1 V. Carassiti - Princeton (USA) 9-13/01/2003 1 BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING

2 V. Carassiti - Princeton (USA) 9-13/01/2003 2 DETECTOR LAYOUT EXPLODED

3 V. Carassiti - Princeton (USA) 9-13/01/2003 3 DETECTOR LAYOUT ASSEMBLED

4 V. Carassiti - Princeton (USA) 9-13/01/2003 4 IAROCCI TUBE TUBE MATERIAL : NORYL OR PVC THE TUBE IS NOT SELF SUPPORTING

5 V. Carassiti - Princeton (USA) 9-13/01/2003 5 RIB RIB MATERIAL : STEEL NUMBER OF RIBS : TO BE OPTIMIZED DEPENDING ON DETECTOR’S EFFICIENCY AND STIFFNESS REQUIRED ASSUMING A RIB OF 1 MM THICK FOR EACH TUBE, THE TOTAL LENGTH NEEDED IS ABOUT 8000 m; THE CORRESPONDING WEIGHT IS 1260 Kg AND THE COST = 3.6*1260 = 4536 € (20% VAT INCLUDED)

6 V. Carassiti - Princeton (USA) 9-13/01/2003 6 DETECTOR’S STIFFNESS THE HELP OF THE RIBS

7 V. Carassiti - Princeton (USA) 9-13/01/2003 7 GLUEING – PHASE 1 THE RIB IS GLUED ON THE TUBE’S SIDE

8 V. Carassiti - Princeton (USA) 9-13/01/2003 8 GLUEING – PHASE 2 THE DETECTOR’S MODULE IS ASSEMBLED

9 V. Carassiti - Princeton (USA) 9-13/01/2003 9 GLUEING – PHASE 3 STRIPS, GROUND, SIGNAL PCB AND INSULATOR FOILS ARE ASSEMBLED THE TOTAL THICKNESS IS ABOUT 1 MM

10 V. Carassiti - Princeton (USA) 9-13/01/2003 10 GLUEING – PHASE 4 STRIPS, GROUND, SIGNAL PCB AND INSULATOR FOILS ARE GLUED ON THE TUBES

11 V. Carassiti - Princeton (USA) 9-13/01/2003 11 DETECTOR’S VERTICAL STIFFNESS

12 V. Carassiti - Princeton (USA) 9-13/01/2003 12 MOUNTING AND DISMOUNTING THE DETECTOR  THE STRIPS FOIL GOES IN TO THE GAP (SLIDE 13); A PROPER TOOLING KEEPS IT IN SHAPE AND PLACE  THE MODULES OF THE DETECTOR ARE INSERTED ONE BY ONE FROM THE BOTTOM TO THE TOP, THE NEXT SLIDING ON THE PREVIOUS ONE (SLIDES 14, 15)  EACH MODULE CAN BE HELD ON BOTH EDGES, WHICH ALLOWS THE LIFTING AND THE ADJUSTMENT.  WHEN THE CORNER PIECES ARE MOUNTED THE DETECTOR DISASSEMBLY IS STILL POSSIBLE AFTER THE CENTER PIECES REMOVAL (SLIDE 16); THE PROCEDURE IS THE FOLLOWING: 1) LIFTING THE UPPER MODULES 2) EXTRACT THE CENTRAL MODULES 3) IN THE MIDDLE OF THE GAP THERE’S THE SPACE TO LOWER OR LIFT THE OTHER MODULES.AND REMOVE THEM.  THE OPERATION OF ASSEMBLY AND DISASSEMBLY NEED A TOOLING, HOLDING AND HANDLING THE MODULES OF THE DETECTOR.

13 V. Carassiti - Princeton (USA) 9-13/01/2003 13 INSERTING THE STRIP FOIL THE STRIP FOIL SLIDES INTO THE GAP A TOOLING HOLDING AND MOVING THE FOIL IS NEEDED

14 V. Carassiti - Princeton (USA) 9-13/01/2003 14 INSERTING THE DETECTOR - 1

15 V. Carassiti - Princeton (USA) 9-13/01/2003 15 INSERTING THE DETECTOR - 2

16 V. Carassiti - Princeton (USA) 9-13/01/2003 16 EXTRACTING THE DETECTOR

17 V. Carassiti - Princeton (USA) 9-13/01/2003 17 THE LAYER IN PLACE