BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT

Similar presentations


Presentation on theme: "BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT"— Presentation transcript:

1 BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
STUDY COMMUNITY DEVELOPMENT DEPARTMENT

2 Presentation Objective
To provide City Council with a path to improving safety and operations for the corridor.

3 Strategic Action Plan Objective 1.1: To enhance infrastructure in order to maintain quality neighborhoods and business districts Objective 1.2: To assess the need to expand infrastructure for sustainable growth Strategy 1.2.2: Coordinate facility capacity upgrades to meet the City’s growth needs appropriately Objective 5.2: Enhance safety measures throughout the community Strategy 5.2.2: Continue to enhance safety improvements at intersections and along roadways

4 Project Overview Project Limits Intersections Analysis Variables
Belle Terre Blvd/Pkwy from US 1 to Pine Lakes Pkwy (8.8 miles) Intersections Nine (9) signalized Twenty-one (21) unsignalized Analysis Variables Intersection Delay Crash Data Volumes

5 Existing Conditions Belle Terre Blvd from US 1 to SR 100
Length Miles 80 foot Right of Way Two 11 foot travel lanes 10 foot path on the west side of the roadway Single Family Residential Land Use

6 Existing Conditions Belle Terre Pkwy from SR 100 to Pine Lakes Pkwy
Length Miles 125 & 150 foot Right of Ways Four 12 foot travel lanes with 20 foot median 6.5 foot sidewalk on the west side of the roadway 10 foot path on the eastside of the roadway Single Family Residential Land Use Commercial Land Use exists from Central Avenue to SR 100

7 Existing Conditions – Intersection Delay Analysis
Belle Terre Blvd from US 1 to SR 100 All intersections operate at an acceptable LOS Belle Terre Pkwy from SR 100 to Pine Lakes Pkwy All intersections operate at an acceptable LOS, except Belle Terre Pkwy at Eastwood Drive/Market Avenue Belle Terre Pkwy at Pine Grove Drive

8 Existing Conditions – Crash Analysis
Intersections with 10 or more crashes (2012 to 2015) at SR 100 – 50 Crashes at Eastwood Dr/Market Ave – 19 Crashes at Easthampton Blvd/Central Ave – 27 Crashes at Royal Palms Pkwy – 30 Crashes at Rymfire Dr – 13 Crashes at Ponce DeLeon Dr – 10 Crashes at Pine Grove Dr – 20 Crashes at Whiteview Pkwy – 18 Crashes at Parkview Dr – 14 Crashes at Pine Lakes Pkwy – 19 Crashes

9 Existing Conditions – Crash Analysis
Crash Types

10 Traffic Volumes – Existing and Future Conditions
Existing and Future Volume Ranges Roadway Existing Future Belle Terre Blvd 3,900 to 7,200 7,100 to 13,000 Belle Terre Pkwy 24,000 to 28,000 31,000 to 36,000

11 Future Conditions – No Build (No Improvements)
The following intersections will perform at an unacceptable LOS at SR 100 (AM and PM) at Eastwood Dr./Market Ave (AM and PM) at Easthampton Blvd/Central Ave (PM) at Royal Palms Pkwy (AM and PM) at Point Pleasant Dr. (PM) at Ponce DeLeon Dr. (PM) at Pine Grove Dr. (AM and PM) at Whippoorwill Dr. (AM and PM) at Pritchard Dr. (AM and PM) at Parkview Dr. (N) (AM and PM)

12 Future Conditions – Build (Improvements)
Future improvements provide the following benefits: Address LOS deficiencies Improve operations Improve safety on the corridor for motorists, pedestrians, and bicyclists

13 Future Conditions – Build (Improvements)
Right Turn Lane Improvements At SR 100 – Northbound At Easthampton Blvd/Central Ave – Eastbound At Royal Palms Pkwy – Westbound, Northbound & Southbound At Point Pleasant Dr. – Northbound At Ponce DeLeon Dr. – Northbound At Pine Grove Dr. – Northbound At Whippoorwill Dr. – Southbound At Pritchard Dr. – Northbound Left Turn Lane Improvements At SR 100 – Eastbound

14 Future Conditions – Build (Improvements)
Median Restrictions at Pine Grove Drive - Eliminate WB left turn movement from Pine Grove Dr. Pedestrian Improvements at Whiteview Pkwy – New marked crosswalk across the northside of the intersection to include pedestrian signals Signal Improvements Optimize Signal Timings at Eastwood Dr./Market Ave – Need Warrant Study for potential traffic signal

15 Future Conditions – Build (Improvements)
Signage Improvements - Pedestrian-Bicyclist Safety Unsignalized Intersections Signalized Intersections

16 Future Conditions – Build (Improvements)
Signage Improvements – Motorist Assistance

17 Improvement Priorities
Install Pedestrian/Bicyclist Signage along the entire corridor Traffic Signal Optimization At Whiteview Pkwy New marked crosswalk across the northside of the intersection to include pedestrian signals At Pine Grove Dr Add Northbound Right Turn Lane Median Restriction - Eliminate westbound Left Turn from Pine Grove Dr. At Royal Palms Pkwy Add NB, SB and WB Right Turn Lanes At Easthampton Blvd/Central Ave Add EB Right Turn Lane

18 Improvement Priorities
At Whippoorwill Drive Add SB Right Turn Lane At Point Pleasant Dr Add NB Right Turn Lane At Ponce DeLeon Dr At Pritchard Drive At SR 100 Add NB Right Turn Lane (Transportation Impact Fee Funded) Add EB Left Turn Lane (FDOT funding) At Eastwood Dr/Market Ave Signalize

19 Next Steps Include proposed improvements into the 5-year and 10-year Capital Improvement Plan

20 Questions? Palm Coast Pkwy includes Old Kings Rd and Cypress Point Pkwy