SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.

Slides:



Advertisements
Similar presentations
March 1, Why an interchange at this location? TH 15 Corridor Study 2007 Nine Signalized intersections Six in Top 50 High Crash Cost Study outcome.
Advertisements

Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Lec 33, Ch.5, pp : Accident reduction capabilities and effectiveness of safety design features (Objectives) Learn what’s involved in safety engineering.
US 52 Corridor Study Public Meeting November 15, 2010.
May 13 th, 2014 City of Akron, Ohio Intersection Safety Study State Route 59 / Main Street / Howard Street.
Hardin County Engineering Department September 12, 2006.
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
US 1 CORRIDOR STUDY AND PROJECT PRIORITIZATION PROCESS Augusta, GA November 29, 2012 Jeff Carroll CDM Smith Georgia Association of MPOs Annual Conference.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Paula J. Trigg, County Engineer Public Works and Transportation Committee May 7, 2014 MODERNIZATION PROJECTS EXPANSION PROJECTS PROPOSED HIGHWAY.
City of Little Rock Public Works – Traffic Engineering Division City of Little Rock City of Little Rock Dallas Phasing Implementation Rodney Parham Road.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
SAFETY FUNDING APPLICATION STA STA-62 & Harrisburg/Middlebranch and Harrisburg Rd & 30 th St. Safety Improvements.
May 13 th, 2014 Portage County, Ohio Tallmadge Road Corridor and Interchange Improvement Project.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
The Roads Ahead Leroy D. Alloway, Director Community Development.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
T.H. 23 / SOUTH SARATOGA STREET REDUCED CONFLICT INTERSECTION AND PEDESTRIAN OVERPASS PROJECT PROJECT HEARING June 10, 2014 City Council Presenters Glenn.
University of Minnesota Intersection Decision Support Research - Results of Crash Analysis University of Minnesota Intersection Decision Support Research.
STA Safety Project PID #76439 December 12, 2006.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
MANATEE COUNTY TRAFFIC SIGNAL RETIMING Orange Blossom Trail (SR 500/US 441) from Oak Ridge Road to I-4 FPID Design Phase Public Information.
1 CEE 763 Fall 2011 Topic 3 – Safety Management Process – Other Steps CEE 763.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
US 25 Corbin to London Citizens Advisory Committee Meeting December 2011.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Peachtree Road Transformation Project: Operations and Safety Analysis P.I Fulton County August 25, 2015 Buckhead CID 1.
Created by: Joshua L. Hochstein Tom Maze & Tom Welch September 2008 Iowa State University’s Center for Transportation Research and Education (CTRE) administers.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
October 15 th, 2013 The City of Akron SUM – Exchange Street / Cedar Street Corridor Safety Study.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
TRAC Presentation October 13, 2015 BEL-70-Mall Road Connector “Commons Mall Crossing” PID Belmont County Transportation Improvement District.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Keith Smith, P.E. ODOT District 8 Environmental Engineer October 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
PUBLIC INFORMATION MEETING Ridgewood Avenue Safety Improvement Project From North of Falcon Avenue / Riverside Drive to North of Lamont Street in Volusia.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Visit Our Website at: Click to edit Master title style.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
The I-465 West Leg Reconstruction Project
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Chapin Town Hall Meeting
District 6 – Safety Applications
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Highway 14 – Owatonna to Dodge Center District 6 Update
General Tab Project, Cost Schedule, and Work Limits Roadway Character
SR 25 – Hoosier Heartland Highway Lafayette to Logansport
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Lyle Parkway to SR 540 (Winter Lake Road)
Traffic Study Presented by Keith Wenners, pe, ptoe
Contract 60X10 Informational Meeting Weber I-55
Comprehensive Transportation Plan
General Tab Project, Cost Schedule, and Work Limits Roadway Character
West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.
Presentation transcript:

SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements

Background SUM-CR66 Canton Rd Safety Study – County Engineer  SUM-CR66 Canton Road PID82594  Originally awarded: $481K PE + $2 million CO Safety approved Fall 2006  Raised median between US224 and Arcadia  1 mile widening 4 to 5 lanes south of Arcadia to Sanitarium  New signal at Springfield Lake Drive intersection (completed 2012)  Access management  Sidewalk / Bikepath along west side

Background SUM-SR91/CR66 (US224 jct) Safety Study – ODOT  SUM Canton Rd PID89113  Originally awarded: $350K PE Tier II Safety approved Spring 2010  Dual NB LT lanes and new EB RT lane at US224 intersection  Eliminate/relocate driveways between US224 and Old Home  Widening 4 to 5 lanes north of Old Home to Linwood  Access management  Redoubles need for County project’s raised median south of US224

Background Canton Road Access Alternative Study SUM Canton Rd PID  Widening for dual LT on south leg encompasses the length of the raised median on the south leg of the US224  ODOT assumes northern end of SUM- CR66 Canton Rd PID – Raised median  Inherited need to address directional access for business drives given concerns raised at previous pubic meetings for SUM-CR66 Canton Rd PID 82594

Canton Road Access Alternative Study Rear Service Road Alternatives

Canton Road Access Alternative Study U-Turn Alternatives

US224 CR66 SR91 SR91 at Linwood Road CR66 at Springfield Lake Drive

Co-Sponsored Safety Funding Application SUM-CR66 Canton Road PID82594 SUM Canton Rd PID89113 SUM-SR91/CR66 Canton Rd PID89113

Location Safety Ranking Chronic high crash location(s)  SR91 Section north of US224  2011 SA Urban NonFwy  Chronic HSP Location (2008 HSP #3 – Safety Study)  History of identification on past Hot Spot and Congestion Lists  Persistently identified on AMATS High Crash List – Top 50 (2008 AMATS #2; currently 2012 #30)  US224 at SR91/CR66 Intersection  2012 SA Urban Intersection #16  Chronic HSP Location  2012 AMATS #5  CR66 Section south of US224  Persistent appearance on AMATS High Crash List - Top 50 (2008 AMATS #7; currently 2012 #9)

Crash Data Summary,

Collision Diagram, SUM CR-66 Canton Road Corridor south of US-224

Collision Diagram, SUM SR-91 Canton Road Corridor north of US-224 SUM US-224 at SR-91 Intersection

Problem Statement  SR-91/CR-66 Canton Road section is heavily congested area at the US-224 intersection  Rear-end and left turn angle crashes at the US-224 intersection  Prominent NB left turn / EB right turn traffic volumes  Significant delay/back-ups at the signal.  Numerous commercial driveways within functional area of intersection  Access/Driveway Issues  Angle, sideswipe and rear-end crashes due to left turn ingress/egress at driveways  Numerous high traffic generating commercial drives

Recommendations US-224 Intersection  Create dual NB LT lanes  Add EB RT lane at US224 intersection Canton Road CR-66 south of US-224  Add raised median on south leg to just south of Meadows/Arcadia  Widen 4 to 5 lanes to Springfield Lake Drive  Provide pavement for U-turns at Springfield Lake Drive  Access Management – Driveway definition  Sidewalk on west side Canton Road SR-91 north of US-224  Eliminate/relocate driveways between US-224 and Old Home  Widen 4 to 5 lanes to Linwood  Provide pavement for U-turns at Linwood  Access Management – Driveway definition  Sidewalk on east side

Proposed Conceptual US 224 at Canton Road Intersection

Proposed Conceptual CR66 Canton Road South of US 224

Proposed Conceptual SR91 Canton Road North of US 224

Capacity Analysis  Significant Reduction in Overall Delay for Peak Hours

Rate of Return Analysis  RW and Construction estimates adjusted with higher contingency to credibly meet the project expense  Acquisition costs  Urban setting with dense commercial development.  Rate of Return is conservatively still about 13% on total cost

Project Funding Plan PID89113  Local funding commitment  ODOT administer project; Spring programmatic  Funding plan totals do not include any prior projects’ funding

Safety Funding Application PID Note: The remaining 4HJ7 funding in PID82594 ($1.78 million FY2016) would return to the safety fund once the environmental document is complete