Presentation is loading. Please wait.

Presentation is loading. Please wait.

Spring Fire and Aviation Leadership Team Contracted Resources April, 2006.

Similar presentations


Presentation on theme: "Spring Fire and Aviation Leadership Team Contracted Resources April, 2006."— Presentation transcript:

1 Spring Fire and Aviation Leadership Team Contracted Resources April, 2006

2 Agreement Engines Agreement Tenders Agreement Crews Agreement Strike Teams, Engines and Crews Agreement Falling Modules PNW Contract Engines National Contract Crews Equipment and Training Inventory System (EaTIS) Engine / Tender/Crew/Strike Teams/Falling Module

3 Number of Vendors In 2006, the solicitations were separated so vendors applied to the individual solicitations. 1996199719981999200020012002200320042005 2006 Eng 2006 Tend 102139147122136208265393355358147165

4 Type1996199719981999200020012002200320042005 2006 Pro- posed Type 4263937345086106127837974 Type 5131412573716647 Type 697153165157155237296331318280246 Type 758372483110000 Total194243238204215327410474407363327 Numbers of Engines 1996 – 2006

5 Number of Tenders 1996 – 2006 1996199719981999200020012002200320042005 2006 Pro- posed Type 131133713000 Type 24977717074128160295258250215 Type 32023242117242638404234 Total721019694 159199333298292249

6 Strike Teams of Engines Five Engines of the same ICS Type, staffed appropriately Strike Team Leader with vehicle If the Strike Team is ordered for double shifts, the contractor will provide a Strike Team Leader – Engines for each shift. Only Contractors who have been awarded an Agreement will be authorized to provide a Strike Team. Strike Team Leader(s) Engines and all crew member must be employees of the contractor providing the Strike Team.

7 The Strike Team Leader can only supervise the employees in their strike team. They cannot supervise agency employees or other contractors’ employees. And the Strike Team Leader cannot sign Daily Shift Ticket as Supervisor. Strike Team has to be dispatched as a team, mobilized as a team, utilized as a team and demobilized as a team. Resources cannot be separated or broken apart.

8 If a piece of equipment breaks down, the Incident can choose to continue working the rest of the Strike Team. The engine cannot be replaced by an engine that is not on the Agreement. The rate would be reduced by the respective charge for that individual piece of equipment

9 Strike Teams of Crews Two crews offered by one Contractor with same dispatch location 41 properly trained employees Strike Team Leader for Crews with 4x4 vehicle Two crew bosses Six squad bosses 32 crew members Strike Team Leader for Crew trainee can work with STLC, with no agency compensation

10 Crews must arrive at the incident at the same time Cost – combination of cost of the two crews plus STLC

11 Subsistence When fire camp is not available and commuting is not feasible: Engines / Tenders Conus – $40 per person for lodging, plus $25 for food / drink Crews $50 per person for lodging, plus $39 for food / drink

12 Regional Contract Engines Type of EngineNumberLocation Type 65Okanogan Type 65Colville Type 610Klamath Falls Type 65LaGrande Type 65Grants Pass Type 65Pendleton Type 65John Day Type 44Bend Type 66Bend

13 SCHEDULE OF SERVICES NATIONAL TYPE 2-IA HANDCREW SERVICES ITEM NOTYPE CREW QTYPROXIMITY TO HOST UNIT (miles radius) HOST UNIT COORDINATION CENTERMANDATORY AVAILABILITY PERIOD 1IA2 ea50 milesWenatchee N.F. Wenatchee, WA6/1-9/30 2IA2 ea50 milesColville N.F., Colville WA6/1-9/30 3IA2 ea50 milesWallowa/Whitman N.F., La Grande, OR6/1-9/30 4IA2 ea50 milesUmatilla N.F., Pendleton, OR6/1-9/30 5IA2 ea50 milesMalheur N.F., John Day, OR6/1-9/30 6IA4 ea50 milesDeschutes National Forest6/1-9/30 7IA3 ea50 milesSiskiyou N.F., Grants Pass OR6/1-9/30 8IA3 ea50 milesWinema N.F., Klamath Falls OR6/1-9/30 9IA2 ea50 milesWillamette N.F., Oakridge OR6/1-9/30

14 National Crew Contract Contract Crew can be assigned to Type 5 incidents – Type 2 Initial Attack configuration at local unit direction Cannot direct or control government employees Cannot direct or control another vendor’s employees

15 IC5 – Type 2 IA Crew Responsible to Agency Administration All coordination and support operations are through the agency duty officer or Type 4 or higher Incident Commander Contractors can obtain experience requirements Coach / evaluator – qualified Type 5 Incident Commander or higher

16 EaTIS December 22, 2005 – Ron Hooper, Director of Acquisition Management Decision to implement EaTIS nationally in 2006 Based on need for standardization of EERA equipment and methods of hire

17 Need to streamline incident business processes Acquiring Ordering Utilizing and Paying incident resources Recommendations included in GAO audit of Forest Service EERA

18 February 6, 2006 Scaled back implementation of EaTIS Three Regions Piloting EaTIS in 2006 Region 1 Region 5 Region 6 and Two BLM units