephen Hall, Student Technical Assistant Ms. Miri Kim, Director of Instructional Design and Technology.
310 Series Basic Leveling Procedure
By: Elizabeth Campbell.  Fluorescence is a useful tool for chemists to determine what wavelength of light a compound emits.  A Fluorescence Spectrometer.
PC Systems Building System Components Installation Procedures Sample PowerPoint Presentation.
Using your Diagnostic Station ADC by SunTech Adview features Overview of the ADC by SunTech AdviewOverview of the ADC by SunTech AdviewOverview of the.
Service Manual. Cubi Overview The service manual instructs the installing and removing the mSATA, memory card, Wifi card and 2.5 inch HDD.
Using your Diagnostic Station ADC by SunTech Adview features Overview of the ADC by SunTech AdviewOverview of the ADC by SunTech AdviewOverview of the.
Up and Over Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
Getting Started with your Diagnostic Station Your ADC ADVIEW Diagnostic Station Unpacking the contents, you will find… Quick start guide (a printed version.
The Complete Training/Knowledge Guide. Session 2: Phone Basics  Removing the Back Cover  Installing the Battery  Removing the Battery  Installing.
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
IOPtiMate™ OT-135P2 Technical Training – Part I System Description, Installation & Operation IOP (07)
Smart Board Troubleshooting.  The User Guide contains useful information such as installing, connecting, maintaining, and troubleshooting your Smart.
Getting Started with your Diagnostic Station Getting Started with your Diagnostic Station.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
RockOn! RockOn! Structure Build RockOn! 2009.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
WELCOME TO EVM WITH VVPAT TRAINING FOR ARO’S and STAFF
PostBase Automatic Feeder Component Removal Service Training
Hot-Air Balloons.
Intro and T1 Troubleshooting
Installing the SIM CARD and Battery
Laser 3000™ Operating Instructions
PHASE IDENTIFICATION UNIT (PIU)
Reader Swap out Guide.
Step-by-step assembly instructions
Setting up of EVMs & VVPATs
Presentation transcript:

Adding to your Diagnostic Station

Adding thermometry The temperature module attaches to the top of the BP module. It is made up of the following two pieces: The temperature module attaches to the top of the BP module. It is made up of the following two pieces: Display (Part A)Holder/Well (Part B)

Adding thermometry 1.Using the power button on the right side of the BP module, ensure that the ADC Adview is off. 2.Remove the cover plate from the top of the BP module.

Adding thermometry 1.Slide part A of the temperature module along the guides on the top of the BP module from front to back until it snaps into place. All the segments of the temperature module display will light when the modules have been connected correctly. Display (Part A) Holder/Well (Part B) Display (Part A)

Adding thermometry 1.Attach the temperature probe connector to part B as follows: with the black surface facing downward, hold the probe connector end against the notches on the probe holder, as shown in red.

Adding thermometry 1.Rotate the connector upwards until it snaps securely into place. The black surface faces outward and the cord extends upward.

Adding thermometry 1.Slide part B onto part A as shown (this connects the temperature probe connector to the temperature unit connector), and insert the temperature probe into the well. Display (Part A) Holder/Well (Part B)

Synchronizing the modules 1.Turn the device on using the power button on the right side of the BP module. At the end of the start-up sequence, the temperature module display will blank except for the appropriate temperature unit icon (°F or °C). A short beep indicates that the ADC Adview is ready. Refer to the ADC Adview user’s manual for operation, maintenance and safety instructions. Refer to the ADC Adview user’s manual for operation, maintenance and safety instructions. Need help? Need help?

Changing the unit of temperature measurement Using the end of a paper clip or similar tool, press the recessed button on the temperature module. The icon for the selected unit is displayed.

Adding pulse oximetry The pulse oximetry module attaches to the bottom of the BP module. Included in the Pulse Oximetry Module kit are the pulse oximetry module, the adult reusable sensor, and a 6’ extension cable. The pulse oximetry module attaches to the bottom of the BP module. Included in the Pulse Oximetry Module kit are the pulse oximetry module, the adult reusable sensor, and a 6’ extension cable.

Adding pulse oximetry 1.Using the power button on the right side of the BP module, ensure that the ADC Adview is off. 2.Remove the cover plate from the bottom of the BP module.

Adding pulse oximetry 1.Slide the pulse oximetry module along the guides on the bottom of the main BP module from front to back until it snaps into place. All the segments of the pulse oximetry module display will light when the modules have been connected correctly.

Adding pulse oximetry 1.Turn the device on using the power button on the right side of the BP module. At the end of the start-up sequence, the pulse oximetry module display will blank except for the “%SpO2” symbol. 1.Turn the device off, connect the adult reusable sensor to the 6’ extension cable, and then the cable to the connector on the module. Secure the cable to your device using the retention clip.

Synchronizing the modules 1.Turn the device on. All display segments light up for three to five seconds. A short beep indicates that the ADC Adview is ready. Refer to the ADC Adview user’s manual for operation, maintenance and safety instructions. Need help? Need help?