LHCb Experimental Area Meeting 9.05.2007V. Bobillier1 Earth network in UX85 experimental cavern.

Slides:



Advertisements
Similar presentations
IBL Vacuum Box in UX15 Short summary Andrzej Zmuda
Advertisements

N. Dos Santos1 TX54 Mobile Shielding Door 106th CEMESTE – N. Dos Santos/ TS-LEA Floor steel plates and anchors system Chassis assembly Chassis.
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
NSS Requirements Review: Utilities Michelle Everett Lab Coordinator Scientific Activities Division November 12, 2014.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
1 Installation of Delphi Frame  ITS Installation.
LHCb EP/LBD V. Bobillier 1 Cables and chicane mock up What we would like to define or test with the mock up: if the installation (of both cable.
Gas systems for GIF++ 14/02/2015 Ernesto Regaño 1.
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
December 3, 20031Muon Integration Meeting B. Schmidt Introduction: The present architecture of the Muon System is based on the assumption that the maximal.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Construction and Installation of the CLIC Experimental Area
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
BDS Design Studies John Amann ILC Mechanical Engineering 10/24/06.
EDMS Nr /02/ tons, Platform – Q = daN, aprox. length to cover 4 m Cabling Groove – Q = 500 daN, aprox.
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
1 FD Support and Pacman for GLDc 27 Aug Yasuhiro Sugimoto KEK.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
CBM Building and Infrastructure
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
Upgrade news and Proposed interventions during YETS for the Muon Barrel Alignment Szillási Zoltán, Béni Noémi (ATOMKI ) This project is supported by Hungarian.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS :
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
H.TauregTechnical Forum June B and T monitoring News on B field mapping B field monitoring Temperature monitoring.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
Expt. Area meeting – December V. Bobillier1 Cabling installation status.
LHCb Radiation Shielding Wall – Status Wall Description Front Part 1 Aprox. 6 m Front Part 2 Aprox. 6.6 m Labyrinth.
Hall D Civil and Cryogenic Issues Ravi Anumagalla.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
GROUNDING, SHIELDING & COOLING ISSUES ON LHCb ELECTRONICS AT THE LHC PIT 8 V.Bobillier, J.Christiansen, G.Corti, D.Lacarrère, R.Lindner, L.Roy, E.Thomas,
V. Bobillier1 Cable installation status.
LEB meeting March 21 st, 2012 LHCb Survey Tolerances and Stability estimation Jean-Christophe Gayde March 21 st, 2012 LEB Meeting - EDMS n° XXXXXXX1March.
Proposal for routing of ATLAS TAXS region HL-LHC WP8.
1 Cabling from sub-detectors Current thinking V.Bobillier L. Roy.
VELO Integr - Jan06Jean-Christophe GAYDE TS/SU EDMS n° SURVEY FOR VELO INSTALLATION 1.SURVEY AT GROUND FLOOR - FIDUCIALISATION 2.SURVEY FOR INSTALLATION.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
ESS Grounding System Concept Fundamentals and Requirements
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
LBNF CAD models, Drawings and Component list
Update of MVD services and requests
The LHCb Installation Story
VELO-installation meeting CERN, January 17, 2006
LHC Experimental Vacuum Systems Status October ‘07
n_TOF “Draft” plans for YETS and LS2
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Question & Suggestions March 17th
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
Inner DET. Integration Inner detector envelope Radial clearances.
Компания Reichle & De-Massari (R&M)
Presentation transcript:

LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern

LHCb Experimental Area Meeting V. Bobillier2 Earth interconnections with 120 mm2 copper cable PZ shaft Counting house Detector area Shielding wall LHCEIE__8014

LHCb Experimental Area Meeting V. Bobillier3 General earth network in UX85 experimental cavern can be seen on this drawing (CDD): LHCEIE__8014 Actual status: All earth interconnections on the side walls of the cavern (along the cable ducts) have been made. Connections to supporting rails of rolling bridge have been done. Connection in the counting house have already been made. Connection of metallic structure: It has been decided to connect the main parts only (example: supporting feats and beams) Earth connections on the cavern floor are partially in place. Still some cable to be installed.

LHCb Experimental Area Meeting V. Bobillier4 Earth interconnections with 120 mm2 copper cable PZ shaft Counting house Detector area Shielding wall

LHCb Experimental Area Meeting V. Bobillier5 Counting house Connection to the earth plate on the cavern wall PZ shaft Connection to all metallic rails in the floor when possible

LHCb Experimental Area Meeting V. Bobillier6 Counting house Connection to the earth plate on the cavern wall PZ shaft Connection to all metallic rails in the floor when possible

LHCb Experimental Area Meeting V. Bobillier7 Earth interconnections with 120 mm2 copper cable PZ shaft Counting house Detector area Bunker region Connection to the bunker racks earth (earth cable in the groove) Connection to the earth plate on the side wall Beam pipe axis (Connection to all metallic rails)

LHCb Experimental Area Meeting V. Bobillier8 Earth interconnections with 120 mm2 copper cable PZ shaft Detector area Bunker region Connection to the earth plate on the side wall (Connection to all metallic rails) Connection to the bunker racks earth (earth cable in the groove) (Connection to all metallic rails)

LHCb Experimental Area Meeting V. Bobillier9 Questions…