Private Wildland Fire Resources Crews & Engines Dick Reynolds Contract/Logistics Specialist R5 Fire & Aviation.

Slides:



Advertisements
Similar presentations
1 Union Pacific RR Ramp Rules, Policies, Procedures.
Advertisements

INCIDENT REPLACEMENT Incident Business Meeting May, 2013.
Managing a Successful Mechanical System project Following design – what next?
GREENLAND CONTRACTORS I/S. ■ History ■ Organization ■ Base Maintenance Contract ■ Business Relations ■ Operational Organization ■ Purchasing Policy ■
Kermadine Barton/LuAnn Grover April/May  Ben McGrane: Program Lead & Aviation  Kermadine Barton: Water Handling (Engines and Tenders, Mechanics.
Outsourcing Success Story Santa Rosa County School District So what are you going to say when your Superintendent tells you the district is considering.
Incident Business Workshop Ben McGrane May 3, 2011
Incident Business Workshop Ben McGrane May 1, 2012.
Personnel Qualifications and Responsibilities. Become familiar with:  Prescribed and wildland fire organizational structures.  Qualifications and responsibilities.
Incident Business Updates February 2010 DIANE TAYLOR R8 – INCIDENT BUSINESS COORDINATOR.
Washington State Patrol Office of the State Fire Marshal Unit 4: State Mobilized Apparatus and Equipment.
FIRE SEASON 2009 Changes you Need to Know About Incident Business05/2009.
 At least 5 years experience as a worker  Must pass the state exam.
BUILD WITH US. ™ Contractors
Contractor & Owner Roles in Health & Safety. Safety Topics Contractor Role in Health and Safety Owner Role in Health and Safety.
OSHA Safety and Health Regulations Related to SPF Applications
Last Updated May 24,  Incident Management Overview  AQM Incident Support Roles  Guiding Documents  Procurement Unit Leader (PROC)  Buying Team.
Position Paper - - Position Paper - To the Montana Legislative Fire Suppression Interim Committee March 4, 2008 NRWCA.
Introduction to Fire Protection 3rd Edition
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
Managing the Nursery Business. Next Generation Science/Common Core Standards Addressed! WHST.9 ‐ 12. Develop and strengthen writing as needed by planning,
Chapter 10: Qualification Flow Charts Include Experience Prerequisites Fitness Requirements Training Compliance Qualification Charts are not designed.
April 11, 2007 Strengthening Communities Conference Managing Your Risks Ron Dennill Northern Communities Insurance Program.
National Contracting Updates. CURRENT STAFF Susan Prentiss – Branch Chief Melinda Draper – Contracting Officer Frank Gomez – Contracting Officer Mark.
Incident Base Services Contract Dick Reynolds - COR Contract/Logistics Specialist USFS R5 Fire and Aviation.
K RIEL C OLLIERY Anglo Coal Contractor Management.
Ground Support Unit. Serco Update Serco contractors do not leave R-5 Serco work hours- Minimum 14 Hrs Maximum 16 Hrs Parts ordering done by D.G.R. Ordered.
Transportation Department. 2 History Our present transportation department was fully active in the late 1950s. Prior to that, Ken-Ton contracted with.
February 27, 2008 Incident Acquisition Management National Logistics Workshop Reno, Nevada March 18, 2008.
Spring Fire and Aviation Leadership Team Contracted Resources April, 2006.
Toni Chambers May 19, 2010 Dispatch Processes Update 1.
May 7, 2015 Redmond, OR.  Introduction  Training Cadre  Sign-In Sheet  CLPs for CORs  Logistics  Facilities Layout  Breaks / Lunch.
2003 FIRE SEASON PRESENTER KATHLEEN BLOOD Region 6/Contracting Officer.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement David J. Paveglio Contracts Administrator Laboratory Office Buildings CFAC Review - November 9-10, 2009.
Aviation Safety on the Fire Line Ken Wong. Aviation Safety on the Fire Line The success of our aviation operations on the fire line have several key factors.
Slide 4-1 Unit 4 Slide 4-1. Slide 4-2 Unit 4 Objectives 1.Mobilize, reassign and demobilize overhead resources in a safe and cost effective manner. 2.Describe.
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
“MEDL” Issues and Solutions. Categories Business Cache Dispatch Training Other.
Incident Business Fire Procurement Workshop Fire & Aviation Contracting Team May 19, 2010.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Key learning from recent service strikes Planning for future works; Designated team (group) to visit / assess each location prior to commencement of works.
National Logistics Workshop Boise, ID – 3/1/2011.
B1B AIRCRAFT MAINTENANCE HANGAR DAHA99-01-R-4001 Debriefing July 16, 2001.
Washington State Patrol Office of the State Fire Marshal Unit 5: Command and Support Structure of a State Mobilization.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
My situation this year New ENGB Misunderstanding Perfect storm Slow season Mental issues Wife self-appointed employee rights activist for school district.
Pacific Aviation Investment Program. US$125 m Adaptable Program Loan Phase 1 Phase 2, 3, 4 Objective: improve operational safety and oversight of international.
Forest Service National Incident Business Updates 2016 Incident Business & Procurement Workshop Pendleton, Oregon May 11, 2016 Dana Reid, WO-FAM NIMO.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Bus stop Amenity Cleaning April 13, 2016.
1 Contract Prescribed Burning Gary Starkovich PatRick Corporation Nov. 30-Dec. 1-2, 2004.
Region 5 Incident Procurement Incident Management Team Meetings April 2016.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Inspection, Testing, and Maintenance of Fire Protection and Life Safety Systems.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Southern Marin Fire Report 1/1/2012 – 6/30/2011. Firefighters Wearing Pink to Support Breast Cancer Awareness October 17-23, 2011.
Pacific NW & R-10 Fire Contracting May 11 & 12, 2016.
Region 6 forest service fire procurement
Outsourcing Success Story Santa Rosa County School District
Fire and Aviation Contract Team
SAFE 101 NSC Chapter 22.
Incident Business Specialists
Interagency Firefighting
Health and safety organization on construction site
NWSA Conference February, 2012.
Partnerships Northern Rockies
Wildland Fire Management
Module: Created: April 28, 2003
Always use the correct tools for the job
Start JSA Team JSA Note Inspect Site Hazards Resolve JSA Sign Permit
Presentation transcript:

Private Wildland Fire Resources Crews & Engines Dick Reynolds Contract/Logistics Specialist R5 Fire & Aviation

Current Procurement Types  National Crew and Engine Contracts  Local Contracts  R-6 Crew and Engine Agreements  Local EERAs for Engines All Contracts, Agreements and EERAs terminate prior to the 2005 season and are up for renewal

Basic Contract Requirements Contractor Provides: All necessary tools and equipment for the resource type, including PPE Trained personnel to NWCG or FSH standards All Transportation (except Air) Payroll and workers compensation and liability insurance

National Crew Contracts - 05 Currently being written for 05 by an Interregional Steering Committee. Type 2 IA crews only One-year contract with possible 2 one- year extensions. Contractors bid for Designated Dispatch Points Best Value Contract

Regional Engine Contracts - 05 Currently being written for 05 as a National template to be issued regionally Type 3-6 (NWCG) Engines One-year contract with possible 2 one- year extensions based on performance Contractors bid for Designated Dispatch Points Best Value Contract

Changes for 2005 Consumables available to the Contract Engines and Crew at no charge - AA Batteries - Plastic Sheeting - One Quart Plastic Canteens On site laundry services are available to Contract Engines and Crews.

Best Value Contract Selection Criteria Company experience and past performance in wildland fire suppression Qualifications and experience of key personnel (single resource and squad bosses) Bid price

Pre-Season Inspection Through equipment inspection (GVWR, equipment list, safety check, functionality) Review training records and certifications of key personnel Review experience and qualifications of key personnel

Incident Inspections Mechanical safety inspection of all vehicles Confirm all equipment requirements Check qualifications cards of all personnel Inspect PPE

Questions ?

Nat’l Contract Working Team Neal Hitchcock – Team Leader – NIFC Terry Brown – R6 Kevin Erickson – R1 Guy Pence – R4, Boise NF Julie Vogan – R5 Dick Reynolds – R5