Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.

Slides:



Advertisements
Similar presentations
Autodesk Inventor: Part 3 Creating a Drawing Once a part has been finalized and fitted into the assembly, a Drawing needs to be made, so a diagram of the.
Advertisements

Cutting Your Own Picture Mount In Easy Steps My Competition Entry.
2x2 module & stave layouts. 2 options “Small chip” “Big chip” Boundary between “small” and “big” is determined by the 6” sensor wafer layout that must.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
Stave 130 Tooling John Carrol & Tim Jones. Status First generation stave assembly tool model modified to incorporate… – Stave Geometry Length 1277mm Width.
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
Rosier Ph. – IPNO – Detector Dpt. – 27/05/2011APRIME HPS collaboration meeting 1/24 1- Vacuum chamber proposal 1.1- Stainless steel chamber design and.
 Introduction  Designing of Die Block  Process of making Press Form Points to be Covered PRESS FORM AND RUBBER TECHNOLOGY.
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 Stave.
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
Status Update on Mechanical Prototype in Rome November 6,
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
ATLAS IBL Tool for gluing flex on omega C.Bault/FX Nuiry - IBL Stave Meeting - UniGe August 31st Process description This tool has been designed.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For.
Geometry of the Tracker in the Flight Instrument The following slides present an overview of the geometry of the tracker. Dimensions corresponding to constants.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
PLAN #PartProcessTools and equipmentQuality controlSafety *Aprons must be worn is ALL stages of manufacture Tim e 1 MDF base Mark out on MDF piece Pencil,
SLHC Strip Tracker Module Envelopes (Tim) WP4 Meeting Glasgow, 13 th June 2011.
Hybrid Integrated Circuit
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
UNIT PROJECT #3 INTRODUCTION Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
CLIC Permanent Magnet Quadrupole Engineering Development of second family member Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 07/11/2012.
Visit to Heidelberg Loek Ceelie Henk Schuijlenburg.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
Plank #7 and beyond. 2 What was new for plank#7? Carbon-fibre jig Oversize (by 10mm) facesheets during stave core build –Facesheets now at the very limit.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
Gluing, measuring and shearing Heated plate curing Is the process feasible? Tests with 130nm hybrids Measure resulting glue thickness Determine the shear.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Bridge Project. Materials – 8 pieces of wood, glue, cutters, masking tape and a ruler.
Stave130 Assembly Jig (Tim). Current Tooling Components – CF jig + ‘C’-channel jig & various face-sheet positioning aids It works! – Seems to produce.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
SLHC Stave Wire-bonding Clearances (Tim) WP4 Glasgow (13 th June 2011)
1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Stave Tooling & Plans for Future Stave-building (Tim)
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.
Engineering drawing Every language has its own rules of grammar. Rules of grammar : Lines, lettering, and dimensioning.
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
Strip Stave Status & Plans at Yale Yale: Paul Tipton, Will Emmet, Tom Hurteau.
BM&N STS ladders assembly in VLHEP
Ladder Assembly All tools and jigs produced Glue dispensing works
Are there better ways to build a stave?
Reminder of Stave250 Tooling Design
Equipment for Assembly – UK Experiences
Building a Nightstand Woods 1 Final Project Step #1
Introduction to SolidWorks
Module/Ladder Assembly
Break down Lance rack Cut one of each of these for each rack
H. Felice, M. Segreti,, J.M. Rifflet, D. Simon
Pixel module assembly tooling
Single Detector Design
Presentation transcript:

Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014

C channel gluing jig assembly

Some design feature CF c-channel (same as that used to build the stave) is used as a spacer. Face sheet thickness: 0.35mm Glue layer: 0.1mm CF C= channel outer dimension: H5.1mm x W4.0mm (refer to Peter’s drawing) Interface to the stave building vacuum jig Interface to the co-cured face sheet Main frame

C channel tolerance If C-channel final height is , then the glue thickness could be only 0.05mm, so question: should C-channel tolerance be ?? Also if C-channel is on max tolerance, then there will be a gap between clamping piece and C channel inner face; that means there is no positive pressing on the C channel to the face sheet. Therefore, sufficient glue thickness is required to fill in the voids. Stave building vacuum jig

Holes for C channel jig The width of the stave can be adjusted to 110, 115 and 120mm, by moving the top and bottom clamping pieces towards or away from the centre line of the stave.

Holes for stave building tooling For face sheet alignment Dowel holes for locating the rulers for masking and gluing.

Some questions about dimensions 50mm ? 70mm? 50mm?