WISH LISTS. GHS Install building wide phone system w/voicemail Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.

Similar presentations


Presentation on theme: "WISH LISTS. GHS Install building wide phone system w/voicemail Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel."— Presentation transcript:

1 WISH LISTS

2 GHS Install building wide phone system w/voicemail Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel area on step Rekey interior of building Resurface floors in RR – add Exhaust Repair/Replace auditorium seating, ceiling, AC, audio system Add locker room N end of Ftball field Add equipment storage and multipurpose/wrestling room Add new press box, restrooms, concession, east side of football field Replace existing poles/lights on football field Expand existing track Pave parking area around fields Extend curbing around SS Blvd Remove cabling/posts along SS Blvd Add restrooms to existing weight training room Repair ceiling in Thiel Gym Repair pool area walls/repaint pool Redesign main entryway Fix/replace roof leaks AC entire building Replace aging student desks/chairs Add covered portico from main gym to locker room Replace interior lighting controls w/motion detection sensors

3 Churchill Add football locker room, equipment storage, 4 classrooms, auxiliary gym Add landscaping in front of building Repair roof over auditorium Paint metal or replace on west side roof Update building electrical to accommodate new technology Add driveway on S side of bldg for bus traffic only Replace floor tiles in hallways & some classrooms Renovate all restrooms Add fence along Mary Street Sand & seal stage floor, replace carpet down runways in auditorium

4 Lombard Concrete work needed around building Repair AC/Heating system in 8 th grade wing Upgrade the track Heat issues in the 1939 building to be addressed Update wiring in older building Upgrade in library New performing arts wing New labs and sinks in science lab 7 th grade Repair emergency room buttons & clock system

5 Gale Change office layout Improve appearance of entrance to building Addition of auxiliary gym AC throughout building Addition of another entrance/exit to Gale – traffic flow problems Renovate restroomsClocks Replace cafeteria tables Concrete work front sidewalk/entrance Improve outside lighting for security Install outside cameras Replace boiler Replace lighting in gym Upgrade phone system Phone access in each room Additional copiers Add copy room, teachers lounge, meeting room Replace floor tiles in copy room and in vault area Paint or replace metal on outside of building Improve air circulation in classrooms Additional classrooms needed due to population increase Increase size of computer lab Add electrical outlets in classrooms

6 King Alternative Gym Video security upgrades Ceiling fans in classrooms AC throughout building Need for designated drop off in S parking lot Communication system upgrades Faculty lounge Copy center upgrades – AC/upgrade electrical Electrical upgrades throughout the building Phone upgradesNatural ceiling lighting Additional Exterior lighting on the playgrounds Window upgrades Additional rooms needed – classrooms, meeting rooms, data Noise reduction in hallway New teacher workstations Move office to the front of the building

7 Nielson Install AC Renovate main restrooms Upgrade exterior lighting on playground Telephone access to each classroom Additional electrical outlets Roof repairs/pitched roof needed Improved circulation within the pod areas Move office area to the front of the building Extend parking lot on the N side of the building Add Landscaping in the front of the building Additional multipurpose room Add additional classrooms and general use space for increasing population by adding a 2 nd floor

8 Steele Update electricity for new technology needs Building an additional gym/fitness center Additional security cameras installed New roof Renovate main restrooms Improve circulation in pod areas Phone lines throughout the building Move office areas to front of the building Install AC Lighting on playground upgraded Additional classrooms, offices for instructional services

9 Silas Willard Sand and reseal gym floor Locate & reactivate ceiling vents in 2 nd floor Add ramp for handicapped access from E gym to main floor Repair/replace cement steps E of gym and back of stage entrance Add windows that open in stairway to 2 nd floor Renovate all restrooms Replace floor tile in several classrooms Install lockable furnace Window access in basement EBD room #4 Install better lighting on stage Repaint interior walls, ceilings, stage area Repair/replace wallpaper upper level of gym Update electrical systems for modernizing technology Build walls in office area for nurse/principal Install ceiling fans in classrooms Install AC Replace carpet in building Install electronic sign Install larger canopy at entrance off parking lot Install additional proximity card entrance door on all outside doors Open up lab and library areas Copy center upgrades Remove carpet and install rubber like stairs for stairway and entrance hallway Add 25 lockers @rooms 104, 105, 110 Upgrade exterior lighting around building/parking lot Communication upgrades to classrooms/office New teacher workstations Security upgrades outside of building

10 Technology Need for more space for labs, repairs, etc More training time for technicians Additional staffGive each child a laptop and support Add additional storage for computer files Automate exchange date between all server with SIF Connect district to internet at much faster speed Allow students to have internal email addresses Install high speech fiber optic cabling between buildings Have inter district television station we could broadcast events to every classroom Frequent meetings with department heads, principals to better serve the needs of staff/students Wireless in every classroom, additional power, video conferencing, telephone