Serving society Stimulating innovation Supporting legislation WCS TG editor Alexander Kotsev, Michael Lutz MIWP-7b sub-group meeting, 12 August 2015
Tasks 1.Update the existing TGs for the implementation of INSPIRE Download Services to cover WCS, based on input and feedback from the MIWP-7b sub-group members (release 1, to be submitted for an internal review of the MIWP-7b sub-group) 2.Draft new TGs for providing coverage data in INSPIRE (D2.10), based on input and feedback from the MIWP-7b sub-group members (release 1, to be submitted for an internal review of the MIWP-7b sub-group) 3.Propose change requests to coverage-related INSPIRE data models and associated data specifications (if required as a result of task 2) 4.Attend the regular MIWP-7b web-conference and present the progress on the drafting of the TGs (outputs from tasks 1 and 2)
Tasks 5.Update both TGs and change requests to address feedback from the MIWP-7b members during the internal review (release 2, to be submitted for a review of the MIG, MIWP-7b and other interested stakeholders) and document the resolution of the comments and changes made on the MIWP-7b collaboration space. 6.Present both TGs (release 2) to representatives of the MIG, MIWP-7b and other interested stakeholders through a webinar. 7.Update both TGs and change requests to address feedback from the MIG and other stakeholders (release 3) and document the resolution of the comments and changes made on the MIWP-7b collaboration space.
Deliverables & indicative timing Deliverables Tentative timetable (dates for T0 = 15/09/2015) 1. Updated chapters of the Technical Guidelines for Download services including WCS (release 1) T0 + 7 w03/11/ New technical guidelines for the use of coverage data in INSPIRE (D2.10) (release 1) T0 + 8 w10/11/ Change requests to INSPIRE data models and associated data specifications (if required) T0 + 8 w10/11/ Updated versions of deliverables 1, 2, 3 (release 2)T w19/01/ Documentation of the resolution of the comments and changes made on the MIWP-7b collaboration space T w19/01/ Presentation delivered to representatives of the MIG, MIWP- 7b and other interested stakeholders in a webinar T w26/01/ Updated versions of deliverables 1, 2, 3 (release 3)T w08/03/ Documentation of the resolution of the comments and changes made on the MIWP-7b collaboration space T w08/03/2016
Procedure Max. contract value: 15k EUR Some administrative questions are still to be clarified If you are interested in providing an offer for this work, please get in touch with Alex and Michael