West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.

Similar presentations


Presentation on theme: "West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer."— Presentation transcript:

1 West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner
Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer

2 Dec 2016 - Corridor Management Plan Recommendation:
Purpose Determine feasibility of reducing number of lanes on West Cervantes from 4 to 2 Lanes between Dominques and A Streets Dec Corridor Management Plan Recommendation: Option B (Road Diet) Option B: West Cervantes Street Road Diet – East of Pace Boulevard. Eliminate two travel lanes and add landscaped median and on-street parking

3 Project Limits Study Area 2.25 miles
As defined by December Corridor Management Plan

4 What does this study cover?
In this Study Not in this Study Traffic Analysis & Results Final Recommendation Conceptual Designs Public Involvement Environmental Analysis FDOT Safety Improvements Any recommendation to proceed with lane elimination study is at discretion of FL-AL TPO.

5 Basis of Analysis Conservative Growth Rate
-0.35% historical, 0.5% used Traffic and Pedestrian Counts Crash Analysis Analysis Scenarios Existing 2019 Conditions No-Build 2045 Alternative (4 lanes) Build 2045 Alternative (2 lanes) Build 2045 Alternative (2 lanes) with 20% Diverted Traffic [Scenario A] Build 2045 Alternative (2 lanes) with 10% Diverted Traffic [Scenario B] Parallel Corridor Analysis Basis of Analysis

6 Average 5 min Average 6 min
Travel Time (minutes) Average 5 min Average 6 min

7 Average 21 mph Average 26 mph
Average Speed (mph) Average 21 mph Average 26 mph

8 No Build Build 20% Diverted Traffic 10% Diverted Traffic PM Peak Hour
West Cervantes Street North Pace Blvd Queuing PM Peak Hour No Build Build 20% Diverted Traffic 10% Diverted Traffic

9 West Navy Boulevard / West Garden Street:
East of North Pace Boulevard There is sufficient capacity if traffic is diverted with the lane elimination. East of North W Street West of North W Street West Jackson Street: East of North Pace Boulevard East of North W Street West of North W Street

10 Additional queuing anticipated Build 2045 (2 lanes)
Summary Additional queuing anticipated Build 2045 (2 lanes) PM conditions worse than AM Average speed could be as much as 13 mph lower Travel time could be as much as  5.6 minutes longer with diversion to grid network Improved delay and queuing with diversion to grid: 20% diversion: minutes  5.6 minutes 10% diversion: minutes  7.3 minutes Sufficient capacity on parallel corridors W. Navy Blvd. / W. Garden St. and W. Jackson St.

11 24-29 mph mph 12-29 min No Build Speeds Build Speeds Travel Time 90%
However Enhanced Safety 24-29 mph 90% 10% Build Speeds 12-29 mph with and without diversion Travel Time <1up to 6 min If hit by a person driving at: Person survives the collision Results in Fatality with and without diversion not accounting for bus stops