LCMS-325 TQ Operation Chem 115 Paul Hrvatin Winter 2013.

Slides:



Advertisements
Similar presentations
Spiro Vision 3+ This slide show will advance automatically. To manually advance, click on the screen, or press enter.
Advertisements

CHDD BOL Equipment Primer Rooms CD 326 & CD 391 Behavioral Evaluation Center Behavior Observation Laboratory.
Mouse Tutorial for Win XP In this tutorial you will learn to: Move the mouse Click and double click Make selections Manage windows Use menus Click the.
Getting started with LEGO NXT Mindstorms software This is intended to be a short introduction to the LEGO Mindstorms software and programming the LEGO.
Microsoft® Word 2010 Training
Click on the “LABELS” button (this is a ‘toggle’ button,. Click once to turn on, second time to turn off) ** This Screen will NOT CHANGE ** You have selected.
How to import and edit video clips in Windows Movie Maker
Department of Environmental Conservation 1 DATAMAX PRINTER SETUP MODULE 1.
 Use the Left and Right arrow keys or the Page Up and Page Down keys to move between the pages. You can also click on the pages to move forward.  To.
LogTag Training January 2015
How to Program the Bypass Tray on most Sharp Models.
Computer Basics Dayton Metro Library Place photo here May 20, 2015.
Lab 08 Introduction to Spreadsheets MS Excel
XP New Perspectives on Microsoft Office Word 2003 Tutorial 1 1 Microsoft Office Word 2003 Tutorial 1 – Creating a Document.
XP 1 Microsoft Office Word 2003 Tutorial 1 – Creating a Document.
Using the Unity 98 Cordless Response System Directions : Courtesy of IHC public relations.
Key Applications Module Lesson 12 — Word Essentials
AccuMax Multi-Point Injection Mechanics
Introduction to Operation of the XL- 30 Scanning Electron Microscope Tutorial # 2 Introduction to Operation and Imaging.
Mouse Skills. Hold the mouse with your right hand… When you move the mouse, the mouse arrow moves on the screen…. Moving The Mouse.
Google Earth How to create a Google Earth Tour and place it in your Wiki.
Access Tutorial 10 Automating Tasks with Macros
®® Microsoft Windows 7 Windows Tutorial 1 Exploring the Basics of Microsoft Windows 7.
Power Point EDU 271 Microsoft PowerPoint is a powerful tool to create professional looking presentations and slide shows. PowerPoint allows you to construct.
SMART Response Initial Set-up: Windows PC Teacher and Class Set-up Creating a Quiz, Test, or Survey Delivering an Assessment Reports Additional Question.
IPAD Set Up. Gmail Account First, you need to set up a free gmail account with your name. If you have an existing one you may use that as long as: – A)
Microsoft Office Word 2003 Tutorial 1 Creating a Document.
High Speed Data Converter University
PowerPoint 1 The Basics 1. Save this file to your Apps Folder as YourLastName_PP1 2. Read each slide. 3. Complete each set of numbered directions.
Thank you for your decision to try vTreePro Practice Tree Software! Your satisfaction is very important to us. Please feel free to send us an if.
ICP Shutdown. Pump Flush the nebulizer spray chamber with acid for 5 minutes by choosing the location of the 3% HNO3 and moving the sample needle “position”.
Using the PDA Links to each of the topics Go to next slide Intro to “Getting Started Changing iPAQ Settings -Setting the Time/Date -Changing Keyboard.
BASIC EXCEL 2007 Mrs. Macias Computer Science Summer 2008.
Microsoft Windows 7 Part 1 Fundamentals of Using Windows 7.
XP 1 Microsoft Word 2002 Tutorial 1 – Creating a Document.
Wimba Presenters Guide North Dakota University System 2009.
Windows Tutorial Common Objects ACOS: 1, 4. Using the Taskbar 1. Using the taskbar, you can switch between open programs and between open documents within.
Create Forms Lesson 5. Objectives Software Orientation The Forms group (below) is located on the Create tab in the Ribbon and can be used to create a.
Change in your CAD Project File - it happens all the time in robotics.
GISMO/GEBndPlan Overview Geographic Information System Mapping Object.
Using Pro-Engineer to Create 3 Dimensional Shapes Kevin Manner Kevin Manner Tim Reynolds Tim Reynolds Thuy Tran Thuy Tran Vuong Nguyen Vuong Nguyen.
As you look at an iMac you will notice that there are no buttons on the front of the machine as shown in figure 1.
TECHNICAL TRAINING SMART COMMANDER System Requirements CPU : 800MHz and aboveCPU : 800MHz and above Memory : 256MB RAM or HigherMemory : 256MB.
Overview of MSWS Control of 212-LC July 15, 2006.
MiPACS Introduction for Sunset. Launching MiPACS 2.
Chapter 3 Device Monitor Screen Otasuke GP-EX! Chapter 3 Device Monitor Screen Chapter 3 Device Monitor Screen.
4 weeks to heaven.  Basic computer architecture  Power-up  Starting up Windows  Mousing  Keyboard  windows  Finding and starting programs  Working.
Configuring a New Program in PLC’s Window 7. Step 1 Click on the Blank Paper icon to begin a new program.
FOR POWER POINT HOW TO CREATE AN ILM HOW TO USE THIS INDEPENDENT LEARNING MODULE 1.Review this 5-6 minute PowerPoint presentation with your computer.
Key Applications Module Lesson 12 — Word Essentials Computer Literacy BASICS.
Computer 1 Minneapolis Public Schools- Transition Plus
Engineering 1182 College of Engineering Engineering Education Innovation Center SolidWorks Layout Model Tree Viewing Options Rev: , AJPSolidWorks.
Chapter 6 Introduction to Hexa – Workshop 1 2D Pipe Junction
The Internet.
Printing Return Address Labels
3.14 Microscan QX-870 Scanner Configuration
Course Revision Form.
ELEC 1041 Digital Electronics Tutorial: Word Problems
Tutorial 1 – Creating a Document
Dayton Metro Library Computer Basics September 19, 2018
3a) Load or Verify IonSource & Tune File
Dayton Metro Library Place photo here Computer Basics December 8, 2018.
Gas Laws When looking at how gas particles react in different situations, we want to look at four different variables and how they affect each other: Temperature.
After opening Slic3r you will see the Slic3r desktop.
Diagnostics Analytical 920 LC Semi-Prep 940 LC
Particle Insight Getting Started – Start-up & New Run….
Particle Insight Getting Started – Start-up & New Run….
Assemble and link your name cubes
Print, Collate, and Staple
Lab 08 Introduction to Spreadsheets MS Excel
Presentation transcript:

LCMS-325 TQ Operation Chem 115 Paul Hrvatin Winter 2013

LCMS-325 TQ Operation 1.Make sure the solvent reservoirs are sufficiently filled with HPLC grade solvent. 2.Open System Control if it is not already open by clicking on the top and most left icon (Figure 1) on the tool bar at the top of the monitor. This opens up the Quad View (Figure 2). Make sure you are using view III (Figure 3) so that the proper quadrants are viewable. Make sure the correct method is loaded. This software should look familiar because it is similar to that used for the HPLC experiment. The desired method for running the ubiquitin samples is ‘MS-115’. It is a 22 minute method that allows for all 9 injections of the LCMS experiment with one extra 2 minute time block extension. However, the ‘Chem115 MeOH’ method, which is only a 4 minute method that is used in the shutdown protocol; is shown loaded in Figure 4. Changing methods is done by activating the desired method under the file tab of System Control. 3.Click Turn Spray On in the Quad view (Figure 5) to turn on the gases and heaters. Once the temperature reaches 75% of the set value, activate the pumps by navigating to that window using the Windows tab under System Control. Figure 1Figure 2 Figure 3Figure 4

LCMS-325 TQ Operation Figure 5Figure 6 Figure 7Figure 8 3 cont. The spray icon now has a red stream coming from it (Figure 6) 4.A few minutes is required for the temperature to stabilize, load your sample into the sample loop during this time making sure the valve is in the load position. 5.Under the file tab In System Control, open up the sample list and set the data file and destination. Toggle back to the Quad View using the windows tab. 6.Once the API and 325 indicate they are ready (Figure 7), its time turn on the analyzer. The button turns green when it has been activated (Figure 8). 7.Toggle back to the sample list using the windows tab under System Control and click Begin on the sample list. This starts the automation. 8.Toggle back to the LC pump window and click Start Run on the pumps. This starts the run and the green analysis timer begins in the area to the right of ‘325 MS: ready to collect’ seen in Figure 5. Push the valve button to inject your first sample (water blank) into the LCMS. 9.Fill the syringe barrel with water and flush out the injection port 2-3 times with a full 25µL each flush. Pull up 10-15µL of the next sample into the syringe, switch the valve to load, and fill the loop with the next sample. Repeat this step as necessary and inject your ubiquitin samples in 2 minute intervals.

10.Shutdown protocol: Once the analysis completes, stop automation by clicking Stop Automation under the automation tab in System control. Before you go to data work up, activate the method ‘Chem115 MeOH’ and click Start Run in the window so the needle and API can be flushed out. 11.Data Work up: Open your data file by clicking on the data processing tab at the top of the monitor (Figure 9) opening that window (Figure 10). Click on the desired peak and the mass spec data pops up below (Figure 11). Use the arrow keys to locate the highest RIC for the peak of interest. Right click on the mouse to label the peak as desired by choosing New Label for Plot1 (Figure 12). Hover the mouse over the label; when the arrow turns to a ‘hand’ the label and its indicator can be dragged to their desired locations. Print, using the printer icon, choose active chromatogram and spectrum, click the short stack printer icon to send the data to the printer. 12.Toggle back to the Quad View, click Spray Off button to stop the spray and verify that the spray in the API window has turned to a drip. Allow the drip to continue to flush out the needle and chamber for a few minutes. 13.Using the Windows tab in System Control, toggle to the window and click Stop Pumps. It is now safe to close out System Control, normal exit. LCMS-325 TQ Operation Figure 9Figure 10 Figure 11Figure 12