Facilities Modernization Program Funded by Measure B Project Report September 21, 2015.

Slides:



Advertisements
Similar presentations
Facilities Improvements and Bond Construction Update Facilities Advisory Committee Long Beach Community College District December 2, 2008 EDUCATE ENGAGE.
Advertisements

Facilities Modernization Program Funded by Measure B Project Report December 17, 2012.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 21, 2008 BUILDING TOMORROW TODAY Cordoba Corporation.
Update on FCPS Construction/Renovation Projects May 2009.
Tam Valley School Modernization - Phase 1 Summer 2011.
MULTIPLE PROFESSIONAL REVIEWS DOCUMENT SOLUTIONS Architectural and engineering review identifies building code and accessibility repairs needed. ($750,000.
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
June 8, 2011 Irvine Unified School District. What is a Modernization? Eligibility Permanent buildings - 25 years old Portable buildings - 20 years old.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 31, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
May 6, 2010 Irvine Unified School District HMC Architects.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 19, 2009 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District July 20, 2009 EDUCATE  ENGAGE  EMPOWER 1.
MENDOCINO COLLEGE MASTER PLAN Mendocino College Faculty and Staff Presentation December 10, 2008.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District August 8, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 25, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 25, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 2, 2008 BUILDING  TOMORROW  TODAY 1.
Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.
FBCLS Facilities Master Plan September 14, Future Planning Team Dave Esely Sheryl Franke Bud Hertzog Blake McKinney Wendell Shaffer Sara Taylor.
Facilities Modernization Program Funded by Measure B Project Report April 16, 2012.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 14, 2010 EDUCATE  ENGAGE  EMPOWER 1.
BOND PROGRAM UPDATE Building Tomorrow Today Long Beach Community College District The Long Beach Rotary Flex Day,March 28, 2007 Flex Day, March 28, 2007.
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
Bond Construction Update Citizens’ Oversight Committee Long Beach Community College District January 28, 2008 BUILDING  TOMORROW  TODAY Cordoba Corporation.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Facilities Improvements and Bond Construction Update Facilities Advisory Committee Long Beach Community College District Septmeber 24, 2009 EDUCATE  ENGAGE.
Facilities Modernization Program Funded by Measure B Project Report October 20, 2014.
Facilities Modernization Program Funded by Measure B Project Report September 16, 2013.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Facilities Modernization Program Funded by Measure B Project Report September 16, 2014.
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
Facilities Maintenance Status Report John Ozurovich, Director Facilities – Saddleback College John Edwards, Director Facilities – Irvine Valley College.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Facilities Modernization Program Funded by Measure B Project Report March 19, 2012.
Facilities Modernization Program Funded by Measure B Project Report November 21, 2011.
Paradise Valley Community College CLC Update Jacalyn A Askin, Vice President of Administrative Services May 8, 2009.
Facilities Modernization Program Funded by Measure B Project Report April 19, 2010.
BRVFD & RS Training Facility Proposal 05/07/2009.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 1,
Bond Construction Update Facilities Advisory Committee Long Beach Community College District November 17, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District October 24, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 6, 2011 EDUCATE  ENGAGE  EMPOWER 1.
TOMMY OLIVER STADIUM John Bozarth February 23, 2016.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District July 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District March 3, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
White Pigeon Community Schools
Facilities and Sustainability Committee
Bond and Override Report
Facilities Update November 17, 2017
Facilities Modernization Program
Facilities Report to the Buffalo State College Senate May 6, 2016
Welcome! Hodgson Middle School Parent Information Night
Facilities Modernization Program
2007 Bond Issue Capital Improvement Program
Facilities Projects Update
Capital Outlay Workshop
Recent Bond Accomplishments
EAST PENNSBORO AREA SCHOOL DISTRICT
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

Facilities Modernization Program Funded by Measure B Project Report September 21, 2015

PROJECT PROGRESS REPORT Library Remodel Project Team: Architect: Noll & Tam Construction Manager: Parsons Brinckerhoff Contractor: WA Thomas Construction, Inc. Project Update: Construction Started August 4, Project Substantially Completed April 3, 2015 Opened to students and staff on April 6, 2015 Punch list work completed; DSA submission for Certification in progress Occupancy: April 2015 LAS POSITAS COLLEGE September 21, 2015

PROJECT PROGRESS REPORT Renovations – 100, 900, 1000, 1310/1320, 1700 Project Team: Architect: Charles Ham and Associates Construction Manager: Parsons Brinckerhoff Contractor: WA Thomas Construction, Inc. Project Update: B1700 – Print Shop, Mail Room and Large Group Meeting Room – Complete, with punch list completed. B1310/20 - Veterans Program Completed, Punch list is completed. B900 – Temporary classroom- renovate – Deferred.. B1000 – Demolition completed January Occupancy: Winter 2014 LAS POSITAS COLLEGE September 21, 2015

Project Team: Architect: Carducci and Associates Construction Manager: Parsons Brinckerhoff Contractor: TBD Project Scope: Project will address accessible pathway from parking lot to Campus Blvd. with Tie-in of the upper SSA courtyard and Veterans area. Project Update: Schematic Design in process DSA submission Winter 2015 Construction to commence spring 2016 Construction Completion Summer 2016 Occupancy: Summer 2016 PROJECT PROGRESS REPORT Landscaping Project LAS POSITAS COLLEGE September 21, 2015

Project Team: Architect: Carducci and Associates Construction Manager: Parsons Brinckerhoff Contractor: Integra Construction Project Update:.Concrete surfacing to replace existing grass and irrigation system. Construction Started October 6, Substantial Completion April 1, Punch List complete. Occupancy: April 2015 PROJECT PROGRESS REPORT Amphitheater Resurfacing Project LAS POSITAS COLLEGE September 21, 2015

Project Team: Architect: Lionakis Construction Manager: Parsons Brinckerhoff Contractor: JD General Project Update: Construction Start – May 13, 2015 Renovations of approximately 1450 SF for use as a Computer Information Systems Lab Construction Completed August 14, 2015 Punch list in progress. Occupancy: Fall Semester 2015 PROJECT PROGRESS REPORT B700 CIS Lab Project LAS POSITAS COLLEGE September 21, 2015

Project Team: Architect: Lionakis Construction Manager: Parsons Brinckerhoff Contractor: Integra Construction Project Update: Construction Start June 1, 2015; 6 Modular Classroom with platform, stairs and ramp installed behind B1700 Modulars will house classes during the construction of the New Academic Building 100. Construction Completed August 14, 2015; Occupancy: Fall Semester 2015 PROJECT PROGRESS REPORT Temporary Classrooms LAS POSITAS COLLEGE September 21, 2015

PROJECT PROGRESS REPORT New B100 Academic Bldg Project LAS POSITAS COLLEGE September 21, 2015 Project Team: Architect: Lionakis- Bridging Architect Construction Manager: Parsons Brinckerhoff Contractor: HMC Architects/Balfour Beatty Construction Project Update: Schematic Design Completed DSA Submittal February 2016 Construction Start June 2016 Bldg 300 will relocate to Bldg 700 in Summer 2016 Occupancy: Fall 2018

PROJECT PROGRESS REPORT Small Projects List LAS POSITAS COLLEGE September 21, 2015 Project No. Type of RequestLocationProjects/Description Point of ContactDivisionCommentsFunding 4Reno400 Renovate 400, Basic Skills English Center - Replace carrels with Spectrum desks with computers, removing walls in Rm 401A ALSSCompleted 23Reno810Electrical Outlets- Welding Lab STEMPSEngineer/Contractor producing Documents for Construction during winter break. Additional scope of work requested for Viticulture, Engineering in progress 30Reno1850Replace Biology lab countertops throughout 1850 with heat resistant, chemical resistant, scratch resistant black countertops similar to the recent change made in 1807 with epoxy resin solid core countertops STEMPSWork to be completed during Winter Break 26Equip2500Replacing desks and chairs in room PE 209 and PE 212 BSBA Completed 31Reno2500Removal of plants & rosemary inside pool area and concrete over it. BSBACompleted 33Reno4000Sound Proof-FIX-elevator noise in room 4130 ALSSArchitect/Consultants working on Construction Documents for submission to DSA for approval; Construction to happen during summer Reno4130 / 4138Rooms 4130 and Dropped ceilings and/or acoustic discs (ceiling panels/circles) installed in MCA Rooms 4130 and 4138 *Extra acoustical treatment necessary from 4138 to 4226, downstairs to upstairs. ALSSArchitect/Consultants working on Construction Documents for submission to DSA for approval; Construction to happen during summer Space4000 OutsideStorage Shed - 9'x32' Shed for storage of flats, platforms and risers. ALSSContainer at M&O being allocated; roofing for weather tightness being performed. 12Equip4000Key pad locks and security cameras in Music Practice Rooms ALSSCompleted 43Reno1800Power wash and paint interior and exterior of the 1800 building including power wash of surrounding sidewalks. Note: protect for second floor leaks (see Carol Edson). STEMPSCompleted 39Reno1812Vent ammonia storage cabinet to outside of building STEMPSCompleted 44Reno , 1854, 1855, 1858 Instructor Desk add additional electrical quad receptacles to end near hoods (see Gire for specifics) STEMPSCompleted 38Reno2300Add Fence at the Child Development Center BSBACompleted 18Equip Purchase 25 passenger Van BSBACompleted 24Equip2300Tilt Zoom Cameras for three (of the 7) Child Development Center Classrooms BSBAcameras on site, IT install 1 camera for testing

Year 1 Grant– Total $581,000 (Chabot +LPC) –Roadway and Parking Lot LED - Completed Year 2 Grant- Total $459,000 (Chabot + LPC) –Campus walkway and exterior Building LED replacement in progress PROJECT PROGRESS REPORT Proposition 39 Energy Grants LAS POSITAS COLLEGE September 21, 2015 Year 2- Estimated Completion Fall 2015